Pipeline 12 06 2013N E W s The Pipeline
LETTER
Public Works
EngineeringI
o • •
Code Enforcement 3December 6, 2013
Public Works
The Parks Crew started flooding the hockey rinks. They plowed the cul-de-
sacs, parking lots, pedways and skating rinks. The new aerator system was
set up at Rogers Lake. The old baffle unit was removed and a new unit
installed. New hoses were also installed on the aerator.
The Utilities Crew checked the lift stations daily. He helped plow the
streets. The sump pump was changed out at the main lift station. A
sanitary sewer inspection was done after a demolition on First Avenue. The
sanitary sewer line and water line was capped.
On Monday, the Streets Crew salted all city streets. Hydraulic hoses were
replaced on the salt spinners on truck 312. All wings on the plows were
greased. Salt was delivered and pushed up in the storage shed. During the
snow fall on Tuesday and Wednesday (4.1 recorded at the airport) they
plowed all city streets twice and main lines three times. Leaky hydraulic
hoses are being worked on truck 308. A few mailboxes have been repaired.
Engineering
Citv Proiects (construction vear
Dodd Road/Highway 110 Intersection Pedestrian Improvements (2013 -
The project is substantially complete for 2013.
Hunter Lane/Orchard Place Neighborhood Improvements (2013) -The project is
considered substantially complete and the final lift of wear course asphalt will be
placed in the spring. Assessment amounts not paid off by November 1st have been
certified to the County and payable through annual property tax statements.
Crown Point & Overlook Neighborhood Rehabilitations (2013 - The contractor is
finishing the final punch -list items. Assessment amounts not paid off by November
18th have been certified to the County and payable through annual property tax
statements.
Sanitary Sewer Cleaning and Televising (2013) - This project is substantially
complete. Staff will review the data when the final report is received from the
contractor and determine which sections of sewer require lining in 2014.
Sanitary Sewer Lining (2013) -This project will install a liner in place on sections
of sanitary sewer main that have been identified as having multiple root
penetrations. All lining activities this year were identified by the 2012 cleaning and
televising contract and will be on the north end of the city. Minor traffic impacts
should be anticipated while the contractor accesses manholes. Lining is expected
to add up to 25 years to the life of the sanitary sewer main.
Mendota Heights Road Sanitary Sewer Force Main Replacement (2013J_ -
The new main is in service and functional. The days of force main breaks are
hopefully behind us.
Highway 13 Trail Connection (2013) - The contractor is ready to mobilize for
construction. As soon as MnDOT State Aid office gives the City permission, a
notice -to -proceed will be given to the contractor. A utility conflict with Saint Paul
Regional Water Service needs to be resolved in conjunction with the construction.
Victoria Road Reconstruction & Rolling Green Neighborhood Rehabilitation
(2014/2015 - Council ordered Victoria Road from Highway 13 to Marie Avenue to
be reconstructed in 2014 as well as the rehabilitation area of Rolling Green Curve,
Stratford Road, Walsh Lane, Coventry Court, Windwood Court, and Oxford Court.
Staff will begin designing the project this winter with anticipated bid opening in
May with construction beginning June 2014.
State Projects
MnDOT Commisioner/Met Council Open Houses - Minnesota Department of
Transportation Commissioner Charlie Zelle and Metropolitan Council Chair
Sue Haigh invited the public to attend town hall meetings on transportation,
including transit, on several dates in December. All meetings are from 4:00
to 6:00 p.m.
• Tuesday, Dec. 3 at Minneapolis Public Library, Pohlad Hall 300 Nicollet
Mall, Minneapolis, MN
• Wednesday, Dec. 4 at Anoka/Ramsey Community College, Coon
Rapids Campus, Legacy Conference Room, 11200 Mississippi Blvd.
NW, Coon Rapids, MN
• Tuesday, Dec. 10 at St. Paul Union Depot, Veterans Gallery, 214 E. 4t"
Street., St. Paul, MN
• Thursday, Dec. 12 at Century College, 3300 Century Ave. N., Room
#2315, White Bear Lake, MN
• Tuesday, Dec. 17 at Burnsville High School Theatre, Mraz Center for
the Performing Arts, 600 East Highway 13, Burnsville, MN,
Zelle and Haigh will lead a discussion about transportation, how it affects
quality of life, its link to Minnesota's economy and the importance of
investing in this state asset. The officials will also take feedback and answer
questions about Minnesota's transportation system. Local MnDOT officials
will be available to answer questions, as well. Everyone is invited and
encouraged to attend. Additional information is available
at www.mndot.gov/minnesotago/.
Highway 13 Reconstruction (2015) - The section of Highway 13 that was
not rehabilitated in 2012 is scheduled for reconstruction in 2015. This
section is from I -35E south and west to 2nd Street in Mendota. This section
will receive a widened shoulder, curb, gutter, and storm sewer to help
alleviate drainage and erosion problems in Lilydale.
Highway 149 (Dodd Road) Resurfacing (20151 - Dodd Road is scheduled to
be resurfaced from Highway 55 in Eagan north to Annapolis Street in 2015.
At this time, there are no plans to widen the State Highway, but some
alterations for drainage and public safety are possible. Curb, gutter, and
storm sewer will be installed where drainage and erosion issues exist.
Highway 110 Resurfacing (2017) - Preliminary project scoping has begun
for the resurfacing for Highway 110 in 2017. This project will not
reconstruct or change the alignment of the State Highway, but modifications
to access points, traffic signals, shoulders, drainage, and pedestrian facilities
are all likely.
Other Activities
Future Cities Competition - Staff is once again assisting 6t" through 8t"
grade students at Friendly Hills Middle School with their entries in the Future
Cities Competition. This competition challenges middle school students to
conceptually develop a city of the future addressing issues and needs
municipalities will face in the coming years. This year's theme is,
"Tomorrow's Transit: Design a Way to Move People In and Around Your
City," so the students will be looking at how people, materials, and products
move throughout a developed community. The students have completed
their computer models using the popular Sim City game, and have begun
researching their essays. There are some very unique and innovative ideas
being proposed by the student groups. Friendly Hills Middle School should,
once again have some very successful teams in the competition.