Loading...
Pipeline 06 28 2013N E W S The Pipeline LETTER Public Works Engineering Code Enforcement it June 28, 2013 Public Works The Parks Crew cleaned up downed trees and limbs in the parks and at the Par 3 from the storms. The sprinkler system was worked on at city hall. Sprinkler heads and lines were replaced where needed. The Utilities Crew was on vacation this week. Jake the summer help checked lift stations daily. The Streets Crew was called in Friday night after hours to remove two huge willow trees that were blocking Stanwich Lane. They were called in again Saturday night to remove a large pine tree that fell over and blocked the entire street on Lilac Lane. Most of the week was spent picking up tree limbs and cleaning up boulevard trees. They helped the Parks Crew at Ivy Falls Park, Wentworth Park and Valley Park with downed trees. A large tree was removed off the roof on the shelter at Valley Park. Weeds were cut in the ditch line along Victoria Road from Diane Road to Celia Road. Engineering City Projects (construction year) Dodd Road/Hiahwav 110 Intersection Pedestrian Improvements (2013) - Council awarded the bid at their June 18th meeting. Staff and the City's consultant will hold a preconstruction meeting in the coming weeks. Construction will begin shortly after the preconstruction meeting, and is scheduled for completion by September 3rd. Hunter Lane/Orchard Place Neighborhood Improvements (2013) - Construction is underway. Utility installations along Orchard Place are underway. The contractor is working on Orchard Place first, then Hunter Lane. Rehabilitation work on Veronica, Orchard Circle, Culligan, and Glenhill is expected in late July/early August. Substantial completion is expected by the end of September with the assessment hearing in October. Crown Point & Overlook Neighborhood Rehabilitations (2013D - Wear course pavement has been placed in both the Crown Point and Overlook neighborhoods. Utility manhole casting adjustments have been made and landscaping is complete. An assessment hearing is scheduled for October. Lexington Avenue Pedestrian Trail, Hwy 110 to Douglas Road (2013) - The trail has been re -paved, and pedestrian ramps installed. Landscape restoration is underway. Sanitary Sewer Cleaning and Televising (2013) - Council awarded the contract at their June 18th meeting. The contractor will be working in the area of the city west of I -35E and north of Highway 110. Center Pointe Business Park is also included in the project. Work should begin in the coming weeks. Interstate Valley Creek Trail Paving - The trail is now paved! County Projects (construction year) Lexington Avenue Crosswalk (2013) - The crosswalk and island at the Victoria/ Lexington intersection is scheduled for installation in August. Specific schedules will be posted as they are planned. Delaware Avenue Guardrails (2013) - Guardrails along both sides of Delaware Avenue, between Highway 110 and Interstate 494 will be installed this summer. County maintenance crews will be doing the installation and they are scheduled for installation in July/August. North Urban Regional Trail (NURT) Realignment (2014) - Design is underway for the new alignment of the NURT through the Henry Sibley High School property. Utilities have been located and surveyors have been on site most of the week. Design should be completed over the winter with construction anticipated in 2014. For more information, contact the County Project Manager, Chris Hartzel, at 952- 891-7106.