Loading...
Pipeline 10 25 2013NEWS LETTER Public Works Engineering Code Enforcement Public Works The Pipeline October 25, 2013 The Parks Crew mulched up leaves in the parks. The soccer fields were striped for the last time this season. The soccer fields at Kensington Park South were aerated and prepared for top dressing with dormant seeding. All soccer goals were taken down and put away for winter storage. Ice melt and the snow blower were brought to city hall for winter. Woods chips were hauled from Mendakota Park to Curleys Tot Lot and they were spread around. A load of wood chips was taken to the Par 3. The Utilities Crew did lift station fall checkups on the Mendota Heights Road lift station, St. Thomas lift station, and the Lilydale lift station. The three lift station all looked good. Trees were trimmed in the sanitary sewer easements on old Highway 13 and the north east interceptor line. He assisted the Streets Crew with blacktopping. A sanitary sewer line inspection was done on Callahan Place for the repair of a broken service line. The Streets Crew ringed water boxes and manholes with hot mix on the south end of the city, Warrior Drive and the Highway 110 Frontage Road. They put the cutting edge for the grapple bucket on the bobcat. They set up the site for the Halloween bonfire, so residents can dump their brush staring this weekend.