The Parks Crew cleaned up the ground master and prepared it for a major
repair. All soccer and ball fields were striped. Grass was cut. Weeds were
cut at the tennis courts at Ivy Falls and Wentworth Parks.
Utility Crew responded to a five-hour power outage on Sunday night at the
Mendota Heights Road lift station. Broadleaf weeds were sprayed at
Mendakota Park, the Fire Hall, Friendly Hills Park, North and South
Kensington Parks and Rogers Lake Park.
Streets Crew replaced the crosswalk sign at the Mendota Heights Road
roundabout due to it being run over. Blacktop patching was done on Victory
Road. A tree stump was pulled out on Stanwich Lane and the area was then
filled with black dirt and seed. Brackets were made up for the new
generator and were installed into the concrete.
Engineering
City Projects (construction year)
Dodd Road/Highway 110 Intersection Pedestrian Improvements (2013) -
Construction is underway. Concrete work on the southwest, southeast, and
east median islands is nearly complete. Northeast island is expected to be
complete next week. The base of the trail is in place and paving should be
completed next week. Traffic impacts are greater than anticipated, but
detours are available to the north along Marie Avenue, or to the south along
Mendota Heights Road. Police are monitoring detour routes for speed
compliance. Substantial completion of the project is expected by
September 161H
Hunter Lane/Orchard Place Neighborhood Improvements (20131 - Utility
installation is substantially complete. Base course of pavement has been
placed on Orchard, Culligan, and Glenhill. Curb and Gutter installation along
Hunter is expected in the next week, followed by road base grading.
Pavement of Hunter can be expected in approximately two weeks. The
contractor has replaced the culvert under Lexington Avenue. The pavement
patch will be installed next week. Substantial completion is expected by the
end of September with the assessment hearing in October. For more
information, please go to the project page on the city web
page: www.mendota-heights.com. Project information is updated weekly.
Crown Point & Overlook Neighborhood Rehabilitations (2013) - This project
is substantially complete. Staff has been preparing the project punch -list,
and the contractor will be repairing the punch list items during the
remaining construction season. An assessment hearing is scheduled for
October 15th during the regularly scheduled City Council meeting.
Lexington Avenue Pedestrian Trail, Hwy 110 to Douglas Road (20131 - New
sod was placed on the northern portion of the trail to repair damage done
during construction. The trail is open for use.
Sanitary Sewer Cleaning and Televising (20131 - This project is underway.
The contractor is working in the area of the city west of I -35E and north of
Highway 110. Center Pointe Business Park is also included in the project.
Minor traffic impacts should be anticipated.
Mendota Heights Road Sanitary Sewer Force Main Replacement (2013) -
Design of the replacement force main is ongoing and the design should be
ready for bid by October/ November. This force main has broken 5 times in
the past 6 years and is in need of replacement. Construction of the
replacement could begin as early as this fall.
Highway 13 Trail Connection (20131 - City Council awarded the project to
Urban Companies of Vadnais Heights at their September 3rd meeting. City
Staff is working with adjacent property owners on acquiring the necessary
easements for the project. Notice to proceed with construction is
anticipated in mid-September and the project should be completed within a
few weeks from the start date. Construction is expected to begin in late
September/early October.
County Projects (Construction Year)
Delaware Avenue Guardrails (2013) - Installation of guardrails on Delaware
Avenue in selected location between Highway 110 and I-494 will begin later
this month. Plans have been completed and are under inter -agency review.
Construction is expected within the coming weeks.
North Urban Regional Trail (NURT) Realignment/Greenway Corridor -
County staff is progressing on the design of the trail realignment through
the Henry Sibley property. The County Project Manager will be giving an
update to the Parks and Recreation Commission on October 8th, and to the
th
City Council on October 15
Other Activities
Lower Mississippi River Watershed Management District (LMRWMO) - Staff
attended a Public Open House on Thursday night for the LMRWMO
sponsored Watershed Restoration And Protection (WRAP) plan being
developed for Rogers Lake and Lake Augusta in Mendota Heights. These
lakes and surrounding watersheds are being studied to provide the City and
area residents with practices that can improve the overall water quality in
the water bodies. The final report is expected to be published over the
winter. For more information contact City Engineering staff.
Gun Club Lake Watershed Management Organization (GCLWMO� - City
Council formally requested to dissolve the Joint Powers Agreement (JPA)
that governs the GCLWMO at their September 3rd meeting. The request will
be forwarded to both the GCLWMO and the LMRWMO Boards as well as to
the Engineering staff of the other two GCLWMO member cities, Inver Grove
Heights and Eagan. If one other member city agrees with dissolving the
JPA, Mendota Heights will be able to combine watershed areas and place
essentially the entire city into the LMRWMO.