Loading...
Pipeline 01 03 2014N E W S The Pipeline LETTER Public Works Engineering January 3, 2014 Code Enforcement Public Works The Parks Crew are flooding the rinks, plowing the rinks, and checking the warming houses. The shovel handles were replaced at the Friendly Hills hockey rink. The light fixture was repaired at the Marie Avenue warming house. The parking lots and trails were plowed. The Utilities crew shoveled and salted the lift stations as needed, and helped plow the streets during the holiday snow events. The Streets Crew plowed and salted the streets as needed, and bridge decks were cleaned of snow. The cutting edges were changed on the plow trucks. Engineering City Projects (construction year) Hunter Lane/Orchard Place Neighborhood Improvements (20131 -The project is considered substantially complete and the final lift of wear course asphalt will be placed in the spring. Crown Point & Overlook Neighborhood Rehabilitations (2013) - The contractor will need to finish the final punch -list items in the spring. Highway 13 Trail Connection (20141 -Construction will not begin until the spring. A utility conflict with Saint Paul Regional Water Service needs to be resolved prior to construction. Victoria Road Reconstruction & Rolling Green Neighborhood Rehabilitation (2014/20151 - An RFP for consultant services to design the project has been issued. Proposals are due back to the City on January 15t". Staff anticipates awarding the design at the January 21St Council Meeting. The project will be constructed in phases. The first phase, scheduled for 2014, will reconstruct Victoria from Lilydale to Marie Avenue and rehabilitate the Stratford/Walsh/Rolling Green neighborhood. The remainder of Victoria was put off to a future date, but it is anticipated for construction in 2015. The City of Lilydale has asked that the portion of Victoria from Caren Road to Highway 13 be included at Lilydale's expense. State Proiects Highway 13 Reconstruction (2015) - The section of Highway 13 that was not rehabilitated in 2012 is scheduled for reconstruction in 2015. This section is from I -35E south and west to 2nd Street in Mendota. This section will receive a widened shoulder, curb, gutter, and storm sewer to help alleviate drainage and erosion problems in Lilydale. Highway 149 (Dodd Road) Resurfacing (2015 or 2017) - Dodd Road is scheduled to be resurfaced from Highway 55 in Eagan north to Annapolis Street in 2015. At this time, there are no plans to widen the State Highway, but some alterations for drainage and public safety are possible. The project may be delayed until 2017 to be constructed in conjunction with the Highway 110 resurfacing project. Highway 110 Resurfacing (2017) - Preliminary project scoping has begun. This project will not reconstruct or alter the alignment of the State Highway, but modifications to access points, traffic signals, shoulders, drainage, and pedestrian facilities are likely. Other Activities Municipal Separated Sanitary and Storm Sewer (MS4) Permit - Staff has submitted City's permit application to the MPCA. The City will be continuing under the rules of the 2006 permit until MPCA has reviewed the new application. The new MS4 permit adds requirements for storm water treatment and system maintenance. Staff anticipates the permit will be reviewed and approved by June.