Pipeline 02 28 2014NEWS
LETTER "
Public Works
Engineering S
Code Enforcement
Public Works
The Pipeline,,,,�
February 28, 2014
The Parks Crew did their daily trash pickup and checking of warming
houses. They continue to flood the ice rinks. They are also clearing
pedways throughout the city. They plowed the cul-de-sacs, parking lots,
and ice rinks after the 9.9 inches of snow that fell. Equipment maintenance
repair work was done to plow truck 501.
The Utilities Crew checked out the sanitary sewer lines on Dodd Road and
Douglas Road. The homeowner had called because of problems and it was
in their service. The lift stations were checked, shoveled and plowed. There
was a meeting with Engineering about this year's sanitary sewer projects.
The floor drain in the Police Department was unplugged and the drain cap
replaced.
The Streets Crew plowed and salted all city streets after the 9.9 inches of
snow. They helped clear the pedways at Mendakota and Mendota Heights
Road. They cleaned off the bridge decks. Snow was pushed back on the
cul-de-sacs with the loader and backhoe. Mail boxes are being fixed
throughout the city.
Engineering
City Projects (construction year)
Hunter Lane/Orchard Place Neighborhood Improvements (20131 -The
project is considered substantially complete and the final lift of wear course
asphalt will be placed in the spring.
Highway 13 Trail Connection (2014)_- Construction will not begin until the
spring. A utility conflict with Saint Paul Regional Water Service needs to be
resolved prior to construction.
Victoria Road Reconstruction & Rolling Green Neighborhood Rehabilitation
(2014/2015 - The consultant is working on the design plans and
specifications for the first phase of construction, and the City anticipates
bidding the project in the April/May timeframe. The first phase will
reconstruct Victoria from Lilydale to Marie Avenue and rehabilitate the
Stratford/Walsh/ Rolling Green neighborhood. The remainder of Victoria was
put off to a future date, but it is anticipated for construction in 2015. The
City of Lilydale has asked that the portion of Victoria from Caren Road to
Highway 13 be included at Lilydale's expense.
Wentworth Avenue & Pilot Knob Road Trail Rehabilitation Projects (20141 -
The trails on Wentworth (Wachtler to Dodd) and Pilot Knob Road (Mendota
Heights Road to Highway 13) are scheduled for rehabilitation in the coming
year. Projects will reclaim the existing pavement and install ADA compliant
ramps along each trail. Construction is anticipated in June/July.
County Projects
Delaware Avenue Resurfacing (20141 - Dakota County is planning on
resurfacing Delaware Avenue from Highway 110 south to I-494. This
project will not widen or otherwise alter the lane alignment of Delaware, but
will provide a new asphalt driving surface and new striping. Construction is
anticipated to begin in late June.
Lexington Crosswalk at Victoria (20141 - The median and crosswalk are
scheduled for installation this summer. Construction will likely take place in
conjunction with the Delaware Avenue Resurfacing project. This project will
install a center median in Lexington on the north side of the Victoria
intersection and provide for a crosswalk to connect the trails on the east and
west of Lexington. The left turn lane from southbound Lexington to
eastbound Victoria will be removed as part of this project.
State Proiects
Highway 110 & Lexington Avenue Signal Replacement (2014) - The existing
signal will be replaced this summer with a new LED signal with flashing
yellow arrow for the left turn lanes on Lexington.
Highway 13 Reconstruction (2015) - The section of Highway 13 that was
not rehabilitated in 2012 is scheduled for reconstruction in 2015. This
section is from I -35E south and west to 2nd Street in Mendota. This section
will receive a widened shoulder, curb, gutter, and storm sewer to help
alleviate drainage and erosion problems in Lilydale.
Highway 149 (Dodd Road) Resurfacing (20171 - Dodd Road is scheduled to
be resurfaced from Highway 55 in Eagan to Annapolis Street in 2017. At
this time, there are no plans to widen the State Highway, but some
alterations for drainage and public safety are possible. Originally scheduled
for 2015, the project was delayed to coincide with the Highway 110
rehabilitation project. Due to the project delay, Dodd Road will receive
another sealcoat (chip seal) in 2014.
Highway 110 Resurfacing (2017) - Preliminary project scoping has begun.
This project will not reconstruct or alter the alignment of the state highway,
but modifications to access points, traffic signals, shoulders, drainage, and
pedestrian facilities are likely.
Other Activities
Future Cities Competition - Staff assisted at Friendly Hills Middle School for
the all school presentation competition. These presentations were from
teams not selected by school staff to attend the State competition last
month. Teams of 6th, 7th, and 8th grade students presented their cities of
the future with a focus on innovative transportation solutions. Students and
faculty from Friendly Hills will be attending the March 18th City Council
meeting to talk about the Future Cities program.