Loading...
Pipeline 01 31 2014NEWS LETTER Public Works Engineering Code Enforcement Public Works The Pipeline I Ow January 31, 2014 The Parks Crew did their daily trash pickup and checking of the warming houses. The light fixture was repaired at the warming house in Marie Park. The lamps were also replaced. They continue widening the trails throughout the city with the snow blower on the bobcat. They plowed the cul-de-sacs, parking lots, ice rinks and trails. The plow ram was replaced on truck 503. They attended the Highway Patrol seminar at Scharber and Sons the topics covered were the new driving and trailer laws. The Utilities Crew plowed the middle area of the city on Friday night into Saturday. The cul-de-sacs were plowed on Sunday and Thursday, and helped plow the south end of the city on Monday. The lift stations were checked, plowed and shoveled. A new lock cover was installed at the St. Thomas lift station. They attended the annual collection system operations conference. The topics discussed were sewer cleaning, lift station maintenance, sewer relining, cyber security for lift stations, inflow and infiltration in sewers, and electrical safety. The Streets Crew plowed the 3.5 -inch snowfall on Sunday. They came in early on Wednesday to plow blowing and drifting snow. They plowed snow again on Thursday during the 6 -inch snow storm. They also worked on pushing back the snow banks and clearing snow around fire hydrants. They fixed the parks plow truck. Sand and salt was mixed. Engineering City Projects (construction year) Hunter Lane/Orchard Place Neighborhood Improvements (20131 -The project is considered substantially complete and the final lift of wear course asphalt will be placed in the spring. Crown Point & Overlook Neighborhood Rehabilitations (2013) - The contractor will need to finish the final punch -list items in the spring. Highway 13 Trail Connection (2014) --Construction will not begin until the spring. A utility conflict with Saint Paul Regional Water Service needs to be resolved prior to construction. Victoria Road Reconstruction & Rolling Green Neighborhood Rehabilitation (2014/2015 - The consultant is working on the design plans and specifications, and the City anticipates bidding the project in the April/May timeframe. The project will be constructed in phases. The first phase, scheduled for 2014, will reconstruct Victoria from Lilydale to Marie Avenue and rehabilitate the Stratford/Walsh/ Rolling Green neighborhood. The remainder of Victoria was put off to a future date, but it is anticipated for construction in 2015. The City of Lilydale has asked that the portion of Victoria from Caren Road to Highway 13 be included at Lilydale's expense. Wentworth Avenue & Pilot Knob Road Trail Rehabilitation Projects (20141 - The trails on Wentworth (Wachtler to Dodd) and Pilot Knob Road (Mendota Heights Road to Highway 13) are scheduled for rehabilitation in the coming year. Projects will reclaim the existing pavement and install ADA compliant ramps along each trail. Construction is anticipated in June/July. County Projects Delaware Avenue Resurfacing (20141 - Dakota County is planning on resurfacing Delaware Avenue from Highway 110 south to I-494. This project will not widen or otherwise alter the lane alignment of Delaware, but will provide a new asphalt driving surface and new striping. Construction is anticipated to begin in late June. Lexington Crosswalk at Victoria (20141 - The median and crosswalk are scheduled for installation this summer. Construction will likely take place in conjunction with the Delaware Avenue Resurfacing project. This project will install a center median in Lexington on the north side of the Victoria intersection and provide for a crosswalk to connect the trails on the east and west of Lexington. The left turn lane from southbound Lexington to eastbound Victoria will be removed as part of this project. State Projects Highway 110 & Lexington Avenue Signal Replacement (2014) - The existing signal will be replaced this summer with a new LED signal with flashing yellow arrow for the left turn lanes on Lexington. Highway 13 Reconstruction (2015) - The section of Highway 13 that was not rehabilitated in 2012 is scheduled for reconstruction in 2015. This section is from I -35E south and west to 2nd Street in Mendota. This section will receive a widened shoulder, curb, gutter, and storm sewer to help alleviate drainage and erosion problems in Lilydale. Highway 149 (Dodd Road) Resurfacing (20171 - Dodd Road is scheduled to be resurfaced from Highway 55 in Eagan to Annapolis Street in 2015. At this time, there are no plans to widen the State Highway, but some alterations for drainage and public safety are possible. The project may be delayed until 2017 to be constructed in conjunction with the Highway 110 resurfacing project. Due to the project delay, Dodd Road will receive another sealcoat (chip seal) in 2014. Highway 110 Resurfacing (2017) - Preliminary project scoping has begun. This project will not reconstruct or alter the alignment of the state highway, but modifications to access points, traffic signals, shoulders, drainage, and pedestrian facilities are likely. Other Activities City Engineer Association of Minnesota (CEAM) Annual Conference - Staff attended the conference held at the Earle Brown Heritage Center in Brooklyn Center this week. Topics discussed were pond maintenance programs, pavement management, sign reflectivity requirements, and updates from State Agencies.