Pipeline 10 18 2013N E W s The Pipeline
LETTER A X
Public Works
Engineering "4WOctober 18, 2013
Code Enforcement
Public Works
The Parks Crew removed the water aerators from the out buildings. The
sprinkler systems were blown at Mendakota and Kensington Parks. Both
outbuildings at Mendakota and Kensington Parks were winterized. The
summer supplies from the outbuildings were taken out and put in winter
storage. They attended a seminar at the MnDOT District Building in St.
Cloud. The mulching kit was installed on the xmark mower.
The alarm went off for high water at the Veronica lift station on Tuesday.
The Utilities Crew attended safety meetings at Mendota Heights and West
St. Paul. Sanitary sewer lines were cleaned along Victoria Curve, Overlook
Road, and James Road. Root killer was put in the lines at Overlook Road
and James Road. Water samples were collected from Interstate Valley
Creek and Lilydale Creek. They will be taken to the Minnesota Department
of Health for analysis.
The Streets Crew checked storm grates throughout the city. They finished
blacktop patching on Mendota Heights Road. They did blacktop patching on
Commerce Drive and Lemay Lake Road.
Engineering
City Projects (construction yearl
Dodd Road/Highway 110 Intersection Pedestrian Improvements (2013) -
Staff completed the punch -list walk through with the City's consultant on
Thursday. Minor items were identified for correction, and the street light at
the northeast quadrant of the intersection needs to be installed.
Hunter Lane/Orchard Place Neighborhood Improvements (20131 - City
Council held the assessment hearing at their October 1St meeting and
adopted the assessment roll for the project. Assessed property owners can
pay their assessment off partially or in -full at City Hall up until November
1St. After that the remaining assessed amount will be certified to the County
and payable through annual property tax statements.
Crown Point & Overlook Neighborhood Rehabilitations (2013) - City Council
held the assessment hearing at their October 15th meeting and adopted the
assessment roll for the project. Assessed property owners can pay their
assessment off partially or in -full at City Hall up until November 15th. After
that the remaining assessed amount will be certified to the County and
payable through annual property tax statements.
Sanitary Sewer Cleaning and Televising (20131 - This project is underway.
The contractor is working in the area of the city west of I -35E and north of
Highway 110. Cleaning has been completed along Marie, Victoria, Overlook,
Lilac, and James. Center Pointe Business Park is also included in the
project. Minor traffic impacts should be anticipated.
Mendota Heights Road Sanitary Sewer Force Main Replacement (2013) -
City Council awarded the contract to GM Construction at their October 15th
meeting. Staff held a pre -construction meeting on Thursday. Construction
should begin within the next two weeks and completion of the project is
expected later this fall.
Highway 13 Trail Connection (20131 - The contractor is ready to mobilize
for construction. As soon as MnDOT State Aid office gives the City
permission, a notice -to -proceed will be given to the contractor. A utility
conflict with Saint Paul Regional Water Service needs to be resolved in
conjunction with the construction. Anticipated completion of the trail will be
later this fall.
Rolling Green Neighborhood Rehabilitation & Victoria Road Reconstruction -
An informal neighborhood meeting is scheduled for October 23rd at City Hall.
Notices for the meeting have been sent to affected property owners. The
public hearing before City Council is scheduled for November 5th
County Projects (Construction Year)
North Urban Regional Trail (NURT) Realignment/Greenway Corridor -
County staff presented an update to the City Council at their October 15th
meeting. The City of West Saint Paul is planning on reconstructing Marie
Avenue from Delaware to Charlton in conjunction with the NURT
realignment construction in 2014, and an outdoor amphitheater feature will
be added at the northwest corner of the Henry Sibley High School property.
For more information, contact the County Project Manager, Mr. Chris
Hartzell, at 952-891-7106.
Other Activities
Traffic Safety Committee - The Traffic Safety Committee met prior to the
October 1St City Council meeting to discuss two items: First, a discussion
regarding parking on the east side of Warrior Drive by Henry Sibley High
School students. Second a review of resident concerns about speed on
Decorah Lane. The Committee will present their recommendations to the
City Council at their November 5th meeting.
Gun Club Lake Watershed Management Organization (GCLWMO� - All
member cities in the GCLWMO have passed resolutions to dissolve the
existing Joint Powers Agreement (JPA).
Minnesota 2050 - Staff attended the quarterly meeting of Minnesota 2050,
a group of industry professionals working to educate the public on the
importance of infrastructure and Science, Technology, Engineering, and
Math (STEM) education. The group, in conjunction with Twin Cities Public
Television, is producing a series of documentaries on the subject. Airing of
the first documentary is scheduled for early spring 2014.