Pipeline 01 17 2014N E W S
LETTER
Public Works
Engineering
Code Enforcement
Public Works
The Pipeline
D January 17, 2014
A
The Parks Crew plowed the cul-de-sacs, parking lots, ice rinks and trails.
They attended right to know safety training. The groomer was picked up
from the Par 3 and returned to St. Thomas Academy.
The Utilities Crew checked the lift stations daily. The lift stations were also
shoveled and plowed when needed. Assisted with plowing the cul-de-sacs
in the middle and north areas of the city and helped clean the shop floor
drains. Sanitary Sewers were inspected at First Avenue and Highway 13.
The Streets Crew helped clean the big floor drain at the Public Works
Garage. Plow trucks were washed. Sanders and wings were greased. Curb
runners were replaced on the wings. They had an early start on Tuesday
because of the 4 inches of snow and plowed all city streets. On Wednesday,
they went back through the neighborhoods to clean up the snow. They
came in at 7:00 p.m. on Wednesday and salted all streets because of the
clipper that came through. Some mailbox repairs were done.
Please see attached complimentary note from a resident about the City's
snow removal efforts.
Engineering
City Projects (construction year)
Hunter Lane/Orchard Place Neighborhood Improvements (20131 -The
project is considered substantially complete and the final lift of wear course
asphalt will be placed in the spring.
Crown Point & Overlook Neighborhood Rehabilitations (2013) - The
contractor will need to finish the final punch -list items in the spring.
Highway 13 Trail Connection (2014) --Construction will not begin until the
spring. A utility conflict with Saint Paul Regional Water Service needs to be
resolved prior to construction.
Victoria Road Reconstruction & Rolling Green Neighborhood Rehabilitation
(2014/2015 - An RFP for consultant services to design the project has been
issued. Proposals were received on Wednesday. Staff has selected Bolton &
Menk as the preferred consultant, and the award of the design contract will
be on the January 21st City Council meeting agenda. The project will be
constructed in phases. The first phase, scheduled for 2014, will reconstruct
Victoria from Lilydale to Marie Avenue and rehabilitate the Stratford/Walsh/
Rolling Green neighborhood. The remainder of Victoria was put off to a
future date, but it is anticipated for construction in 2015. The City of Lilydale
has asked that the portion of Victoria from Caren Road to Highway 13 be
included at Lilydale's expense.
County Projects
Delaware Avenue Resurfacing (20141 - Dakota County is planning on
resurfacing Delaware Avenue form Highway 110 south to I-494. This
project will not widen or otherwise alter the lane alignment of Delaware, but
will provide a new asphalt driving surface and new striping. Construction is
anticipated to begin in late June.
State Proiects
Highway 13 Reconstruction (2015) - The section of Highway 13 that was
not rehabilitated in 2012 is scheduled for reconstruction in 2015. This
section is from I -35E south and west to 2nd Street in Mendota. This section
will receive a widened shoulder, curb, gutter, and storm sewer to help
alleviate drainage and erosion problems in Lilydale.
Highway 149 (Dodd Road) Resurfacing (2015 or 2017) - Dodd Road is
scheduled to be resurfaced from Highway 55 in Eagan to Annapolis
Street in 2015. At this time, there are no plans to widen the State Highway,
but some alterations for drainage and public safety are possible. The project
may be delayed until 2017 to be constructed in conjunction with the
Highway 110 resurfacing project.
Highway 110 Resurfacing (2017) - Preliminary project scoping has begun.
This project will not reconstruct or alter the alignment of the state highway,
but modifications to access points, traffic signals, shoulders, drainage, and
pedestrian facilities are likely.
Other Activities
Future Cities Competition - Staff has been assisting the teams from Friendly
Hills Middle School throughout the semester. This past week the teams
were completing their scale models and rehearsing their presentations for
the State Competition to be held this Saturday at the University of
Minnesota. The top three teams from FHMS will be competing. All teams
rd
from FHMS will be presenting their cities to faculty and staff on the 23
OL
-y