Pipeline 08 23 2013NEWS
LETTER
Public Works
Engineering
Code Enforcement
Public Works
The Pipeline
August 23, 2013
The Parks Crew set up the soccer field at Mendakota Park and striped it. Newly
planted seed that was put down around the water tower was watered. Trees were
trimmed along the pedways in Kensington Park South and Hagstrom King Park. A
broken sprinkler head was repaired on the Mendakota ball fields. Repairs were
made to the xmark mower. They attended a safety meeting.
The Utilities Crew cut tree roots in the sanitary sewer lines along Keokuk Lane,
Pontiac Place, and Ocala Lane. The force main on Mendota Heights Road had a
leak inside and was repaired. He attended the safety meeting.
The Streets Crew attended the safety training meeting in South Saint Paul.
Blacktop patching continued on Marie Avenue from Lexington Avenue to
Victoria Road. They continued filling potholes on Victoria Road and stopped
at Stratford Road. The generator was lifted onto the concrete pad. Potholes
were filled on Mendota Heights Road by Patterson Dental.
Engineering
City Projects (construction year)
Dodd Road/Highway 110 Intersection Pedestrian Improvements (2013) -
Utilities have been located and marked. Construction began Wednesday
and is scheduled for completion by September 3rd. A portion of Interstate
Valley Creek Trail northwest of the intersection will be relocated as part of
the contract. Temporary access agreements have been executed with the
private property owners for the removal of the existing trail.
Hunter Lane/Orchard Place Neighborhood Improvements (20131 -Storm
sewer installation along Hunter and east Culligan has begun and is
scheduled to be completed by Wednesday August 28th, a road closure on
Lexington Avenue is scheduled for Wednesday to install a culvert. The
contractor will also begin grading Hunter Lane. Substantial completion is
expected by the end of September with the assessment hearing in October.
For more information, please go to the project page on the city web
page: www.mendota-heights.com. Project information is updated weekly.
Crown Point & Overlook Neighborhood Rehabilitations (2013) - This project
is substantially complete. Staff has been preparing the project punch -list,
and the contractor will be repairing the punch list items in August. An
assessment hearing is scheduled for October.
Lexington Avenue Pedestrian Trail, Hwy 110 to Douglas Road (2013) - The
trail has been re -paved, and pedestrian ramps installed. Punch -list items
remain along with minor landscape restoration. The trail is open for use.
Sanitary Sewer Cleaning and Televising (2013 - This project is underway.
The contractor will be working in the area of the city west of I -35E and
north of Highway 110. Center Pointe Business Park is also included in the
project. Minor traffic impacts should be anticipated. An item of jewelry was
found in the sanitary sewer in this area and is being held at City Hall. Call
the Engineering Department at 651-452-1850 if you are missing an item
and can describe what was found.
Mendota Heights Road Sanitary Sewer Force Main Replacement (2013) -
Design of the replacement force main is anticipated to be complete and
ready for bid by October/ November. This force main has broken 5 times in
the past 6 years and is in need of replacement. Construction of the
replacement could begin as early as this fall.
Highway 13 Trail Connection (20131 - Council approved final plans and
authorized advertisement for bids at their August 6th meeting. City Staff is
working with adjacent property owners on acquiring the necessary
easements for the project. Bid opening is scheduled for August 28th at
10:00am. Construction is expected in late September/early October.
County Projects (Construction Year)
Delaware Avenue Guardrails (2013) - Installation of guardrails on Delaware
Avenue in selected locations between Highway 110 and I-494 will begin
later this month. Plans have been completed and are under inter -agency
review. Construction is expected within the coming weeks.
North Urban Regional Trail (NURT) Realignment & Greenway Plan (20141 -
County staff is working on completing the design of the NURT to meet their
Greenway Plan for the area. The trail will be re-routed north along Warrior
Drive to Marie within the Henry Sibley High School property. In West Saint
Paul, the newly aligned trail will be routed through the Dodge Nature Center
on the north side of Marie Avenue, and a tunnel will be installed under
Charlton Avenue at Garlough Elementary School. Construction is expected
during the summer of 2014.