Pipeline 07 12 2013NEWS '
The Pipeline
LETTER
Public Works
Engineering July 12, 2013
Code Enforcement
Public Works
The Parks Crew finished replacing the hydraulic tank on the Groundmaster. Newly
donated trees from the moms club were planted at Hagstrom King Park. Dead
trees were cut down at City Hall, Hagstrom King Park and Mendakota Park. The
brakes were replaced on the sweeper. Weeds were cut in the parks where
needed.
A bath towel and dental floss were removed from the pump float at the Lildyale lift
station. The Utilities Crew also cleaned the sanitary sewer lines along Eagle Ridge,
and the Eagle Ridge easements.
The Streets Crew did blacktop patching on Winston Court, Winston Circle,
Brompton Place, Sutcliff Circle, and Downing Street. They finished blacktop
patching in the seal coat area. A lot of glass was picked up at Creek and Dodd
Road. Fifteen bags of leaves were picked up on Lemay Lake Road that someone
had dumped.
Enaineerin
Citv Proiects (construction vear
Dodd Road/Highway 110 Intersection Pedestrian Improvements (20131 - A pre -
construction meeting is scheduled for July 12th, and a project schedule will be
published in the coming week. Construction is anticipated to begin on or about
August 1st, and is scheduled for completion by September 3rd. A portion of
Interstate Valley Creek Trail northwest of the intersection will be relocated as part
of the contract.
Hunter Lane/Orchard Place Neiahborhood Imarovements (2013) -Construction
activity continues on Orchard Place and construction is anticipated to begin on
Hunter Lane in the coming weeks. The stockpiles of material on Hunter and
Culligan will become the base for the new Orchard and Hunter. The stockpile on
Hunter should begin to move in the next couple of weeks. Rehabilitation work on
Veronica, Orchard Circle, Culligan, and Glenhill is expected in late July/early
August. Substantial completion is expected by the end of September with the
assessment hearing in October.
Crown Point & Overlook Neighborhood Rehabilitations (20131 - This project is
substantially complete. Staff will develop a punch list in the coming weeks, and
the contractor will be repairing the punch list items in August. An assessment
hearing is scheduled for October.
Lexington Avenue Pedestrian Trail, Hwy 110 to Douglas Road (2013) - The trail
has been re -paved, and pedestrian ramps installed. Punch -list items remain along
with some minor landscape restoration. The trail has been re -opened.
Sanitary Sewer Cleaning and Televising (2013) - Work is anticipated to begin next
week. The contractor will be working in the area of the city west of I -35E and
north of Highway 110. Center Pointe Business Park is also included in the project.
Minor traffic impacts should be anticipated.
Mendota Heights Road Sanitary Sewer Force Main Replacement (2013 - Staff
received two proposals from design firms for the design of the force main
replacement. Award of the design contract will be on the City Council's July 16th
meeting agenda. This force main has broken 5 times in the past 6 years and is in
need of replacement. Construction of the replacement could begin as early as this
fall.
Highway 13 Trail Connection (2013) - The City did not receive the DNR grant
money we had applied for, but the City will be moving forward with this trail
construction this summer anyway. The trail will connect Riverside Lane to Lilydale
Road along the south side of Highway 13. Construction is expected in September.
Countv Proiects (construction vear
Lexington Avenue Crosswalk (2013) - The crosswalk and island at the Victoria/
Lexington intersection is scheduled for installation in August. Surveyors have
marked the area and utilities have been located. Specific schedules will be posted
as they are planned.
Delaware Avenue Guardrails (2013) - Guardrails along both sides of Delaware
Avenue, between Highway 110 and Interstate 494 will be installed this summer.
County maintenance crews will be doing the installation and they are scheduled for
installation in July/August.
Dakota County Greenways Initiative - Dakota County is working on a County -wide
greenway initiative to provide trail routes throughout the County that are
separated from roadways. The Greenway Initiative Project Manager will be
attending a City Council workshop on July 16th to review the program with the City
Council. Details about the Initiative can be found
at: http://www.hkgi.com/projects/dakota/
or http://www.co.dakota.mn.us/Departments/OPA/Reports/GreenwayCollaborative
. htm