Loading...
Pipeline 07 26 2013N E W S The Pipeline LETTER Public Worksit o Engineering July 26, 2013 Code Enforcement Public Works The Parks weed whipped the weeds along the trails and the signs on the trails. Overhanging tree limbs were trimmed along the pedways. The concrete pads were cleaned at Mendakota Park around the baseball and softball benches. They finished repairs on the groundsmaster mower which had a broken arm U joint. They set up the baseball fields for the upcoming tournaments this weekend. Bases were moved to the right lengths. The Utilities Crew cleaned the sanitary sewer lines along Diane Road, Barbara Court, Nina Court, Adeline Court, Rae Court, and North and South Highview Circle. The Streets Crew cleaned up 17 tree stumps. The tree stumps were ground up, filled in with black dirt and grass seed was put down. The beaver dam was cleaned out of the storm outlet pipe on Pond Circle East. They trimmed trees because of sight distance problems at Bachelor Avenue and Dodd Road and at Colshire Lane. A pump was fixed on the bobcat broom. Engineering City Projects (construction yearl Dodd Road/Highway 110 Intersection Pedestrian Improvements (2013) - Construction is scheduled to begin next week, and is scheduled for completion by September 3rd. A portion of Interstate Valley Creek Trail northwest of the intersection will be relocated as part of the contract. Hunter Lane/Orchard Place Neighborhood Improvements (20131 - Curbing has been installed on Orchard Place through the curve to Hunter Lane. Utility construction on Hunter has begun. Paving activity is expected to begin on Orchard in the coming weeks. Rehabilitation work on Veronica, Orchard Circle, Culligan, and Glenhill is expected in late July/early August. Substantial completion is expected by the end of September with the assessment hearing in October. Crown Point & Overlook Neighborhood Rehabilitations (2013) - This project is substantially complete. Staff has been preparing the project punch -list, and the contractor will be repairing the punch list items in August. An assessment hearing is scheduled for October. Lexington Avenue Pedestrian Trail, Hwy 110 to Douglas Road (2013 - The trail has been re -paved, and pedestrian ramps installed. Punch -list items remain along with some minor landscape restoration. The trail has been re- opened. Sanitary Sewer Cleaning and Televising (2013 - This project is underway. The contractor will be working in the area of the city west of I -35E and north of Highway 110. Center Pointe Business Park is also included in the project. Minor traffic impacts should be anticipated. Mendota Heights Road Sanitary Sewer Force Main Replacement (2013) - The design contract was awarded at the City Council's July 16th meeting. Design is anticipated to be complete and ready for bid by October. This force main has broken 5 times in the past 6 years and is in need of replacement. Construction of the replacement could begin as early as this fall. Highway 13 Trail Connection (20131 - The City did not receive the DNR grant money we had applied for, but the City will be moving forward with this trail construction this summer anyway. The trail will connect Riverside Lane to Lilydale Road along the south side of Highway 13. Construction is expected in October. County Projects (construction year) Lexington Avenue Crosswalk (2013) - The crosswalk and island at the Victoria/ Lexington intersection is scheduled for installation in August. Surveyors have marked the area and utilities have been located. Specific schedules will be posted as they are planned. Delaware Avenue Guardrails (2013) - Guardrails along both sides of Delaware Avenue, between Highway 110 and Interstate 494 will be installed this summer. Design of the guardrails has been completed. County maintenance crews will be doing the installation and they are scheduled for installation in August.