Loading...
Pipeline 04 18 2014N E W S The Pipeline LETTER Public Works i Engineering April 18, 2014 Code Enforcement Public Works The Parks Crew did their daily trash pickup. The ball fields were dragged in all the parks and the bases were installed where needed. Repairs were made to the broom on the bobcat. They continue to sweep the trails. Tree limbs left over from last fall's trimming were chipped. The lacrosse field at Friendly Hills Park was striped. New trash barrels were picked up to replace the rusted trash barrels in the parks. The Utilities Crew checked the lift stations daily. Sump manholes were cleaned and vacuumed. The lift stations were cleaned and vacuumed. The floats were cleaned at the Veronica lift station. The Mendota Heights Road sanitary sewer line was cleaned from Lloyd's BBQ downstream to the lift station. Roots were cut and jetted on William Court and then treated with root killing chemicals. The Streets Crew started to clean up sod damage to resident's yards from snowplowing. Mailbox repairs from snowplowing also continues. Potholes were filled with cold mix. A tree limb was taken down that was hanging in an undeveloped city right-of-way. Engineering Citv Proiects (construction vear Hunter Lane/Orchard Place Neiahborhood Improvements (2013) -The project is considered substantially complete and the final lift of wear course asphalt will be placed in the spring. Highway 13 Trail Connection (2014 - Construction will not begin until the spring. A water main will need to be lowered in conjunction with this project. Staff is coordinating this issue between Saint Paul Regional Water Service and the trail contractor to work the repair in to the schedule. Victoria Road Reconstruction & Rollina Green Neiahborhood Rehabilitation (2014/2015 - Plans have been submitted to MnDOT for their review and approval. The first (2014) phase of the project will reconstruct Victoria from Lilydale to Marie Avenue and rehabilitate the Stratford/Walsh/ Rolling Green neighborhood. The Lilydale portion of Victoria from Caren Road to Highway 13 is included in the 2014 construction phase, and staff is drafting a Joint Powers Agreement with Lilydale for this work. The remainder of Victoria was put off to a future date, but it is anticipated for construction in 2015. Wentworth Avenue & Pilot Knob Road Trail Rehabilitation Projects (2014) - The trails on Wentworth (Wachtler to Dodd) and Pilot Knob Road (Mendota Heights Road to Highway 13) are scheduled for rehabilitation this summer. Projects will reclaim the existing pavement and install ADA compliant ramps and a new paved surface along each trail. Dakota County is participating in cost sharing since these trails are in County right-of-way. The project will be bid with the Victoria Road/Rolling Green Neighborhood project, and construction is expected to begin in June/July. County Projects Delaware Avenue Resurfacing (2014) - Dakota County is planning on resurfacing Delaware Avenue from Highway 110 south to I-494. This project will not widen or alter the lane alignment of Delaware, but will provide a new asphalt driving surface and new striping. The County has awarded the project to McNamara Construction, and work is anticipated to begin in late June/early July. Lexington Crosswalk at Victoria (2014) - The median and crosswalk are scheduled for installation this summer. This project will install a center median in Lexington on the north side of the Victoria intersection and provide for a crosswalk to connect the trails on the east and west of Lexington. The left turn lane from southbound Lexington to eastbound Victoria will be removed as part of this project. Construction is expected to begin in July. State Projects State Publishes Construction Schedule (2014) - The State Department of Transportation (MnDOT) has published their construction project list for 2014. The online list of projects with contacts, schedules, and updated information can be accessed at the State project web page at: httD://www.dot.state.mn.us/roadwork/current.htmI#four. Highway 110 & Lexington Avenue Signal Replacement (2014) - The existing signal will be replaced this summer with a new LED signal with flashing yellow arrow for the left turn lanes on Lexington. A pre -construction meeting is scheduled for April 24t". City staff will be in attendance. I 35E & Marie Avenue Drainage and Erosion Control Improvements (2014) - Storm Water Runoff at the northeast corner of I -35E and Marie Avenue has caused erosion that has exposed utility pipes and conduits. Since a portion of the runoff comes from the Interstate right-of-way, MnDOT has taken the lead in designing a solution. MnDOT has asked that the City administer the construction contract for the improvement. The project will be advertised for bid as soon as final plans are received from MnDOT. Highway 13 Reconstruction (2015) - The section of Highway 13 that was not rehabilitated in 2012 is scheduled for reconstruction in 2015. This section is from I -35E south and west to 2nd Street in Mendota. This section will receive a widened shoulder, curb, gutter, and storm sewer to help alleviate drainage and erosion problems in Lilydale. Highway 149 (Dodd Road) Resurfacing (20171 - Dodd Road is scheduled to be resurfaced from Highway 55 in Eagan to Annapolis Street in 2017. There are no plans to widen the State Highway, but some alterations for drainage and public safety are possible. Originally scheduled for 2015, the project was delayed to coincide with the Highway 110 rehabilitation project. Dodd Road will receive another sealcoat (chip seal) in 2014. Highway 110 Resurfacing (2017) - Preliminary project scoping has begun. This project will not reconstruct or alter the alignment of the state highway, but modifications to access points, traffic signals, shoulders, drainage, and pedestrian facilities are likely. The project is scheduled to take place between the I -35E bridge and the I-494/Highway 52 interchange.