Pipeline 06 07 2013NEWS
LETTER
Public Works
Engineering
Code Enforcement
Public Works
The Pipeline
June 7, 2013
The Parks Crew started up the sprinkler systems to check for broken lines. They
did set up for the 5K race and the parks celebration. The broken grass shoot on
the Xmark mower was repaired. They also repaired the broken spindle on the
mower at the Par 3.
The Utilities Crew assisted Engineering with planting a replacement tree on Wagon
Wheel Trail. The sanitary sewer lines were cleaned on Centre Pointe Drive.
Broadleaf weeds were sprayed at the Par 3, Kensington Park, Hagstrom King Park,
and Mendakota Park. The Mendota Heights Road lift station building was painted.
The Streets Crew finished repairing the sign on Mendota Heights Road at Visitation
School. All storm pipe inlets in the Copperfield area were opened up. The culverts
that run under Huber Drive were unplugged where beavers were building a dam.
Signs posts were picked up from Advantage Sign in Little Canada. They have
started pothole repairs.
Engineering
City Projects (construction year)
Dodd Road/Highway 110 Intersection Pedestrian Improvements (2013 - Bid
opening took place on Wednesday. Urban Companies out of Little Canada was the
apparent low bidder. Our consultant is going to verify the bids and will provide us
with the successful bidder once verified. Bid Award is anticipated to be before City
Council at their June 18th City Council Meeting. Construction will begin shortly
after contract award.
Hunter Lane/Orchard Place Neighborhood Improvements (2013) - Construction is
underway. Temporary water service has been established and utility installation is
underway. The contractor is working on Orchard Place first, to be followed by
Hunter Lane. Substantial completion is expected by the end of September with
the assessment hearing in October.
Crown Point & Overlook Neighborhood Rehabilitations (2013D - Base course
pavement has been placed in the Overlook neighborhood. Pavement of Crown
Point is underway. Wear course paving and touch-up landscaping will be in the
coming weeks. Substantial completion is expected by July. An assessment
hearing is scheduled for October.
Lexington Avenue Pedestrian Trail, Hwy 110 to Douglas Road (2013) - The trail
has been re -paved. Landscape restoration will take place at the same time as the
Crown Point and Overlook projects. The trail remains closed during construction.
Sanitary Sewer Cleaning and Televising (2013) - The project is being advertised.
Bid opening is scheduled for Wednesday of next week with anticipated contract
award at the June 18th Council meeting. Once bid is awarded the selected
contractor will be working in the area of the city west of I -35E and north of
Highway 110. Center Pointe Business Park is also included in the project.
Interstate Valley Creek Trail Paving - Xcel Energy's contractor was delayed slightly
due to weather, but they are beginning the paving process today. The trail will be
closed during paving through next week. The trail pavement was removed for the
installation of water service to the new Lilydale apartments. Pavement should be
completed by June 14th, weather permitting.
Countv Proiects (construction vear
Dakota County Capital Improvements Plan (CIP) - Dakota County is reviewing
their 2014-2018 Capital Improvement Program. The current 2013-2017 CIP is
available through the County web page for review
at http://www.co.dakota.mn.us/Government/BudgetFinance/2013Budget/Docume
nts/2013-2017CIP.pdf. Requests for County infrastructure projects to be included
in the CIP can be made through City Staff by Wednesday so Council can review
and submit requests to the County by the June 28th deadline.
Other Activities
Lower Mississippi River Watershed Management Organization (LMRWMO) - Staff
attended the monthly meeting of the LMRWMO on Thursday. The preliminary
2014 Budget was presented and discussed along with potential changes in
watershed administration. For more information about the LMRWMO, please go
to: httD://www.dakotaswcd.ora/watersheds/lowermisswmo/index.html.
Gun Club Lake Watershed Management Organization (GCLWMO) - Staff attended
a stakeholder meeting for the development of the GCLWMO Watershed
Management Plan. GCLWMO has struggled over the years to define valuable role
in stormwater management that does not interfere with the work the member
cities (Mendota Heights, Inver Grove Heights, and Eagan) do on a daily basis.
Much of the discussion surrounding the new management plan centered on
defining the role of the WMO. For more information about the GCLWMO, please go
to: httD://www.dakotaswcd.ora/wshd aclwmo.html.
Colshire Avenue Erosion - Staff met with residents on Colshire Avenue on
Thursday to discuss options for controlling erosion taking place off the edge of the
street pavement. In 2004, Colshire Avenue was reconstructed without curb and
gutter and the lack of runoff control is causing erosion behind the pavement
surface edge. Staff is working up cost estimates for potential solutions and will
present those estimates to the residents next week.