Loading...
Pipeline 06 27 2014N E W S The Pipeline-,--:--- � w LETTER' D®< Public Works , .k el Iv Engineering °_ AA kA 11 Code Enforcement June 7, 2014 Public Works The Parks Crew fixed the bathrooms at Kensington Park because of vandalism. Signs were repaired at the Pilot Knob site. They graded/leveled the ball fields at Mendakota Park and did other prep work for the tournament this weekend. Grass was cut. They worked on the new truck. Soccer and ball fields were striped. Brush was picked up throughout the city from downed limbs. The Utilities Crew checked the lift station daily. The storm lift station's pump 2 is in for repairs for the seals and bearings. The force main had a break which will be repaired during the Victoria Road construction. Sanitary sewer lines were cleaned on Hazel Court, Havenview Court, Pagel Road easement, Pueblo Lane, Mohican Lane, Mohican Court, Pueblo Drive, Apache Street and Havenview Court. The Streets Crew hauled concrete bunkers and 150 tons of gravel down to Jack's Manufacturing on Highway 13 to help with the flooding. A heavier manhole cover was put in place in that area also. Blacktopping was done on Marie Avenue. They helped work on dump truck 304. Weeds are being cut along the streets. Black dirt and rip rap was brought to the washed out storm pipe on Fieldstone. Engineering City Projects (construction year) Hunter Lane/Orchard Place Neiahborhood Improvements (2013) - The project is considered substantially complete and the final lift of wear course asphalt will be placed in early July, and punch list items will be identified and corrected by the contractor. The wear course of pavement, originally scheduled for installation in June, has been delayed due to weather. Highway 13 Trail Connection (20141 - Construction is anticipated to begin in July. A water main will need to be lowered in conjunction with this project. Saint Paul Regional Water Services will lower the main as soon as they have a crew free to do the work. The contractor is ready to start immediately after the water main correction. Victoria Road Reconstruction & Rolling Green Neighborhood Rehabilitation (2014/2015 - The first (2014) phase of the project will reconstruct Victoria Road from Lilydale to Marie Avenue and rehabilitate the Stratford/Walsh/ Rolling Green neighborhood. The Lilydale portion of Victoria Road from Caren Road to Highway 13 is included in the 2014 construction phase. A pre -construction meeting was held Thursday afternoon, and construction is expected to begin July 21st. Utilities will be located and temporary water main will be installed over the next three weeks. The remainder of Victoria is anticipated for construction in 2015. Wentworth Avenue & Pilot Knob Road Trail Rehabilitation Projects (2014) -- The trails on Wentworth (Wachtler to Dodd) and Pilot Knob Road (I-494 to Highway 13) are scheduled for rehabilitation this summer. The project was awarded with the Victoria Road/ Rolling Green Neighborhood project, and construction is expected to begin in July. Limited Use Permits for portions of the trails in MnDOT right-of-way will need to be approved, and will be brought to City Council at a future meeting. Preventative Maintenance (Crack Sealing & Sealcoating) Contract (2014) - Crack sealing is complete, and sealcoating will follow in July for designated neighborhoods. Those scheduled to receive a chip seal coat on their streets are Park Place, Highland Heights including Mayfield Heights Road, Copperfield, and North Ivy Falls. Additional neighborhoods are receiving crack sealing only. Homeowners are not assessed or billed for this work. Marie Avenue/I-35E Erosion Repairs (2014) - Staff has been working with MnDOT on a project to repair erosion that has taken place in the northeast quadrant of the Marie Avenue and I -35E intersection. The erosion has exposed some utility pipes and conduits that need to be repaired, and drainage will be altered to prevent further erosion. Under the terms of the City's agreement with MnDOT, the State has designed the project, and the City will administer the construction contract. Authorization to bid the project has already been granted by City Council, and as soon as staff receives the final pieces of information from MnDOT the project will be advertised. Bid opening is expected 3 weeks after advertisement. County Projects Delaware Avenue Resurfacing (2014 - Dakota County will be resurfacing Delaware Avenue from Highway 110 south to I-494. This project will not widen or alter the lane alignment of Delaware, but will provide a new asphalt driving surface and new striping. The 2-3 week construction project is expected to begin in late July. Lexington Crosswalk at Victoria (2014 - This project will install a center median in Lexington on the north side of the Victoria intersection and provide for a crosswalk to connect the trails on the east and west of Lexington. The left turn lane from southbound Lexington to eastbound Victoria will be removed. Construction is expected to begin during the first week of August. State Proiects Highway 149 (Dodd Road) Sealcoating (20141 - The State has given Dodd Road a chip seal treatment this past week. Originally scheduled for June 10th & lith, the schedule slipped due to weather. Some pavement repairs were completed at the Wentworth intersection prior to the chip seal. This is a pavement life extension project until Dodd Road is resurfaced in 2017. Highway 13 Landslide (Lexington to 2nd Street - Mendota) - Earlier in June, the slope below Highway 13 in Mendota failed, blocking the Big Rivers Regional Trail. Highway 13 was closed temporarily for MnDOT to repair the slope. The highway is now re -opened, but the trail remains closed indefinitely. This issue is anticipated to be solved by MnDOT's 2015 reconstruction project of Highway 13 from Mendota to I -35E. Highway 13 Landslide (Sylvandale to Wachtler� - The landslide from last week that blocked a portion of Highway 13 has been cleaned up. Highway 13 was closed, but is now re -opened. MnDOT is working on a slope repair for their portion of the landslide area. Highway 149 (Dodd Road) Reconstruction (I-494 to Highway 55 - Eagan) - This project is scheduled to begin on June 30th, and will reconstruct Dodd Road from the I-494 Interchange to Highway 55 in Eagan. Construction is expected to be substantially complete this summer. Detours will be posted as needed. I -35E Drainage Washout - MnDOT will be repairing a storm drain culvert on the east side of I -35E between Marie Avenue and Highway 13. The recent storms have caused a downstream washout of soil. MnDOT will be repairing the erosion, and adjusting the drainage culvert. This work is estimated to be complete by July 11th. Brief lane closures on northbound I -35E should be expected throughout the project.