Pipeline 05 31 2013NEWS The Pipeline�
LETTER
Public Works
Engineering
Code Enforcement
Public Works
May 31, 2013
The Parks Crew cut grass, dragged fields and striped fields in the parks. They
started spraying the parks for weeds. Mendakota Park is being prepared for the
parks celebration.
The Utilities Crew sprayed Friendly Hills Park, Rogers Lake Park, City Hall, Fire
Hall, Hagstrom-King Park, and Mertensotto Field for broadleaf weeds. The float
was adjusted at the Veronica lift station. Lilydale's lift panel was painted.
1
The Streets Crew is finishing up mailbox repairs and sod repairs form the winter
plowing activities. Four new no parking signs were installed on Pueblo Lane. They
finished sweeping the streets and parking lots.
Engineering
City Projects (construction year)
Dodd Road/Hiahwav 110 Intersection Pedestrian Improvements (2013) - The
project is currently out for bid. Bid opening is scheduled for 10:OOam on
Wednesday of next week, and staff is anticipating a Bid Award to be before City
Council at their June 18th City Council Meeting. Construction will begin shortly
after contract award.
Hunter Lane/Orchard Place Neiahborhood Imarovements (2013) - Construction is
underway. Temporary water service has been established and pavement is being
reclaimed. Excavations for storm sewer are expected the week of June 17th.
Substantial completion is expected by the end of September with the assessment
hearing in October.
Crown Point & Overlook Neighborhood Rehabilitations (20131 - Pavement removal
is complete, and curb sections have been replaced. New pavement is anticipated
in early June. Substantial completion is expected by July. An assessment hearing
is scheduled for October.
Lexington Avenue Pedestrian Trail, Hwy 110 to Douglas Road (2013) - Trail
pavement has been reclaimed and new pavement is anticipated as soon as
weather permits. The trail remains closed during construction.
Highway 13 Trail Connection (2013) -The City has applied for a grant from the
Department of Natural Resources for construction funding. Staff should hear if the
application was successful sometime in June. If not funded through a grant, the
City intends to construct the connection in 2013 with City funds. Project will
connect existing trails between Riverside Lane and Lilydale Road.
Mendota Heights Road Sanitary Sewer Force Main Repairs (2013) - Staff will be
bidding for the design/build of the permanent repair to the force main. The force
main has ruptured 5 times in the past 6 years and is becoming more costly to
repair each time. Bidding schedule is yet to be determined.
Sanitary Sewer Cleaning and Televising (2013) - The project is being advertised.
Bid opening is scheduled for June 12th with anticipated contract award at the June
18th Council meeting. Once bid is awarded the selected contractor will be working
in the area of the city west of I -35E and north of Highway 110. Center Pointe
Business Park is also included in the project.
Street Preventative Maintenance (2013) - Annual crack sealing is complete.
Sealcoating will take place starting in July. For a list of streets impacted, please
go to the City's Street Improvement Plan on the City web page, City Services tab,
Engineering Projects link.
Highway 149 (Dodd Road) Trail Connections (2014) - Staff submitted grant
applications through the MnDOT Corridor Investment Management Strategy
(CIMS) program. These grants would fund construction of trail connections along
Dodd Road from Market Street to Marie Avenue and from Mendota Heights Road to
the I-494 Bridge. Both of these grants would be for the 2014 construction year,
and grant announcements are expected in June.
Interstate Valley Creek Trail Paving - Xcel Energy's contractor will be paving
Interstate Valley Creek Trail from Highway 13 south starting in early June. The
trail pavement was removed for the installation of water service to the new
Lilydale apartments. Pavement should be completed by June 7th, weather
permitting.
Countv Proiects (construction vear
Dakota County Capital Improvements Plan (CIP) - Dakota County is reviewing
their 2014-2018 Capital Improvement Program. The current 2013-2017 CIP is
available through the County web page for review
at http://www.co.dakota.mn.us/Government/BudgetFinance/2013Budget/Docume
nts/2013-2017CIP.pdf. Requests for County infrastructure projects to be included
in the CIP can be made through City Staff by June 12th so Council can review and
submit requests to the County by the June 28th deadline.
Dakota County Greenways Collaborative Open House - Dakota County is hosting
two open houses for public input about their proposed Greenways Plan. The
meetings are scheduled for Tuesday, May 28th in Lakeville and Thursday, May 30th
in Eagan. See the attached flyer for more information.
North Urban Regional Trail (NURT) Realignment/Greenway Study (2014) - Design
has begun on the Greenway realignment of the NURT. The new alignment will go
through Henry Sibley High School property from Mendota Road to Marie Avenue,
east of Warrior Drive, and then follow Marie Avenue to the Dodge Nature Center in
West Saint Paul. The NURT will cut through the Dodge Nature Center north of
Marie Avenue and connect with the existing NURT at Garlough Elementary School.
Design is expected to be complete this fall. For More information, please contact
the Dakota County Project Manager, Chris Hartzel, at 952-891-7106.
Lexington Avenue Crosswalk (2013) - Construction of the center median and
crosswalk on Lexington Avenue at Victoria will take place this summer.
Construction is anticipated in July/August.
Delaware Avenue Guardrails (2013) - Dakota County will be installing guardrails
along Delaware Avenue in select locations between Highway 110 and I-494.
Crews have surveyed the area, and installation should take place by August.
Other Activities
American Public Works Association (APWA) Conference Committee - Staff
attended the planning meeting for the APWA - Minnesota Chapter Fall Conference.
This year's conference theme is assessing, planning, and executing long-term
infrastructure plans. The fall conference is typically attended by over 400 Public
Works officials from around the State, and the Committee is responsible for lining
up topics and speakers for the event. The fall conference will be held on
November 20-21 at the Earle Brown Heritage Center in Brooklyn Center.
New Municipal Separated Sanitary and Storm Sewer (MS4) Permit - The new, draft
MS4 permit is out, and there are some new programs the City must complete in
order to be compliant with the new permit. Because of these changes, cities will
continue to be covered under the 2006 permit for the next several months. Once
cities address the new programs by December 29th, 2013, they will be converted
to the new (2013) permit. Some of the more significant changes include:
1. 100% Pond Inventory - Including a unique identifier, geographic
coordinates, and type of feature (pond, wetland, lake, man-made, etc.)
2. Prioritized Green Infrastructure for New Development - Includes Infiltration,
Low Impact Design, Runoff Recycling, Urban Forestation, etc.
3. Post -Construction Development Runoff - Must be less than or equal to pre -
project runoff conditions.
Staff will be working with Council and Commissions to revise existing programs
and policies to meet the requirements of the new permit.
Code Enforcement
Garbage & Recycling Containers - Did you know that Mendota Heights City Code
prohibits residential trash and recycling containers from being visible from the
public right-of-way or any adjacent property except when on the curb for pick-up?
These containers need to be either screened from view or stored inside. Check out
City Code Section 12-8-7 for more information, or call the City Code Enforcement
Division at 651-452-1850.