Pipeline 05 23 2014N E W S The Pipeline LETTERT�� Public Works Engineering Ir Code Enforcement p May 23, 2014441 Public Works The Parks Crew cut the grass and picked up trash in the parks. The fields were striped, dragged and chalked. A drainage ditch was installed on the soccer fields at South Kensington Park. The spill way was cleaned out of trees and tree limbs in Valley Park. The Streets Crew spent the week with the street sweepers. The entire City has now been swept for the spring. The Utilities Crew was called in on Sunday morning at 9:00 a.m. for a power outage at the Northland lift station. Power was restored at 11:00 a.m. The lift stations were checked daily. The fire hydrants in Friendly Hills were painted. Broadleaf weeds were sprayed at the Par 3, Rogers Lake, Friendly Hills Park, North and South Kensington Park, Hagstrom King Park and Marie Park. Top soil was hauled to Kensington Park. The utilities seasonal employee started on Monday. Engineering City Projects (construction year) Hunter Lane/Orchard Place Neighborhood Improvements (20131 - The project is considered substantially complete and the final lift of wear course asphalt will be placed by mid to late June. Highway 13 Trail Connection (20141 - Construction is anticipated to begin in late May or early June. A watermain will need to be lowered in conjunction with this project. Staff is coordinating between Saint Paul Regional Water Service and the trail contractor to work the repair into the schedule. Victoria Road Reconstruction & Rolling Green Neighborhood Rehabilitation (2014/2015 - The first (2014) phase of the project will reconstruct Victoria from Lilydale to Marie Avenue and rehabilitate the Stratford/Walsh/ Rolling Green neighborhood. The Lilydale portion of Victoria from Caren Road to Highway 13 is included in the 2014 construction phase. A Joint Powers Agreement (JPA) with Lilydale has been approved by both City Councils. The remainder of Victoria was put off to a future date, but it is anticipated for construction in 2015. Bid opening is scheduled for May 28th, and a contract award is anticipated to be before Council at their June 3rd meeting. Construction is expected to begin in late June. Wentworth Avenue & Pilot Knob Road Trail Rehabilitation Projects (2014) -- The trails on Wentworth (Wachtler to Dodd) and Pilot Knob Road (Mendota Heights Road to Highway 13) are scheduled for rehabilitation this summer. Projects will reclaim the existing pavement; install ADA compliant ramps, and a new paved surface along each trail. Dakota County is participating in cost sharing since these trails are in County right-of-way. The project will be bid with the Victoria Road/Rolling Green Neighborhood project, and construction is expected to begin in July. Limited Use Permits for portions of the trails in MnDOT right-of-way will be on the City Council agenda at their June 3rd meeting. Preventative Maintenance (Crack Sealing & Sealcoating) Contract (2014) - Crack sealing will being next week with sealcoating to follow in July. Neighborhoods receiving a chip seal coat on their streets are Park Place, Highland Heights including Mayfield Heights Road, Copperfield, and North Ivy Falls. Homeowners are not assessed or billed for this work. County Projects Delaware Avenue Resurfacing (2014 - Dakota County is planning on resurfacing Delaware Avenue from Highway 110 south to I-494. This project will not widen or alter the lane alignment of Delaware, but will provide a new asphalt driving surface and new striping. The 2-3 week construction project is expected to begin in late July. Lexington Crosswalk at Victoria (20141 - This project will install a center median in Lexington on the north side of the Victoria intersection and provide for a crosswalk to connect the trails on the east and west of Lexington. The left turn lane from southbound Lexington to eastbound Victoria will be removed. Construction is expected to begin in July. State Projects Highway 110 & Lexington Avenue Signal Replacement (2014) - Construction is underway. The existing signal will be replaced with a new LED signal with a flashing yellow arrow for the Lexington left turn lanes. Also included in the project are new ADA compliant pedestrian ramps and signals, and new crosswalk striping. The contractor has until May 20th to complete the project.