Pipeline 05 31 2013NEWS The Pipeline� LETTER Public Works Engineering Code Enforcement Public Works May 31, 2013 The Parks Crew cut grass, dragged fields and striped fields in the parks. They started spraying the parks for weeds. Mendakota Park is being prepared for the parks celebration. The Utilities Crew sprayed Friendly Hills Park, Rogers Lake Park, City Hall, Fire Hall, Hagstrom-King Park, and Mertensotto Field for broadleaf weeds. The float was adjusted at the Veronica lift station. Lilydale's lift panel was painted. 1 The Streets Crew is finishing up mailbox repairs and sod repairs form the winter plowing activities. Four new no parking signs were installed on Pueblo Lane. They finished sweeping the streets and parking lots. Engineering City Projects (construction year) Dodd Road/Hiahwav 110 Intersection Pedestrian Improvements (2013) - The project is currently out for bid. Bid opening is scheduled for 10:OOam on Wednesday of next week, and staff is anticipating a Bid Award to be before City Council at their June 18th City Council Meeting. Construction will begin shortly after contract award. Hunter Lane/Orchard Place Neiahborhood Imarovements (2013) - Construction is underway. Temporary water service has been established and pavement is being reclaimed. Excavations for storm sewer are expected the week of June 17th. Substantial completion is expected by the end of September with the assessment hearing in October. Crown Point & Overlook Neighborhood Rehabilitations (20131 - Pavement removal is complete, and curb sections have been replaced. New pavement is anticipated in early June. Substantial completion is expected by July. An assessment hearing is scheduled for October. Lexington Avenue Pedestrian Trail, Hwy 110 to Douglas Road (2013) - Trail pavement has been reclaimed and new pavement is anticipated as soon as weather permits. The trail remains closed during construction. Highway 13 Trail Connection (2013) -The City has applied for a grant from the Department of Natural Resources for construction funding. Staff should hear if the application was successful sometime in June. If not funded through a grant, the City intends to construct the connection in 2013 with City funds. Project will connect existing trails between Riverside Lane and Lilydale Road. Mendota Heights Road Sanitary Sewer Force Main Repairs (2013) - Staff will be bidding for the design/build of the permanent repair to the force main. The force main has ruptured 5 times in the past 6 years and is becoming more costly to repair each time. Bidding schedule is yet to be determined. Sanitary Sewer Cleaning and Televising (2013) - The project is being advertised. Bid opening is scheduled for June 12th with anticipated contract award at the June 18th Council meeting. Once bid is awarded the selected contractor will be working in the area of the city west of I -35E and north of Highway 110. Center Pointe Business Park is also included in the project. Street Preventative Maintenance (2013) - Annual crack sealing is complete. Sealcoating will take place starting in July. For a list of streets impacted, please go to the City's Street Improvement Plan on the City web page, City Services tab, Engineering Projects link. Highway 149 (Dodd Road) Trail Connections (2014) - Staff submitted grant applications through the MnDOT Corridor Investment Management Strategy (CIMS) program. These grants would fund construction of trail connections along Dodd Road from Market Street to Marie Avenue and from Mendota Heights Road to the I-494 Bridge. Both of these grants would be for the 2014 construction year, and grant announcements are expected in June. Interstate Valley Creek Trail Paving - Xcel Energy's contractor will be paving Interstate Valley Creek Trail from Highway 13 south starting in early June. The trail pavement was removed for the installation of water service to the new Lilydale apartments. Pavement should be completed by June 7th, weather permitting. Countv Proiects (construction vear Dakota County Capital Improvements Plan (CIP) - Dakota County is reviewing their 2014-2018 Capital Improvement Program. The current 2013-2017 CIP is available through the County web page for review at http://www.co.dakota.mn.us/Government/BudgetFinance/2013Budget/Docume nts/2013-2017CIP.pdf. Requests for County infrastructure projects to be included in the CIP can be made through City Staff by June 12th so Council can review and submit requests to the County by the June 28th deadline. Dakota County Greenways Collaborative Open House - Dakota County is hosting two open houses for public input about their proposed Greenways Plan. The meetings are scheduled for Tuesday, May 28th in Lakeville and Thursday, May 30th in Eagan. See the attached flyer for more information. North Urban Regional Trail (NURT) Realignment/Greenway Study (2014) - Design has begun on the Greenway realignment of the NURT. The new alignment will go through Henry Sibley High School property from Mendota Road to Marie Avenue, east of Warrior Drive, and then follow Marie Avenue to the Dodge Nature Center in West Saint Paul. The NURT will cut through the Dodge Nature Center north of Marie Avenue and connect with the existing NURT at Garlough Elementary School. Design is expected to be complete this fall. For More information, please contact the Dakota County Project Manager, Chris Hartzel, at 952-891-7106. Lexington Avenue Crosswalk (2013) - Construction of the center median and crosswalk on Lexington Avenue at Victoria will take place this summer. Construction is anticipated in July/August. Delaware Avenue Guardrails (2013) - Dakota County will be installing guardrails along Delaware Avenue in select locations between Highway 110 and I-494. Crews have surveyed the area, and installation should take place by August. Other Activities American Public Works Association (APWA) Conference Committee - Staff attended the planning meeting for the APWA - Minnesota Chapter Fall Conference. This year's conference theme is assessing, planning, and executing long-term infrastructure plans. The fall conference is typically attended by over 400 Public Works officials from around the State, and the Committee is responsible for lining up topics and speakers for the event. The fall conference will be held on November 20-21 at the Earle Brown Heritage Center in Brooklyn Center. New Municipal Separated Sanitary and Storm Sewer (MS4) Permit - The new, draft MS4 permit is out, and there are some new programs the City must complete in order to be compliant with the new permit. Because of these changes, cities will continue to be covered under the 2006 permit for the next several months. Once cities address the new programs by December 29th, 2013, they will be converted to the new (2013) permit. Some of the more significant changes include: 1. 100% Pond Inventory - Including a unique identifier, geographic coordinates, and type of feature (pond, wetland, lake, man-made, etc.) 2. Prioritized Green Infrastructure for New Development - Includes Infiltration, Low Impact Design, Runoff Recycling, Urban Forestation, etc. 3. Post -Construction Development Runoff - Must be less than or equal to pre - project runoff conditions. Staff will be working with Council and Commissions to revise existing programs and policies to meet the requirements of the new permit. Code Enforcement Garbage & Recycling Containers - Did you know that Mendota Heights City Code prohibits residential trash and recycling containers from being visible from the public right-of-way or any adjacent property except when on the curb for pick-up? These containers need to be either screened from view or stored inside. Check out City Code Section 12-8-7 for more information, or call the City Code Enforcement Division at 651-452-1850.