Pipeline 07 26 2013N E W S The Pipeline
LETTER
Public Worksit o
Engineering July 26, 2013
Code Enforcement
Public Works
The Parks weed whipped the weeds along the trails and the signs on the
trails. Overhanging tree limbs were trimmed along the pedways. The
concrete pads were cleaned at Mendakota Park around the baseball and
softball benches. They finished repairs on the groundsmaster mower which
had a broken arm U joint. They set up the baseball fields for the upcoming
tournaments this weekend. Bases were moved to the right lengths.
The Utilities Crew cleaned the sanitary sewer lines along Diane Road,
Barbara Court, Nina Court, Adeline Court, Rae Court, and North and South
Highview Circle.
The Streets Crew cleaned up 17 tree stumps. The tree stumps were ground
up, filled in with black dirt and grass seed was put down. The beaver dam
was cleaned out of the storm outlet pipe on Pond Circle East. They trimmed
trees because of sight distance problems at Bachelor Avenue and Dodd
Road and at Colshire Lane. A pump was fixed on the bobcat broom.
Engineering
City Projects (construction yearl
Dodd Road/Highway 110 Intersection Pedestrian Improvements (2013) -
Construction is scheduled to begin next week, and is scheduled for
completion by September 3rd. A portion of Interstate Valley Creek Trail
northwest of the intersection will be relocated as part of the contract.
Hunter Lane/Orchard Place Neighborhood Improvements (20131 - Curbing
has been installed on Orchard Place through the curve to Hunter Lane.
Utility construction on Hunter has begun. Paving activity is expected to
begin on Orchard in the coming weeks. Rehabilitation work on Veronica,
Orchard Circle, Culligan, and Glenhill is expected in late July/early August.
Substantial completion is expected by the end of September with the
assessment hearing in October.
Crown Point & Overlook Neighborhood Rehabilitations (2013) - This project
is substantially complete. Staff has been preparing the project punch -list,
and the contractor will be repairing the punch list items in August. An
assessment hearing is scheduled for October.
Lexington Avenue Pedestrian Trail, Hwy 110 to Douglas Road (2013 - The
trail has been re -paved, and pedestrian ramps installed. Punch -list items
remain along with some minor landscape restoration. The trail has been re-
opened.
Sanitary Sewer Cleaning and Televising (2013 - This project is underway.
The contractor will be working in the area of the city west of I -35E and
north of Highway 110. Center Pointe Business Park is also included in the
project. Minor traffic impacts should be anticipated.
Mendota Heights Road Sanitary Sewer Force Main Replacement (2013) -
The design contract was awarded at the City Council's July 16th meeting.
Design is anticipated to be complete and ready for bid by October. This
force main has broken 5 times in the past 6 years and is in need of
replacement. Construction of the replacement could begin as early as this
fall.
Highway 13 Trail Connection (20131 - The City did not receive the DNR
grant money we had applied for, but the City will be moving forward with
this trail construction this summer anyway. The trail will connect Riverside
Lane to Lilydale Road along the south side of Highway 13. Construction is
expected in October.
County Projects (construction year)
Lexington Avenue Crosswalk (2013) - The crosswalk and island at the
Victoria/ Lexington intersection is scheduled for installation in August.
Surveyors have marked the area and utilities have been located. Specific
schedules will be posted as they are planned.
Delaware Avenue Guardrails (2013) - Guardrails along both sides of
Delaware Avenue, between Highway 110 and Interstate 494 will be installed
this summer. Design of the guardrails has been completed. County
maintenance crews will be doing the installation and they are scheduled for
installation in August.