Loading...
Pipeline 02 28 2014NEWS LETTER " Public Works Engineering S Code Enforcement Public Works The Pipeline,,,,� February 28, 2014 The Parks Crew did their daily trash pickup and checking of warming houses. They continue to flood the ice rinks. They are also clearing pedways throughout the city. They plowed the cul-de-sacs, parking lots, and ice rinks after the 9.9 inches of snow that fell. Equipment maintenance repair work was done to plow truck 501. The Utilities Crew checked out the sanitary sewer lines on Dodd Road and Douglas Road. The homeowner had called because of problems and it was in their service. The lift stations were checked, shoveled and plowed. There was a meeting with Engineering about this year's sanitary sewer projects. The floor drain in the Police Department was unplugged and the drain cap replaced. The Streets Crew plowed and salted all city streets after the 9.9 inches of snow. They helped clear the pedways at Mendakota and Mendota Heights Road. They cleaned off the bridge decks. Snow was pushed back on the cul-de-sacs with the loader and backhoe. Mail boxes are being fixed throughout the city. Engineering City Projects (construction year) Hunter Lane/Orchard Place Neighborhood Improvements (20131 -The project is considered substantially complete and the final lift of wear course asphalt will be placed in the spring. Highway 13 Trail Connection (2014)_- Construction will not begin until the spring. A utility conflict with Saint Paul Regional Water Service needs to be resolved prior to construction. Victoria Road Reconstruction & Rolling Green Neighborhood Rehabilitation (2014/2015 - The consultant is working on the design plans and specifications for the first phase of construction, and the City anticipates bidding the project in the April/May timeframe. The first phase will reconstruct Victoria from Lilydale to Marie Avenue and rehabilitate the Stratford/Walsh/ Rolling Green neighborhood. The remainder of Victoria was put off to a future date, but it is anticipated for construction in 2015. The City of Lilydale has asked that the portion of Victoria from Caren Road to Highway 13 be included at Lilydale's expense. Wentworth Avenue & Pilot Knob Road Trail Rehabilitation Projects (20141 - The trails on Wentworth (Wachtler to Dodd) and Pilot Knob Road (Mendota Heights Road to Highway 13) are scheduled for rehabilitation in the coming year. Projects will reclaim the existing pavement and install ADA compliant ramps along each trail. Construction is anticipated in June/July. County Projects Delaware Avenue Resurfacing (20141 - Dakota County is planning on resurfacing Delaware Avenue from Highway 110 south to I-494. This project will not widen or otherwise alter the lane alignment of Delaware, but will provide a new asphalt driving surface and new striping. Construction is anticipated to begin in late June. Lexington Crosswalk at Victoria (20141 - The median and crosswalk are scheduled for installation this summer. Construction will likely take place in conjunction with the Delaware Avenue Resurfacing project. This project will install a center median in Lexington on the north side of the Victoria intersection and provide for a crosswalk to connect the trails on the east and west of Lexington. The left turn lane from southbound Lexington to eastbound Victoria will be removed as part of this project. State Proiects Highway 110 & Lexington Avenue Signal Replacement (2014) - The existing signal will be replaced this summer with a new LED signal with flashing yellow arrow for the left turn lanes on Lexington. Highway 13 Reconstruction (2015) - The section of Highway 13 that was not rehabilitated in 2012 is scheduled for reconstruction in 2015. This section is from I -35E south and west to 2nd Street in Mendota. This section will receive a widened shoulder, curb, gutter, and storm sewer to help alleviate drainage and erosion problems in Lilydale. Highway 149 (Dodd Road) Resurfacing (20171 - Dodd Road is scheduled to be resurfaced from Highway 55 in Eagan to Annapolis Street in 2017. At this time, there are no plans to widen the State Highway, but some alterations for drainage and public safety are possible. Originally scheduled for 2015, the project was delayed to coincide with the Highway 110 rehabilitation project. Due to the project delay, Dodd Road will receive another sealcoat (chip seal) in 2014. Highway 110 Resurfacing (2017) - Preliminary project scoping has begun. This project will not reconstruct or alter the alignment of the state highway, but modifications to access points, traffic signals, shoulders, drainage, and pedestrian facilities are likely. Other Activities Future Cities Competition - Staff assisted at Friendly Hills Middle School for the all school presentation competition. These presentations were from teams not selected by school staff to attend the State competition last month. Teams of 6th, 7th, and 8th grade students presented their cities of the future with a focus on innovative transportation solutions. Students and faculty from Friendly Hills will be attending the March 18th City Council meeting to talk about the Future Cities program.