Loading...
Pipeline 05 17 2013NEWS LETTER Public Works Engineering Code Enforcement Public Works The Pipeline May 17, 2013 The Parks Crew applied crab grass preventative in the parks. All soccer goals were anchored down. Downed tree limbs were picked up from the parks from the heavy winds over the weekend. They finished striping the soccer fields. The Utilities Crew checked the lift stations and exercised the portable generator. The float was adjusted at the Veronica lift station. Mosquito control briquettes were applied to the storm sewer sump manholes. He attended a safety meeting in South Saint Paul. Lilydale's lift panel was painted again because of graffiti. The Streets Crew continues to work on mailbox repair and sod damage. They attended a safety meeting in South Saint Paul. The storm basin by the pond on the tank farm was cleaned. Weather permitting they will start sweeping the streets on Monday. Engineering The engineering department has hired two summer interns to assist with the extensive amount of projects scheduled for the summer. Please welcome Harry Tran and Sam Anderson to the city. City Projects (construction yearl Dodd Road/Highway 110 Intersection Pedestrian Improvements (2013 - The project is currently out for bid. Bid opening is scheduled for 10:OOam on June 5th, and staff is anticipating a Bid Award to be before City Council at their June 18th City Council Meeting. Construction will begin shortly after contract award. Hunter Lane/Orchard Place Neighborhood Improvements (2013) - Council awarded the bid to Northdale Construction at their May 7th meeting. A preconstruction meeting was held on Thursday, and construction is anticipated to begin shortly after Memorial Day. St. Paul Water will begin stringing a temporary water main system and Xcel will be installing new gas mains prior to the general contractors work. Substantial completion is expected by the end of September with the assessment hearing in October. Crown Point & Overlook Neighborhood Rehabilitations (20131 - Construction is proceeding quickly. All streets have been reclaimed and the contractor is installing two catch basins on Crown Point Drive. Next week the curb that was marked will be replaced. Substantial completion is expected by July. An assessment hearing is scheduled for October. Lexington Avenue Pedestrian Trail, Hwy 110 to Douglas Road (2013) - Asphalt Surfaces Technologies will be completing this project as part of the Crown Point and Overlook neighborhood contract. Dakota County is assisting with 55% of the project construction costs. The City is covering the remaining 45%. Construction is anticipated for the 22nd through 24th of May. The trail will be closed during construction. Highway 13 Trail Connection (2013) -The City has applied for a grant from the Department of Natural Resources for construction funding. If not funded through a grant, the City intends to construct the connection in 2013 with City funds. The project will connect existing trails between Riverside Lane and Lilydale Road. Mendota Heights Road Sanitary Sewer Force Main Repairs (2013) - Staff will be sending out a Request for Proposals (RFP) for the design of the permanent repair to the force main. The force main has ruptured 5 times in the past 6 years and is becoming more costly to repair each time. Based on the information gathered by the consultant specialist, the City may choose to repair the force main this year. Sanitary Sewer Cleaning and Televising (2013) - Council approved the plans and authorized advertisement for bids for the annual sewer maintenance project. Once bid is awarded the selected contractor will be working in the area of the city west of I -35E and north of Highway 110. The Center Pointe Business Park is also included in this year's project. Street Preventative Maintenance (2013) - The annual preventative maintenance contract is now underway. In the coming weeks, crack sealing on several area streets will take place. Later this summer sealcoating will occur. For a list of streets impacted, please go to the City's Street Improvement Plan on the City web page, City Services tab, and Engineering Projects link. Highway 149 (Dodd Road) Trail Connections (2014) - Staff submitted grant applications through the MnDOT Corridor Investment Management Strategy (CIMS) program. These grants would be for construction of trail connections along Dodd Road from Market Street to Marie Avenue and from Mendota Heights Road to the I-494 Bridge. Both of these grants would be for the 2014 construction year. County Projects (construction year) Dakota County Capital Improvements Plan (CIP) - Dakota County is reviewing their 2014-2018 Capital Improvement Program. The current 2013-2017 CIP is available through the County web page for review at http://www.co.dakota.mn.us/Government/BudgetFinance/2013Budget/Docume nts/2013-2017CIP.pdf. Any requests for County infrastructure projects to be included in the updated CIP can be made through City Staff by June 12th so Council can review and submit requests to the County by the June 28th deadline. North Urban Regional Trail (NURT) Realignment/Greenway Study (2014) - The Dakota County Board of Commissioners approved a realignment of the NURT that includes a "partial" alignment on the Henry Sibley property with a concurrence from the ISD197 Board. The School Districts concurrence listed 6 conditions: 1. Minimize impacts to future school facility expansion 2. Minimize impact to school user groups 3. Minimize impact to mature trees 4. Provide safe driveway crossing east of Warrior Drive 5. Ensure continued operation of school's compost site 6. Develop a process to involve the School Board, School District, and public in the final design of the trail. Dakota County is selecting a consultant engineer to complete the final design in accordance with these conditions. The east/west alignment previously selected will go through the Dodge Nature Center north of Marie Avenue in West Saint Paul. For More information, please contact the Dakota County Project Manager, Chris Hartzel, at 952-891-7106. Lexington Avenue Crosswalk (2013) - Construction of the center median and crosswalk on Lexington Avenue at Victoria will take place this summer. Construction is anticipated in July/August. Delaware Avenue Guardrails (2013) - Dakota County will be installing guardrails along Delaware Avenue in select locations between Highway 110 and I-494. Crews will be surveying the locations in the coming weeks, and installation should take place by August.