Loading...
Pipeline 03 21 2014NEWS LETTER The Pipeline Public Works 4 Engineering March 21, 2014 Code Enforcement Public Works The Parks Crew did their daily trash pickup. They cleaned all trails and parking lots of snow. The zero turn mowers were cleaned up to get ready for service. The tandem trailer was cleaned up, serviced, the tires replaced and the brakes adjusted. The Groundsmaster mower from the Par 3 storage garage was brought to the shop and prepared for service. The Utilities Crew checked the lift stations daily. The HVAC filters at the main lift station were changed and the fan belts inspected. The shop floor drain was cleaned. Manholes along the trunk line were marked. Roots were cut in the lines on Walsh Lane, Kay Avenue, and Victoria Road. Storm sewers that had ice buildup were jetted on Wesley Lane and in Town Center. Trucks 309, 409 and 500 were waxed. The Streets Crew cleaned snow and ice from catch basins and fire hydrants. The streets were plowed and salted on Monday and Wednesday. Pot holes were filled. Bridge decks were cleared of snow. Engineering Citv Proiects (construction vear Hunter Lane/Orchard Place Neighborhood Improvements (20131 -The project is considered substantially complete and the final lift of wear course asphalt will be placed in the spring. Highway 13 Trail Connection (2014)-- Construction will not begin until the spring. A utility conflict with Saint Paul Regional Water Service needs to be resolved prior to construction. Staff will hold a coordination meeting with Saint Paul Regional Water Service and the contractor in the coming weeks. Victoria Road Reconstruction & Rolling Green Neighborhood Rehabilitation (2014/2015 - The consultant is working on the design plans and specifications for the first phase of construction, and the City anticipates bidding the project in the April/May timeframe. The first phase will reconstruct Victoria from Lilydale to Marie Avenue and rehabilitate the Stratford/Walsh/ Rolling Green neighborhood. The remainder of Victoria was put off to a future date, but it is anticipated for construction in 2015. The Lilydale portion of Victoria from Caren Road to Highway 13 is included. Staff walked the project area to verify the consultant's plan set as compiled to date. A neighborhood meeting will be held in early April to go over specific issues and concerns with individual property owners. A notice letter will go out 1-2 weeks ahead of the meeting. Wentworth Avenue & Pilot Knob Road Trail Rehabilitation Projects (20141 - The trails on Wentworth (Wachtler to Dodd) and Pilot Knob Road (Mendota Heights Road to Highway 13) are scheduled for rehabilitation in the coming year. Projects will reclaim the existing pavement and install ADA compliant ramps along each trail. Construction is anticipated in June/July. Council approved a Joint Powers Agreement (JPA) with the County for the projects at the March 18th City Council meeting. County Projects Delaware Avenue Resurfacing (2014 - Dakota County is planning on resurfacing Delaware Avenue from Highway 110 south to I-494. This project will not widen or otherwise alter the lane alignment of Delaware, but will provide a new asphalt driving surface and new striping. Construction is anticipated to begin in late June. Lexington Crosswalk at Victoria (20141 - The median and crosswalk are scheduled for installation this summer. This project will install a center median in Lexington on the north side of the Victoria intersection and provide for a crosswalk to connect the trails on the east and west of Lexington. The left turn lane from southbound Lexington to eastbound Victoria will be removed as part of this project. A JPA with Dakota County for the project will be presented to City Council at their April 1St meeting. State Proiects Highway 110 & Lexington Avenue Signal Replacement (2014) - The existing signal will be replaced this summer with a new LED signal with flashing yellow arrows for the left turn lanes on Lexington. Highway 13 Reconstruction (2015) - The section of Highway 13 that was not rehabilitated in 2012 is scheduled for reconstruction in 2015. This section is from I -35E south and west to 2nd Street in Mendota. This section will receive a widened shoulder, curb, gutter, and storm sewer to help alleviate drainage and erosion problems in Lilydale. Highway 149 (Dodd Road) Resurfacing (20171 - Dodd Road is scheduled to be resurfaced from Highway 55 in Eagan to Annapolis Street in 2017. At this time, there are no plans to widen the State Highway, but some alterations for drainage and public safety are possible. Originally scheduled for 2015, the project was delayed to coincide with the Highway 110 rehabilitation project. Due to the project delay, Dodd Road will receive another sealcoat (chip seal) in 2014. Highway 110 Resurfacing (2017) - Preliminary project scoping has begun. This project will not reconstruct or alter the alignment of the state highway, but modifications to access points, traffic signals, shoulders, drainage, and pedestrian facilities are likely.