Pipeline 06 06 2014NEWSThe Pipeline =�;
LETTER �_�_
Public Works..
Engineering June 6, 2014
Code Enforcement
Public Works
The Parks Crew did their daily trash pickup. The fields were dragged,
striped and chalked. The drinking fountain at Mendakota Park was repaired.
They helped Cliff install the Tommy gate on truck #503. A large limb was
removed from Marie Park that was hanging over the playground equipment.
Grass was cut throughout the parks. Mendakota Park was prepared for the
Mendota Heights Parks Celebration.
The Utilities Crew checked the lift stations daily. There was a call on
Sunday at 9:20 a.m. because of high water at the Mendota Heights Road lift
station. The pumps needed to be reset. He was also called to Victoria
Curve because of a possible sewer back up. The city's sanitary sewer line
had no problem; the problem was in the home owner's service. Roots were
cut in sanitary sewer lines along Hiawatha Avenue, Hingham Court, Callahan
Place, Caren Road, and the Caren Road easement. Sanitary sewer lines
were cleaned along Monet Lane, Monet Court, the easement on Westview
Terrace, Pond Haven Lane, Pond Haven Circle and Bridgeview Court.
The Streets Crew blacktopped the James Road and Douglas Road area.
Storm sewer culverts were cleaned at Marie Avenue and Dodd Road and at
Highway 13 and Wachtler Avenue. Culverts were also cleaned in the
Copperfield area.