Pipeline 03 14 2014NEWS LETTER Public Works Engineering Code Enforcement Public Works The f it" Pipeline March 14, 2014 The Parks Crew did their daily trash pickup. The warming houses were cleaned out and the gas shut off. Broken shovels were repaired as needed. The hockey goals were taken off the rinks and put in storage. The flooding hoses and hydrant fittings were also removed and stored. Truck 503 was serviced. They assisted the Fire Department in returning hoses to the fire hall after the house fire on the Highway 110 Frontage Road. The Utilities Crew checked the lift stations daily. Both generators were exercised. After a resident's concern, the storm sewer was looked at on Fieldstone Drive and it was flowing fine. There was a possible sewer backup on Highway 13 and a problem was found in the homeowner's service. Root killer was added to the Marie Avenue sanitary sewer line. The Streets Crew opened catch basins throughout the city. Blacktop material was picked up and potholes were filled. A crime watch sign was installed in the Evergreen Knoll neighborhood. They helped a resident with removing snow and mud from the front yard that was left there from cleaning a catch basin. Engineering City Projects (construction year) Hunter Lane/Orchard Place Neighborhood Improvements (2013 -The project is considered substantially complete and the final lift of wear course asphalt will be placed in the spring. Highway 13 Trail Connection (2014)_- Construction will not begin until the spring. A utility conflict with Saint Paul Regional Water Service needs to be resolved prior to construction. Victoria Road Reconstruction & Rolling Green Neighborhood Rehabilitation (2014/20151 - The consultant is working on the design plans and specifications for the first phase of construction, and the City anticipates bidding the project in the April/May timeframe. The first phase will reconstruct Victoria from Lilydale to Marie Avenue and rehabilitate the Stratford/Walsh/ Rolling Green neighborhood. The remainder of Victoria was put off to a future date, but it is anticipated for construction in 2015. The Lilydale portion of Victoria from Caren Road to Highway 13 will be included. Wentworth Avenue & Pilot Knob Road Trail Rehabilitation Projects (20141 - The trails on Wentworth (Wachtler to Dodd) and Pilot Knob Road (Mendota Heights Road to Highway 13) are scheduled for rehabilitation in the coming year. Projects will reclaim the existing pavement and install ADA compliant ramps along each trail. Construction is anticipated in June/July. A Joint Powers Agreement with Dakota County will be on the March 18th City Council Agenda. County Projects Delaware Avenue Resurfacing (20141 - Dakota County is planning on resurfacing Delaware Avenue from Highway 110 south to I-494. This project will not widen or otherwise alter the lane alignment of Delaware, but will provide a new asphalt driving surface and new striping. Construction is anticipated to begin in late June. Lexington Crosswalk at Victoria (20141 - The median and crosswalk are scheduled for installation this summer. This project will install a center median in Lexington on the north side of the Victoria intersection and provide for a crosswalk to connect the trails on the east and west of Lexington. The left turn lane from southbound Lexington to eastbound Victoria will be removed as part of this project. State Proiects Highway 110 & Lexington Avenue Signal Replacement (2014) - The existing signal will be replaced this summer with a new LED signal with flashing yellow arrow for the left turn lanes on Lexington. Highway 13 Reconstruction (2015) - The section of Highway 13 that was not rehabilitated in 2012 is scheduled for reconstruction in 2015. This section is from I -35E south and west to 2nd Street in Mendota. This section will receive a widened shoulder, curb, gutter, and storm sewer to help alleviate drainage and erosion problems in Lilydale. Highway 149 (Dodd Road) Resurfacing (20171 - Dodd Road is scheduled to be resurfaced from Highway 55 in Eagan to Annapolis Street in 2017. At this time, there are no plans to widen the State Highway, but some alterations for drainage and public safety are possible. Originally scheduled for 2015, the project was delayed to coincide with the Highway 110 rehabilitation project. Due to the project delay, Dodd Road will receive another sealcoat (chip seal) in 2014. Highway 110 Resurfacing (2017) - Preliminary project scoping has begun. This project will not reconstruct or alter the alignment of the state highway, but modifications to access points, traffic signals, shoulders, drainage, and pedestrian facilities are likely. Other Activities Lower Mississippi River Watershed Management Organization (LMRWMO) - Staff attended the monthly meeting of the LMRWMO board. The LMRWMO is making progress in updating the Watershed Management Plan and developing a new Joint Powers Agreement for the member Cities to incorporate the portion of Mendota Heights that used to be part of the now dissolved Gun Club Lake Watershed Management Organization. The LMRWMO is also working on an erosion control repair in Cherokee Park (City of Saint Paul) that involves storm water drainage from Mendota Heights and West Saint Paul. MN2050 - Staff attended a meeting of the MN2050 organization on Friday. The organization is working with Twin Cities Public Television on producing a series of documentaries on the state of Minnesota's infrastructure. A 2 minute trailer for the upcoming Road and Bridge documentary, as well as an abridged version of the water and wastewater documentary can be seen on the MN2050 website at www.mn205O.ora.