Pipeline 04 04 2014NEWS
LETTER
Public Works
Engineering
Code Enforcement
Public Works
the Pipeline
April 4, 2014
The Parks Crews did their daily trash pickup. The aerator was shut down for
the year at Rogers Lake. Truck 501 was picked up from the auto body
shop. A new lift gate was installed on truck 501, which replaced the old
rusted out gate. The water meters were installed at Kensington South and
Mendakota Park's out buildings. They attended the CPR training.
The Utilities Crew checked the lift stations daily. The main lift station had a
high water alarm on Tuesday at 12:00 pm. The alarm was caused by
grease and wipes stuck to the transducer and wet well walls. The grease
was scraped off and the transducer was cleaned. A sanitary sewer
inspection was done for a repair on Woodridge Drive. They attended a
wellness committee meeting. A storm pipe that was blocked by ice was
jetted in Sunfish Lake.
The Streets Crew did mailbox repairs. The culvert from Huber Drive to
Highway 110 and Dodd Road was cleaned because it was plugged with
trash. Pothole patching was done. Trash on Hunter Lane was picked up.
The shop was cleaned. They attended CPR training.
Engineering
City Projects (construction yearl
Hunter Lane/Orchard Place Neighborhood Improvements (20131 -The
project is considered substantially complete and the final lift of wear course
asphalt will be placed in the spring.
Highway 13 Trail Connection (20141 - Construction will not begin until the
spring. A utility conflict with Saint Paul Regional Water Service needs to be
resolved prior to construction. Staff is meeting with Saint Paul Regional
Water Service and the contractor on Monday to work out this issue.
Victoria Road Reconstruction & Rolling Green Neighborhood Rehabilitation
(2014/2015 - A notice letter was sent out earlier this week informing
affected property owners of a neighborhood open house scheduled for
Wednesday, April 9t" at 6:30. The open house is at City Hall. At the open
house, people will be able to review what is proposed to take place adjacent
to their property and identify any specific issues the project may be able to
address. The first (2014) phase of the project will reconstruct Victoria from
Lilydale to Marie Avenue and rehabilitate the Stratford/Walsh/ Rolling Green
neighborhood. The Lilydale portion of Victoria from Caren Road to Highway
13 is included in the 2014 construction phase. The remainder of Victoria was
put off to a future date, but it is anticipated for construction in 2015.
Wentworth Avenue & Pilot Knob Road Trail Rehabilitation Projects (20141 -
The trails on Wentworth (Wachtler to Dodd) and Pilot Knob Road (Mendota
Heights Road to Highway 13) are scheduled for rehabilitation this summer.
Projects will reclaim the existing pavement and install ADA compliant ramps
and a new paved surface along each trail. Dakota County is participating in
cost sharing since these trails are in County right-of-way. Construction is
anticipated to begin in June/July.
County Projects
Delaware Avenue Resurfacing (2014 - Dakota County is planning on
resurfacing Delaware Avenue from Highway 110 south to I-494. This
project will not widen or alter the lane alignment of Delaware, but will
provide a new asphalt driving surface and new striping. Construction is
anticipated to begin in late June.
Lexington Crosswalk at Victoria (20141 - The median and crosswalk are
scheduled for installation this summer. This project will install a center
median in Lexington on the north side of the Victoria intersection and
provide for a crosswalk to connect the trails on the east and west of
Lexington. The left turn lane from southbound Lexington to eastbound
Victoria will be removed as part of this project. A JPA with Dakota County
for the project was approved by City Council at their April 1st meeting.
State Proiects
State Publishes Construction Schedule (20141 - The State Department of
Transportation (MnDOT) has published their construction project list for
2014. The online list of projects with contacts, schedules, and updated
information can be accessed at the State project web page
at: http://www.dot.state.mn.us/roadwork/current.htmI#four.
Highway 110 & Lexington Avenue Signal Replacement (2014) - The existing
signal will be replaced this summer with a new LED signal with flashing
yellow arrow for the left turn lanes on Lexington.
I 35E & Marie Avenue Drainage and Erosion Control Improvements (20141 -
Storm Water Runoff at the northeast corner of I -35E and Marie Avenue has
caused erosion that has exposed utility pipes and conduits. Since a portion
of the runoff comes from the Interstate right-of-way, MnDOT has taken the
lead in designing a solution. MnDOT has asked that the City administer the
construction contract for the improvement. A Cooperative Construction
Agreement was approved by City Council at their April 1st meeting.
Highway 13 Reconstruction (2015) - The section of Highway 13 that was
not rehabilitated in 2012 is scheduled for reconstruction in 2015. This
section is from I -35E south and west to 2nd Street in Mendota. This section
will receive a widened shoulder, curb, gutter, and storm sewer to help
alleviate drainage and erosion problems in Lilydale.
Highway 149 (Dodd Road) Resurfacing (20171 - Dodd Road is scheduled to
be resurfaced from Highway 55 in Eagan to Annapolis Street in 2017. There
are no plans to widen the State Highway, but some alterations for drainage
and public safety are possible. Originally scheduled for 2015, the project
was delayed to coincide with the Highway 110 rehabilitation project. Dodd
Road will receive another sealcoat (chip seal) in 2014.
Highway 110 Resurfacing (2017) - Preliminary project scoping has begun.
This project will not reconstruct or alter the alignment of the state highway,
but modifications to access points, traffic signals, shoulders, drainage, and
pedestrian facilities are likely. The project is scheduled to take place
between the I -35E bridge and the I-494/Highway 52 interchange.
Other Activities
Saint Paul Regional Water Service (SPRWS) Annual Meeting - Staff attended
the annual meeting of SPRWS for Suburban customers. SPRWS explained
their new rate for 2014 (an increase of 1.7%), and some organizational
restructuring they are undertaking to increase efficiency. Frozen service
lines have been a problem this winter because of the length and severity of
cold we experienced since November. Some homeowners are being asked
to run water constantly to avoid service line freezing. SPRWS will deduct
this amount from water bills, and the City will use the reduced numbers to
set annual sewer rates. For more questions, please call the City Engineering
Department or SPRWS at 651-266-6350.