Loading...
Pipeline 06 14 2013NEWS LETTER Public Works Engineering Code Enforcement Public Works The Pipeline �� coll 7y c�171 I \�_ June 14, 2013 The Parks Crew trimmed low hanging tree limbs at Pilot Knob Road and Acacia Boulevard that were blocking the view of stop signs. Class 5 gravel was brought to the Pilot Knob site to fill in washouts along the trail. All mowers and trucks were cleaned and serviced. A flat tire was repaired on the ground -master and on the mower. The Utilities Crew painted fire hydrants in Friendly Hills, on Medallion Drive, and Centre Pointe Business Park. Broadleaf weeds were sprayed at Marie Park, Valley Park, and Victoria Highlands Park. The Streets Crew patched pavement on Mendakota Drive at Dodd Road, South Plaza Drive, Twin Circle Drive, Avanti Drive, Faro Lane, West Circle Court, Vail Drive, the fire station parking lot, and police department parking lot. Engineering City Projects (construction year) Dodd Road/Highway 110 Intersection Pedestrian Improvements (2013 - Bid opening took place on June 5th. Urban Companies out of Vadnais Heights was the apparent low bidder. Bid Award is anticipated to be before City Council at their June 18th City Council Meeting. Construction will begin shortly after contract award, and is scheduled for completion before September 3rd. Hunter Lane/Orchard Place Neighborhood Improvements (2013) - Construction is underway. Temporary water service has been established and utility installations are underway. The contractor is working on Orchard Place first, to be followed by Hunter Lane. Substantial completion is expected by the end of September with the assessment hearing in October. Crown Point & Overlook Neighborhood Rehabilitations (20131 - Base course pavement has been placed in both the Crown Point and Overlook neighborhoods. Utility manhole casting adjustments are being made, and wear course paving and touch-up landscaping will take place in the coming weeks. Substantial completion is expected by July. An assessment hearing is scheduled for October. Lexington Avenue Pedestrian Trail, Hwy 110 to Douglas Road (2013) - The trail has been re -paved. Landscape restoration is underway, and accessible pedestrian ramps have been installed. The trail remains closed during construction. Sanitary Sewer Cleaning and Televising (2013) - Bid opening took place on June 12th. Overline & Son, Inc. was the successful bidder. Contract award is anticipated at the June 18th Council meeting. Once bid is awarded the selected contractor will be working in the area of the city west of I -35E and north of Highway 110. Center Pointe Business Park is also included in the project. Interstate Valley Creek Trail Paving - Xcel Energy's contractor has been delayed due to weather in recent weeks, but they have begun preparing the trail for pavement. The trail will be closed during paving through next week. The trail pavement was removed for the installation of water service to the new Lilydale apartments. Pavement should be completed by June 21St, weather permitting. County Projects (construction year) North Urban Regional Trail (NURT) Realignment - Design is underway for the new alignment of the NURT through the Henry Sibley High School property. Utilities have been located and surveyors have been on site most of the week. Design should be completed over the winter with construction anticipated in 2014. For more information, contact the Dakota County Project Manager, Chris Hartzel, at 952-891-7106. Greenway Trails Master Plan - County planners will be meeting with City staff on June 25th to go over alternatives for greenway project alignments through Mendota Heights. The final master plan is scheduled to be before the County Board for adoption on July 30th Other Activities MN2050 - Staff attended a meeting of the MN2050 Board on Wednesday. MN2050 is an advocacy group made up of several professional organizations and municipal, county, and state officials whose mission is to promote the benefits of investment in infrastructure. The group is producing a series of documentaries in conjunction with Twin Cities Public Television (TPT) that will explain the everyday benefit properly constructed and maintained infrastructure has on quality of life. The first documentary is scheduled to air early in 2014. ISD197 Trucks and Transit - Public Works Staff participated in the annual Trucks & Transit event Wednesday evening at Henry Sibley High School. The street crew brought out new front-end loader for display and demonstration. The Fire Department also had one of their fire engines at the event.