Loading...
Pipeline 08 02 2013N E W S The Pipeline LETT E R iiii� Public Works ■t�' Engineering -- August 2, 2013 Code Enforcement Public Works The Parks Crew aerated the soccer fields at Kensington Park South and all neighborhood baseball fields. Grass seed was put down on the soccer fields at Kensington Park South along with the Mendakota Park soccer field, and Hagstrom King baseball fields. Dead shrubs were replaced around park signs. Bases were moved back to their normal lengths after the weekend tournament. Rec rock was put down and leveled around fields one and two at Mendakota Park. Black dirt was put down and is being prepared for grass seed around the water tower. The Utilities Crew cleaned sanitary sewer lines along Vicki Lane, Overlook Road, Douglas Road, and Lilac Lane. A piece of jewelry was found in the line and is being held at City Hall. Call 651-452-1850 to claim. Weeds were sprayed with weed killer that are growing in the cracks on all pedways. The Streets Crew helped rebuild the wear bar on the field dragger. They helped install the strobe light on the engineering truck. Three brush piles were cleaned up on Keokuk Lane and Pagel Road. A low spot along Kendon Lane was filled in and erosion control was installed and the bank seeded. Seal coating chips were hauled to the staging area after being swept up. Engineering City Projects (construction year) Dodd Road/Highway 110 Intersection Pedestrian Improvements (2013) - Construction is scheduled to begin Monday, and is scheduled for completion by September 3rd. A portion of Interstate Valley Creek Trail northwest of the intersection will be relocated as part of the contract. Hunter Lane/Orchard Place Neighborhood Improvements (20131 - Curbing has been installed on Orchard Place through the curve to Hunter Lane, and the base material has been placed and compacted. Utility construction on Hunter has begun. Paving activity is expected to begin on Orchard in the coming weeks. A stockpile of material has been placed on Glenhill Road at Victoria, so residents accustomed to using this access are asked to use Culligan Lane off Hunter temporarily. Rehabilitation work on Veronica, Orchard Circle, Culligan, and Glenhill is expected in the coming weeks. Substantial completion is expected by the end of September with the assessment hearing in October. Crown Point & Overlook Neighborhood Rehabilitations (2013) - This project is substantially complete. Staff has been preparing the project punch -list, and the contractor will be repairing the punch list items in August. An assessment hearing is scheduled for October. Lexington Avenue Pedestrian Trail, Hwy 110 to Douglas Road (20131 - The trail has been re -paved, and pedestrian ramps installed. Punch -list items remain along with some minor landscape restoration. The trail has been re- opened. Sanitary Sewer Cleaning and Televising (20131 - This project is underway. The contractor will be working in the area of the city west of I -35E and north of Highway 110. Center Pointe Business Park is also included in the project. Minor traffic impacts should be anticipated. During this week's cleaning, an item of jewelry was found in the sanitary sewer and is being saved at City Hall. Call the Engineering Department at 651-452-1850 if you are missing an item and can describe what was found. Mendota Heights Road Sanitary Sewer Force Main Replacement (2013) - The design contract was awarded at the City Council's July 16th meeting. Design is anticipated to be complete and ready for bid by October/ November. This force main has broken 5 times in the past 6 years and is in need of replacement. Construction of the replacement could begin as early as this fall. Highway 13 Trail Connection (20131 - The City did not receive the DNR grant money we had applied for, but the City will be moving forward with this trail construction this summer anyway. The trail will connect Riverside Lane to Lilydale Road along the south side of Highway 13. Authorization to bid the project is scheduled for the August 6th City Council Meeting. Construction is expected in October. County Projects (construction year) Lexington Avenue Crosswalk (2013) - The crosswalk and island at the Victoria/ Lexington intersection is scheduled for installation in August. Surveyors have marked the area and utilities have been located. Specific schedules will be posted as they are planned. Delaware Avenue Guardrails (2013) - Guardrails along both sides of Delaware Avenue, between Highway 110 and Interstate 494 will be installed this summer. Design of the guardrails has been completed. County maintenance crews will be doing the installation and they are scheduled for installation in August. Other Activities Lower Mississippi River Watershed Management Organization (LMRWMO) - Staff attended the monthly meeting on Thursday. The 2014 budget was approved, and a consultant contract was approved for studying PAH contamination in Thompson Lake in West Saint Paul. The LMRWMO board also discussed Mendota Heights' request to remove themselves from the Gun Club Lake WMO and join completely with the LMRWMO.