The Parks Crew applied crab grass preventative in the parks. All soccer goals were
anchored down. Downed tree limbs were picked up from the parks from the heavy
winds over the weekend. They finished striping the soccer fields.
The Utilities Crew checked the lift stations and exercised the portable generator.
The float was adjusted at the Veronica lift station. Mosquito control briquettes
were applied to the storm sewer sump manholes. He attended a safety meeting in
South Saint Paul. Lilydale's lift panel was painted again because of graffiti.
The Streets Crew continues to work on mailbox repair and sod damage. They
attended a safety meeting in South Saint Paul. The storm basin by the pond on
the tank farm was cleaned. Weather permitting they will start sweeping the
streets on Monday.
Engineering
The engineering department has hired two summer interns to assist with
the extensive amount of projects scheduled for the summer. Please
welcome Harry Tran and Sam Anderson to the city.
City Projects (construction yearl
Dodd Road/Highway 110 Intersection Pedestrian Improvements (2013 - The
project is currently out for bid. Bid opening is scheduled for 10:OOam on June 5th,
and staff is anticipating a Bid Award to be before City Council at their June 18th
City Council Meeting. Construction will begin shortly after contract award.
Hunter Lane/Orchard Place Neighborhood Improvements (2013) - Council
awarded the bid to Northdale Construction at their May 7th meeting. A
preconstruction meeting was held on Thursday, and construction is anticipated to
begin shortly after Memorial Day. St. Paul Water will begin stringing a temporary
water main system and Xcel will be installing new gas mains prior to the general
contractors work. Substantial completion is expected by the end of September
with the assessment hearing in October.
Crown Point & Overlook Neighborhood Rehabilitations (20131 - Construction is
proceeding quickly. All streets have been reclaimed and the contractor is installing
two catch basins on Crown Point Drive. Next week the curb that was marked will
be replaced. Substantial completion is expected by July. An assessment hearing
is scheduled for October.
Lexington Avenue Pedestrian Trail, Hwy 110 to Douglas Road (2013) - Asphalt
Surfaces Technologies will be completing this project as part of the Crown Point
and Overlook neighborhood contract. Dakota County is assisting with 55% of the
project construction costs. The City is covering the remaining 45%. Construction
is anticipated for the 22nd through 24th of May. The trail will be closed during
construction.
Highway 13 Trail Connection (2013) -The City has applied for a grant from the
Department of Natural Resources for construction funding. If not funded through
a grant, the City intends to construct the connection in 2013 with City funds. The
project will connect existing trails between Riverside Lane and Lilydale Road.
Mendota Heights Road Sanitary Sewer Force Main Repairs (2013) - Staff will be
sending out a Request for Proposals (RFP) for the design of the permanent repair
to the force main. The force main has ruptured 5 times in the past 6 years and is
becoming more costly to repair each time. Based on the information gathered by
the consultant specialist, the City may choose to repair the force main this year.
Sanitary Sewer Cleaning and Televising (2013) - Council approved the plans and
authorized advertisement for bids for the annual sewer maintenance project.
Once bid is awarded the selected contractor will be working in the area of the city
west of I -35E and north of Highway 110. The Center Pointe Business Park is also
included in this year's project.
Street Preventative Maintenance (2013) - The annual preventative maintenance
contract is now underway. In the coming weeks, crack sealing on several area
streets will take place. Later this summer sealcoating will occur. For a list of
streets impacted, please go to the City's Street Improvement Plan on the City web
page, City Services tab, and Engineering Projects link.
Highway 149 (Dodd Road) Trail Connections (2014) - Staff submitted grant
applications through the MnDOT Corridor Investment Management Strategy
(CIMS) program. These grants would be for construction of trail connections along
Dodd Road from Market Street to Marie Avenue and from Mendota Heights Road to
the I-494 Bridge. Both of these grants would be for the 2014 construction year.
County Projects (construction year)
Dakota County Capital Improvements Plan (CIP) - Dakota County is reviewing
their 2014-2018 Capital Improvement Program. The current 2013-2017 CIP is
available through the County web page for review
at http://www.co.dakota.mn.us/Government/BudgetFinance/2013Budget/Docume
nts/2013-2017CIP.pdf. Any requests for County infrastructure projects to be
included in the updated CIP can be made through City Staff by June 12th so
Council can review and submit requests to the County by the June 28th deadline.
North Urban Regional Trail (NURT) Realignment/Greenway Study (2014) - The
Dakota County Board of Commissioners approved a realignment of the NURT that
includes a "partial" alignment on the Henry Sibley property with a concurrence
from the ISD197 Board. The School Districts concurrence listed 6 conditions:
1. Minimize impacts to future school facility expansion
2. Minimize impact to school user groups
3. Minimize impact to mature trees
4. Provide safe driveway crossing east of Warrior Drive
5. Ensure continued operation of school's compost site
6. Develop a process to involve the School Board, School District, and public in
the final design of the trail.
Dakota County is selecting a consultant engineer to complete the final design in
accordance with these conditions. The east/west alignment previously selected
will go through the Dodge Nature Center north of Marie Avenue in West Saint Paul.
For More information, please contact the Dakota County Project Manager, Chris
Hartzel, at 952-891-7106.
Lexington Avenue Crosswalk (2013) - Construction of the center median and
crosswalk on Lexington Avenue at Victoria will take place this summer.
Construction is anticipated in July/August.
Delaware Avenue Guardrails (2013) - Dakota County will be installing guardrails
along Delaware Avenue in select locations between Highway 110 and I-494.
Crews will be surveying the locations in the coming weeks, and installation should
take place by August.