Loading...
Pipeline 11 22 2013Public Works Engineering Code Enforcement Public Works Pipeline November 22, 2013 The Parks Crew picked up extra trash barrels from the parks and put them in winter storage. They finished fertilizing the parks, cleaned up the fertilizer spreader and put it away for winter storage. Trees were trimmed in the parks as needed. All boards were removed and replaced on the bridge in Valley Park. Tractor 510 was serviced for winter storage. A fallen tree limb was removed from the pedway in Valley Park. The Utilities Crew cleaned the sanitary sewer lines along Lilac Lane. The homeowner had their line cleaned and pushed roots into the city's main line. The ventilation fan was fixed by replacing fuses at the Mendota Heights Road lift station. The force main work continues. Work was observed by city personnel when the cutovers were done. The work is scheduled to be completed next week. The Streets Crew was busy all week sweeping up leaves with Pearson Brothers. Trees were trimmed with Blue Chip from complaints that were received in the Avenues, Maple Park Drive and Ivy Hill Drive areas. Thursday evening they salted the bridge decks on Mendota Heights Road, Acacia Blvd, and Wagon Wheel Trail. Engineering City Projects (construction year) Dodd Road/Highway 110 Intersection Pedestrian Improvements (2013) - The contractor is working on the punch -list items, and signal completion will take place upon delivery of parts from MnDOT. New luminaires have been installed at the NE corner. Hunter Lane/Orchard Place Neighborhood Improvements (20131 -The project is considered substantially complete and the final lift of wear course asphalt will be placed in the spring. Assessment amounts not paid off by November 1s' have been certified to the County and payable through annual property tax statements. Crown Point & Overlook Neighborhood Rehabilitations (2013) - The contractor is finishing the final punch -list items. Assessment amounts not paid off by November 18th have been certified to the County and payable through annual property tax statements. Sanitary Sewer Cleaning and Televising (2013 - This project is substantially complete. Staff will review the data when the report is received from the contractor. Sanitary Sewer Lining (2013 -This project will install a liner in place on sections of sanitary sewer main that have been identified as having multiple root penetrations. All lining activities this year will be on the north end of the city. Minor traffic impacts should be anticipated while the contractor accesses manholes. Lining is expected to add up to 25 years to the life of the sanitary sewer main. Mendota Heights Road Sanitary Sewer Force Main Replacement (2013) - The main directional drilling is complete. The contractor is planning to switch over to the new line today Friday November 22nd Highway 13 Trail Connection (20131 - The contractor is ready to mobilize for construction. As soon as MnDOT State Aid office gives the City permission, a notice -to -proceed will be given to the contractor. A utility conflict with Saint Paul Regional Water Service needs to be resolved in conjunction with the construction. Rolling Green Neighborhood Rehabilitation & Victoria Road Reconstruction 2014? - Council ordered Victoria Road from Highway 13 to Marie Avenue to be constructed in 2014 as well as the rehabilitation area of Rolling Green. Staff will begin designing the project this winter.