The Parks installed new hockey boards at Wentworth and Marie Parks. Pea
gravel was hauled out of Mendakota Park that was left over from the
playground equipment. Trees were trimmed around the concession stand at
Kensington Park South. The sprinkler systems were drained and blown out
with an air compressor at the fire hall and city hall.
The Utilities Crew checked the lift stations daily which includes pulling the
pumps out of the wet well, checking the oil, checking the inside of the
motor, and checking the inside of the electrical control panel. All the
stations looked good except the storm lift station. A muskrat had chewed a
hole in the power cord and the problem was repaired. All sanitary sewer
manholes in the Hunter and Orchard area were checked. Dirty manholes
were cleaned by Northdale Construction. The sanitary sewer lines along
Brookside Lane were cleaned. A sanitary sewer inspection was done on
Ocala Lane where a repair had been done.
The Streets Crew helped the Parks Crew move the access pea rock from
Mendakota Park to the city's staging area. Blacktop patching was done in
the Bunker Hills area. Street overlay work was done on Mendota Heights
Road from Dodd Road to Delaware Avenue. They helped Gartsky
Construction load up with gravel, rock and black dirt for use at Maple Park
Drive and for other projects Gartsky is doing in the city.
Engineering
City Projects (construction year)
Dodd Road/Highway 110 Intersection Pedestrian Improvements (2013) -
The project is substantially complete except minor punch list items and a
resolution to the trail realignment. Some signal lighting and timing issues
remain as well.
Hunter Lane/Orchard Place Neighborhood Improvements (20131 - The
project is substantially complete. Asphalt wear course has been placed on
Culligan, Glenhill, and Orchard Circle, Veronica still does not have a base
course. Sod and boulevard grading should be near complete on Monday.
Wear course will be placed on Hunter Lane and Orchard Place in the spring.
Crown Point & Overlook Neighborhood Rehabilitations (2013) - This project
is substantially complete. The contractor will be repairing the punch list
items during the remaining construction season. An assessment hearing is
scheduled for the October 15th City Council meeting.
Sanitary Sewer Cleaning and Televising (20131 - This project is underway.
The contractor is working in the area of the city west of I -35E and north of
Highway 110. Center Pointe Business Park is also included in the project.
Minor traffic impacts should be anticipated.
Mendota Heights Road Sanitary Sewer Force Main Replacement (2013) -
Bids were opened on October 9th. The force main has broken 5 times in the
past 6 years and is in need of replacement. Staff is recommending the
project be completed this fall versus waiting until 2014. GM Contracting
would be the low bidder for the 2013 project.
Highway 13 Trail Connection (20131 -Notice to proceed with construction is
anticipated as soon as the remaining easements have been secured for
construction, and the project should be completed within three to four
weeks from the start date. Construction is expected to begin in mid-
October.
County Projects (Construction Year)
North Urban Regional Trail (NURT) Realignment/Greenway Corridor -
County staff is progressing on the design of the trail realignment through
the Henry Sibley property. The County Project Manager will be giving an
update to the City Council on October 15th. The City of West Saint Paul is
planning on reconstructing Marie Avenue from Delaware to Charlton in
conjunction with the NURT realignment construction in 2014.
Other Activities
Traffic Safety Committee -The Committee will present their
recommendations to the City Council at their October 15th meeting.