Loading...
Pipeline 01 10 2014N E W S * : The Pipeline LETTER 00 Public Works `•G� Engineering �� January 10, 2014 Code Enforcement Public Works The Parks Crew repaired a door knob on the warming house door at Marie Park. They checked the warming houses daily and did daily trash pickup in the parks. They plowed the cul-de-sacs, parking lots, bike trails and cleaned the rinks of snow. They attended the Northern Green Expo at the Minneapolis Convention Center. The Utilities Crew checked the lift stations daily. He was called to Swan Court at 2:00 pm on Thursday for a possible sanitary sewer line blockage. The problem was in the homeowner's service. There was another possible blockage at 4:30 pm Friday on Mendota Heights Road. Again, the problem was in the owner's service. The cul-de-sacs were plowed on Saturday morning. There was an alarm at the main lift station for a pump over heat. Pump two needed new seals and bearings. The bad pump floats were taken to the recycling center because the floats have a mercury switch inside. The Streets Crew came in on Saturday to plow and salt all streets. There was a heavy coating of sleet with snow on top of the sleet. All plow trucks were washed. The wings and sanders were greased on the plow trucks. More salt was delivered and the existing salt was pushed up in the salt bin. New curb rubbers were welded onto the plows. The new cat loader was steam cleaned, greased and washed. Engineering City Projects (construction year) Hunter Lane/Orchard Place Neighborhood Improvements (20131 -The project is considered substantially complete and the final lift of wear course asphalt will be placed in the spring. Crown Point & Overlook Neighborhood Rehabilitations (2013) - The contractor will need to finish the final punch -list items in the spring. Highway 13 Trail Connection (20141 -Construction will not begin until the spring. A utility conflict with Saint Paul Regional Water Service needs to be resolved prior to construction. Victoria Road Reconstruction & Rolling Green Neighborhood Rehabilitation (2014/2015 - An RFP for consultant services to design the project has been issued. Proposals are due back to the City on January 15t". Staff anticipates awarding the design at the January 21St Council Meeting. The project will be constructed in phases. The first phase, scheduled for 2014, will reconstruct Victoria from Lilydale to Marie Avenue and rehabilitate the Stratford/Walsh/Rolling Green neighborhood. The remainder of Victoria was put off to a future date, but it is anticipated for construction in 2015. The City of Lilydale has asked that the portion of Victoria from Caren Road to Highway 13 be included at Lilydale's expense. State Proiects Highway 13 Reconstruction (2015) - The section of Highway 13 that was not rehabilitated in 2012 is scheduled for reconstruction in 2015. This section is from I -35E south and west to 2nd Street in Mendota. This section will receive a widened shoulder, curb, gutter, and storm sewer to help alleviate drainage and erosion problems in Lilydale. Highway 149 (Dodd Road) Resurfacing (2015 or 2017) - Dodd Road is scheduled to be resurfaced from Highway 55 in Eagan north to Annapolis Street in 2015. At this time, there are no plans to widen the State Highway, but some alterations for drainage and public safety are possible. The project may be delayed until 2017 to be constructed in conjunction with the Highway 110 resurfacing project. Highway 110 Resurfacing (2017) - Preliminary project scoping has begun. This project will not reconstruct or alter the alignment of the state highway, but modifications to access points, traffic signals, shoulders, drainage, and pedestrian facilities are likely. Other Activities Municipal Separated Sanitary and Storm Sewer (MS4) Permit - Staff has submitted the City's permit application to the MPCA. The City will be continuing under the rules of the 2006 permit until MPCA has reviewed the new application. The new MS4 permit adds requirements for storm water treatment and system maintenance. Staff anticipates the permit will be reviewed and approved by June.