The Pipeline
May 9, 2014
V 7
The Parks Crew did their daily trash pickup. They started cutting the grass.
All ball fields were dragged and chalked. Trees were planted in the parks.
The soccer fields were set up and the fields striped at Kensington Park.
The Utilities Crew checked the lift station daily. They assisted the Street
Crew with road patching. The portable generator was exercised. The old
water box cover was removed and replaced with a new one on Cullen. A
sanitary sewer pipe was inspected on Sylvandale where a sink hole formed
and the city's pipe looked good. The sprayer was prepared for spraying
weeds next week at the parks and golf course.
The Streets Crew started working on sod damage complaints. Trash and
garbage was picked up from the street right-of-ways. Truck 303 was
prepared for making blacktop repairs. Pothole repairs were made on
Mendota Heights Road.
Engineering
City Projects (construction year)
Hunter Lane/Orchard Place Neighborhood Improvements (2013) - The
project is considered substantially complete and the final lift of wear course
asphalt will be placed in the spring.
Highway 13 Trail Connection (20141 - Construction is anticipated to begin in
May. A watermain will need to be lowered in conjunction with this project.
Staff is coordinating this issue between Saint Paul Regional Water Service
and the trail contractor to work the repair into the schedule.
Victoria Road Reconstruction & Rollina Green Neiahborhood Rehabilitation
(2014/2015 - The first (2014) phase of the project will reconstruct Victoria
from Lilydale to Marie Avenue and rehabilitate the Stratford/Walsh/ Rolling
Green neighborhood. The Lilydale portion of Victoria from Caren Road to
Highway 13 is included in the 2014 construction phase, and staff is drafting
a Joint Powers Agreement with Lilydale for this work. The remainder of
Victoria was put off to a future date, but it is anticipated for construction in
2015. A request to authorize advertisement of the project was approved by
City Council at their May 6th meeting.
Wentworth Avenue & Pilot Knob Road Trail Rehabilitation Projects (20141 -
The trails on Wentworth (Wachtler to Dodd) and Pilot Knob Road (Mendota
Heights Road to Highway 13) are scheduled for rehabilitation this summer.
Projects will reclaim the existing pavement and install ADA compliant ramps
and a new paved surface along each trail. Dakota County is participating in
cost sharing since these trails are in County right-of-way. The project will
be bid with the Victoria Road/Rolling Green Neighborhood project, and
construction is expected to begin in July.
County Projects
Delaware Avenue Resurfacing (20141 - Dakota County is planning on
resurfacing Delaware Avenue from Highway 110 south to I-494. This
project will not widen or alter the lane alignment of Delaware, but will
provide a new asphalt driving surface and new striping. A pre -construction
meeting was held on April 30th. The 2-3 week construction project is
expected to begin in late July.
Lexington Crosswalk at Victoria (20141 - The median and crosswalk are
scheduled for installation this summer. This project will install a center
median in Lexington on the north side of the Victoria intersection and
provide for a crosswalk to connect the trails on the east and west of
Lexington. The left turn lane from southbound Lexington to eastbound
Victoria will be removed as part of this project. Construction is expected to
begin in July.
State Projects
State Published Construction Schedule (2014 - The State Department of
Transportation (MnDOT) has published their construction project list for
2014. The online list of projects with contacts, schedules, and updated
information can be accessed at the State project web page
at: http://www.dot.state.mn.us/roadwork/current.htmI#four.
Highway 110 & Lexington Avenue Signal Replacement (2014) - Construction
is underway. The existing signal will be replaced with a new LED signal with
a flashing yellow arrow for the Lexington left turn lanes. Also included in
the project are new ADA compliant pedestrian ramps and signals, and new
crosswalk striping. The contractor has until May 20th to complete the
project.