Loading...
Pipeline 05 15 2014N E W S LETTER Public Works Engineering Code Enforcement Public Works ."..� IN The Pipeline May • 2014 A daring rescue took place at South Lane and the Highway 110 Frontage Road. Some poor little ducklings fell into the .M i:. storm drain and were �- separated from mom. Two Public Works employees jumped in the storm drain and had the ducklings out in 15 minutes to reunite with mom. The Parks Crew did their daily trash pickup. The ball fields were dragged and the grass cut. The soccer and ball fields were striped. Crab grass preventative was applied at Mendakota Park, City Hall, Fire Hall and Victoria Highlands Park. The sprayer was hooked to the Kubota. The Utility Crew checked the lift stations daily. He helped the Street Crew with blacktopping. Spraying of broadleaf weeds was done at Public Works, Mendakota Park, the Fire Hall and Kensington Park. He helped rescue the ducklings at South Lane and Highway 110 Frontage Road. The Streets Crew blacktopped Mendota Heights Road and the Highway 110 Frontage Road. A damaged mailbox was replaced. The trucks were prepared for street sweeping. Engineering City Projects (construction year) Hunter Lane/Orchard Place Neighborhood Improvements (2013) - The project is considered substantially complete and the final lift of wear course asphalt will be placed in the spring. Highway 13 Trail Connection (2014) - Construction is anticipated to begin in May. A watermain will need to be lowered in conjunction with this project. Staff is coordinating this issue between Saint Paul Regional Water Service and the trail contractor to work the repair into the schedule. Victoria Road Reconstruction & Rolling Green Neighborhood Rehabilitation (2014/2015) - The first (2014) phase of the project will reconstruct Victoria from Lilydale to Marie Avenue and rehabilitate the Stratford/Walsh/ Rolling Green neighborhood. The Lilydale portion of Victoria from Caren Road to Highway 13 is included in the 2014 construction phase, and staff is drafting a Joint Powers Agreement with Lilydale for this work. The remainder of Victoria was put off to a future date, but it is anticipated for construction in 2015. A Joint Powers Agreement (JPA) was approved by the Lilydale City Council at their May 12th meeting. The same JPA will be before the Mendota Heights City Council for approval at their May 20th meeting. Wentworth Avenue & Pilot Knob Road Trail Rehabilitation Projects 2014) - The trails on Wentworth (Wachtler to Dodd) and Pilot Knob Road (Mendota Heights Road to Highway 13) are scheduled for rehabilitation this summer. Projects will reclaim the existing pavement; install ADA compliant ramps, and a new paved surface along each trail. Dakota County is participating in cost sharing since these trails are in County right-of-way. The project will be bid with the Victoria Road/ Rolling Green Neighborhood project, and construction is expected to begin in July. County Projects Delaware Avenue Resurfacing (2014) - Dakota County is planning on resurfacing Delaware Avenue from Highway 110 south to I-494. This project will not widen or alter the lane alignment of Delaware, but will provide a new asphalt driving surface and new striping. A pre -construction meeting was held on April 30th. The 2-3 week construction project is expected to begin in late July. Lexington Crosswalk at Victoria (2014) - The median and crosswalk are scheduled for installation this summer. This project will install a center median in Lexington on the north side of the Victoria intersection and provide for a crosswalk to connect the trails on the east and west of Lexington. The left turn lane from southbound Lexington to eastbound Victoria will be removed as part of this project. Construction is expected to begin in July. State Projects State Published Construction Schedule (2014) - The State Department of Transportation (MnDOT) has published their construction project list for 2014. The online list of projects with contacts, schedules, and updated information can be accessed at the State project web page at: http://www.dot.state.mn.us/roadwork/current.htmI#four. Highway 110 & Lexington Avenue Signal Replacement (20141 - Construction is underway. The existing signal will be replaced with a new LED signal with a flashing yellow arrow for the Lexington left turn lanes. Also included in the project are new ADA compliant pedestrian ramps and signals, and new crosswalk striping. The contractor has until May 20th to complete the project. Other Activities Lower Mississippi River Watershed Management Organization (LMRWMO) - Staff attended the monthly meeting of the LMRWMO on Wednesday. Discussed were the Watershed Management Plan and Joint Powers Agreement amendments required to incorporate that portion of Mendota Heights formerly part of the Gun Club Lake WMO into the LMRWMO. Action on both of these items is anticipated this summer. Minnesota 2050 - Staff participated in a meeting with Saint Paul Mayor Chris Coleman on Thursday to discuss his role as President of the National League of Cities and how he may be able to assist the MN2050 organization and mission. MN2050 is an organization made up of engineering and education professionals whose mission is to promote the importance of our infrastructure and to provide guidance for the development of Science, Technology, Engineering, and Math (STEM) education.