The Parks Crew continues to flood the rinks. They plowed the trails, cul-de-
sacs, parking lots and rinks. The hose and ram for plow truck 501 was
replaced. Phone numbers were ordered for the phones that go in the
warming houses.
The Utilities Crew plowed cul-de-sacs and helped plow the north end streets.
There was a high water level alarm at the Northland lift station. The float to
tell the pump to start and the high level alarm relay were broken and were
replaced. Calibration of the gas monitors was completed.
The Streets Crew spent most of the week sanding and plowing the streets.
They cleared the snow off the bridge decks, and helped fix plow truck 501.
Engineering
City Projects (construction year)
Dodd Road/Highway 110 Intersection Pedestrian Improvements (2013) -
The project is substantially complete for 2013. Very minor punch -list items
will be completed in the spring.
Hunter Lane/Orchard Place Neighborhood Improvements (20131 -The
project is considered substantially complete and the final lift of wear course
asphalt will be placed in the spring. Assessment amounts not paid by
November 1st will be reflected on future annual property tax statements.
Crown Point & Overlook Neighborhood Rehabilitations (2013) - The
contractor is finishing the final punch -list items. Assessment amounts not
paid by November 18th will be reflected on future annual property tax
statements.
Sanitary Sewer Cleaning and Televising (2013 - This project is
substantially complete. Staff will review the data received from the
contractor and determine which sections of sewer require lining in 2014.
Sanitary Sewer Lining (2013 -This project will install a liner in place on
sections of sanitary sewer main that have been identified as having multiple
root penetrations or other faults. All lining activities this year were
identified by the 2012 cleaning and televising contract. Minor traffic impacts
should be anticipated while the contractor accesses manholes. Lining is
expected to add up to 25 years to the life of the sanitary sewer main.
Mendota Heights Road Sanitary Sewer Force Main Replacement (2013) -
This project is complete, and the new main is in service and functional.
Highway 13 Trail Connection (20131 - All easements necessary for
construction are executed. As soon as MnDOT State Aid office gives the City
permission, a notice -to -proceed will be given to the contractor, but
construction will not begin until the spring. A utility conflict with Saint Paul
Regional Water Service needs to be resolved prior to construction.
Victoria Road Reconstruction & Rolling Green Neighborhood Rehabilitation
(2014/2015 - Council ordered the design of the entire project with the
instruction that Victoria Road from Highway 13 to Marie Avenue to be
reconstructed in 2014 as well as the rehabilitation area of Rolling Green
Curve, Stratford Road, Walsh Lane, Coventry Court, Windwood Court, and
Oxford Court. The construction of the remainder of Victoria was put off to a
future date, but it is anticipated for construction in 2015. Staff will begin
designing the project this winter with anticipated bid opening in May with
construction beginning June 2014.
State Projects
MnDOT Commissioner/Met Council Open Houses - Minnesota Department of
Transportation Commissioner Charlie Zelle and Metropolitan Council Chair
Sue Haigh invited the public to attend town hall meetings on transportation,
including transit, on several dates in December. All meetings are from 4:00
to 6:00 p.m. The last meeting is scheduled for Tuesday, Dec. 17 at
Burnsville High School Theatre, Mraz Center for the Performing Arts, 600
East Highway 13, Burnsville, MN. Zelle and Haigh will lead a discussion
about transportation, how it affects quality of life, its link to Minnesota's
economy and the importance of investing in this state asset. The officials
will also take feedback and answer questions about Minnesota's
transportation system. Local MnDOT officials will be available to answer
questions, as well. Everyone is invited and encouraged to attend. Additional
information is available at www.mndot.gov/minnesotago/.
Highway 13 Reconstruction (2015)- The section of Highway 13 that was
not rehabilitated in 2012 is scheduled for reconstruction in 2015. This
section is from I -35E south and west to 2nd Street in Mendota. This section
will receive a widened shoulder, curb, gutter, and storm sewer to help
alleviate drainage and erosion problems in Lilydale.
Highway 149 (Dodd Road) Resurfacing (2015?1 - Dodd Road is scheduled to
be resurfaced from Highway 55 in Eagan north to Annapolis Street in 2015.
At this time, there are no plans to widen the State Highway, but some
alterations for drainage and public safety are possible. Curb, gutter, and
storm sewer will be installed where drainage and erosion issues exist. The
project may be delayed until 2017 to be constructed in conjunction with the
Highway 110 resurfacing project.
Highway 110 Resurfacing (2017) - Preliminary project scoping has begun
for the resurfacing for Highway 110. This project will not reconstruct or
otherwise alter the alignment or configuration of the State Highway, but
modifications to access points, traffic signals, shoulders, drainage, and
pedestrian facilities are likely.
Other Activities
Future Cities Competition - Staff is once again assisting 6t" through 8t"
grade students at Friendly Hills Middle School with their entries in the Future
Cities Competition. This competition challenges middle school students to
conceptually develop a city of the future addressing issues and needs
municipalities will face in the coming years. This year's theme is,
"Tomorrow's Transit: Design a Way to Move People In and Around Your
City," so the students will be looking at how people, materials, and products
move throughout a developed community. The students have completed
their computer models using the popular Sim City game, and are completing
their research essays. Next week staff will help review the students' oral
presentation of their essays. There are some very unique and innovative
ideas being proposed by the student groups. Friendly Hills Middle School
should, once again have some very successful teams in the competition.