Loading...
Pipeline 04 04 2014NEWS LETTER Public Works Engineering Code Enforcement Public Works the Pipeline April 4, 2014 The Parks Crews did their daily trash pickup. The aerator was shut down for the year at Rogers Lake. Truck 501 was picked up from the auto body shop. A new lift gate was installed on truck 501, which replaced the old rusted out gate. The water meters were installed at Kensington South and Mendakota Park's out buildings. They attended the CPR training. The Utilities Crew checked the lift stations daily. The main lift station had a high water alarm on Tuesday at 12:00 pm. The alarm was caused by grease and wipes stuck to the transducer and wet well walls. The grease was scraped off and the transducer was cleaned. A sanitary sewer inspection was done for a repair on Woodridge Drive. They attended a wellness committee meeting. A storm pipe that was blocked by ice was jetted in Sunfish Lake. The Streets Crew did mailbox repairs. The culvert from Huber Drive to Highway 110 and Dodd Road was cleaned because it was plugged with trash. Pothole patching was done. Trash on Hunter Lane was picked up. The shop was cleaned. They attended CPR training. Engineering City Projects (construction yearl Hunter Lane/Orchard Place Neighborhood Improvements (20131 -The project is considered substantially complete and the final lift of wear course asphalt will be placed in the spring. Highway 13 Trail Connection (20141 - Construction will not begin until the spring. A utility conflict with Saint Paul Regional Water Service needs to be resolved prior to construction. Staff is meeting with Saint Paul Regional Water Service and the contractor on Monday to work out this issue. Victoria Road Reconstruction & Rolling Green Neighborhood Rehabilitation (2014/2015 - A notice letter was sent out earlier this week informing affected property owners of a neighborhood open house scheduled for Wednesday, April 9t" at 6:30. The open house is at City Hall. At the open house, people will be able to review what is proposed to take place adjacent to their property and identify any specific issues the project may be able to address. The first (2014) phase of the project will reconstruct Victoria from Lilydale to Marie Avenue and rehabilitate the Stratford/Walsh/ Rolling Green neighborhood. The Lilydale portion of Victoria from Caren Road to Highway 13 is included in the 2014 construction phase. The remainder of Victoria was put off to a future date, but it is anticipated for construction in 2015. Wentworth Avenue & Pilot Knob Road Trail Rehabilitation Projects (20141 - The trails on Wentworth (Wachtler to Dodd) and Pilot Knob Road (Mendota Heights Road to Highway 13) are scheduled for rehabilitation this summer. Projects will reclaim the existing pavement and install ADA compliant ramps and a new paved surface along each trail. Dakota County is participating in cost sharing since these trails are in County right-of-way. Construction is anticipated to begin in June/July. County Projects Delaware Avenue Resurfacing (2014 - Dakota County is planning on resurfacing Delaware Avenue from Highway 110 south to I-494. This project will not widen or alter the lane alignment of Delaware, but will provide a new asphalt driving surface and new striping. Construction is anticipated to begin in late June. Lexington Crosswalk at Victoria (20141 - The median and crosswalk are scheduled for installation this summer. This project will install a center median in Lexington on the north side of the Victoria intersection and provide for a crosswalk to connect the trails on the east and west of Lexington. The left turn lane from southbound Lexington to eastbound Victoria will be removed as part of this project. A JPA with Dakota County for the project was approved by City Council at their April 1st meeting. State Proiects State Publishes Construction Schedule (20141 - The State Department of Transportation (MnDOT) has published their construction project list for 2014. The online list of projects with contacts, schedules, and updated information can be accessed at the State project web page at: http://www.dot.state.mn.us/roadwork/current.htmI#four. Highway 110 & Lexington Avenue Signal Replacement (2014) - The existing signal will be replaced this summer with a new LED signal with flashing yellow arrow for the left turn lanes on Lexington. I 35E & Marie Avenue Drainage and Erosion Control Improvements (20141 - Storm Water Runoff at the northeast corner of I -35E and Marie Avenue has caused erosion that has exposed utility pipes and conduits. Since a portion of the runoff comes from the Interstate right-of-way, MnDOT has taken the lead in designing a solution. MnDOT has asked that the City administer the construction contract for the improvement. A Cooperative Construction Agreement was approved by City Council at their April 1st meeting. Highway 13 Reconstruction (2015) - The section of Highway 13 that was not rehabilitated in 2012 is scheduled for reconstruction in 2015. This section is from I -35E south and west to 2nd Street in Mendota. This section will receive a widened shoulder, curb, gutter, and storm sewer to help alleviate drainage and erosion problems in Lilydale. Highway 149 (Dodd Road) Resurfacing (20171 - Dodd Road is scheduled to be resurfaced from Highway 55 in Eagan to Annapolis Street in 2017. There are no plans to widen the State Highway, but some alterations for drainage and public safety are possible. Originally scheduled for 2015, the project was delayed to coincide with the Highway 110 rehabilitation project. Dodd Road will receive another sealcoat (chip seal) in 2014. Highway 110 Resurfacing (2017) - Preliminary project scoping has begun. This project will not reconstruct or alter the alignment of the state highway, but modifications to access points, traffic signals, shoulders, drainage, and pedestrian facilities are likely. The project is scheduled to take place between the I -35E bridge and the I-494/Highway 52 interchange. Other Activities Saint Paul Regional Water Service (SPRWS) Annual Meeting - Staff attended the annual meeting of SPRWS for Suburban customers. SPRWS explained their new rate for 2014 (an increase of 1.7%), and some organizational restructuring they are undertaking to increase efficiency. Frozen service lines have been a problem this winter because of the length and severity of cold we experienced since November. Some homeowners are being asked to run water constantly to avoid service line freezing. SPRWS will deduct this amount from water bills, and the City will use the reduced numbers to set annual sewer rates. For more questions, please call the City Engineering Department or SPRWS at 651-266-6350.