Pipeline 10 25 2013NEWS
LETTER
Public Works
Engineering
Code Enforcement
Public Works
The
Pipeline
October 25, 2013
The Parks Crew mulched up leaves in the parks. The soccer fields were
striped for the last time this season. The soccer fields at Kensington Park
South were aerated and prepared for top dressing with dormant seeding.
All soccer goals were taken down and put away for winter storage. Ice melt
and the snow blower were brought to city hall for winter. Woods chips were
hauled from Mendakota Park to Curleys Tot Lot and they were spread
around. A load of wood chips was taken to the Par 3.
The Utilities Crew did lift station fall checkups on the Mendota Heights Road
lift station, St. Thomas lift station, and the Lilydale lift station. The three lift
station all looked good. Trees were trimmed in the sanitary sewer
easements on old Highway 13 and the north east interceptor line. He
assisted the Streets Crew with blacktopping. A sanitary sewer line
inspection was done on Callahan Place for the repair of a broken service
line.
The Streets Crew ringed water boxes and manholes with hot mix on the
south end of the city, Warrior Drive and the Highway 110 Frontage Road.
They put the cutting edge for the grapple bucket on the bobcat. They set
up the site for the Halloween bonfire, so residents can dump their brush
staring this weekend.