Loading...
Pipeline 03 15 2013NEWS LETTER Public Works Engineering Code Enforcement Public Works The ff . Pipeline March 15, 2013 The Parks Crew finished cleaning out the warming houses. The flooding hoses were removed and a shovel inventory was taken. The warming houses are also being prepared for painting the inside walls. The new John Deere mower was picked up. The sign for the baseball field at the Civic Center field was ordered. All trails were plowed. The Utilities Crew painted Lilydale's lift panel as it had been "tagged" a lot lately. He worked on the MSDS inventory. The Streets Crew had an early start on Monday morning after a dusting of snow. All streets were salted. They are opening up storm grates throughout the city. The Utilities Crew helped with the jetter to open up grates on Medallion Drive at Lexington Avenue and Fourth Avenue. Snow was cleared of the ditch line along Lexington Avenue so water could drain. Ice was cut under the 35E bridge on Marie Avenue. Welding was done on plow truck 303, bad bolts were replaced on the plow frame and the exhaust fixed. City streets were salted again on Thursday morning after receiving snow. Engineering City Projects (construction year) Dodd Road/Highway 110 Intersection Pedestrian Improvements (2013) - The City's consultant is getting ready to advertise the project for bid. We are anticipating a bid opening in May, with a contract award scheduled for the June 4th City Council Meeting. Construction will begin shortly after contract award. Hunter Lane/Orchard Place Neighborhood Improvements (20131 - Approval of the final plans and authorization to bid the project will be brought before Council at the March 19th meeting. The mixed curb type (barrier and surmountable) as directed by Council is being proposed by Hunter Lane being reconstructed with barrier style curb and Orchard Place being reconstructed with surmountable curb. Contract award is scheduled for the May7th City Council Meeting with construction beginning in June. Crown Point & Overlook Neighborhood Rehabilitations (2013) - Council approved the final plans and authorized advertisement for bid at their March 5th meeting. Bid opening is scheduled for 10:OOam on April 3rd, and contract award is scheduled to be before City Council at their April 16th meeting. Construction start is anticipated in May/June. In addition to the street rehabilitation work, the project bid will include trail rehabilitation on Lexington Avenue (see the next project) and preventative maintenance (sealcoating) in the Evergreen Knoll, Hidden Creek Trail, and the Bachelor/Stanwich neighborhoods. Lexington Avenue Pedestrian Trail, Hwy 110 to Douglas Road (2013 -Plans for rehabilitation (new pavement) of this trail will be included with the Crown Point & Overlook Neighborhood Rehabilitation Project for bid. Dakota County has included this in their Capital Improvement Plan (CIP) and will assist with project construction cost. Project includes pavement replacement, minor realignment, and pedestrian ramp replacement and/or new installation. Highway 13 Trail Connection (20131 - A trail connection is proposed along the south side of Highway 13 to connect the pedestrian trail from Riverside Lane to Lilydale Road. This will close one of the identified trail gaps in the City. The project may be delayed until 2014 if grant money can be obtained through MnDOT, DNR, or another source. If not funded through a grant in 2014, the City intends to construct the connection in 2013 with City funds. County Projects (construction year) North Urban Regional Trail (NURT) Realignment/Greenway Study (20141 - Dakota County presented NURT alignment alternatives to the Parks and Recreation Commission at their March 12th meeting. Comments from the Commission were supportive of the project concept, although Commissioners differed on their individual preferences for an alignment selection. The County will then make the same presentation to the City Council at their March 19th meeting. Dakota County expects to select their alignment alternative in April, with the project being presented to the Dakota County Board of Commissioners on April 16th. For more information, please contact the Dakota County Project Manager at 952-891-7106. Lexington Avenue Crosswalk (2013) - Staff received confirmation from Dakota County that the construction of the center median and crosswalk on Lexington Avenue at Victoria will take place this summer. The County will provide the City prior notice as to a construction schedule, but it is anticipated to be installed in July/August. State Projects (construction year) Highway 13 Reconstruction: Mendota to I -35E (2015) - MnDOT does not currently have funding allocated for this project. MnDOT staff is working on reprogramming the project for the 2015 construction year. City of Lilydale wrote a letter to MnDOT asking for restoration of the funding as soon as possible. Mendota Heights has also written MnDOT a letter supporting Lilydale's efforts. Other Activities Saint Paul Regional Water Service (SPRWS) Municipal Agreement - Staff met with the Director of SPRWS on Monday to begin the process of renewing the City's contractual agreement with the service for municipal water supply and distribution. The current contractual agreement expires in 2015, but this process traditionally takes a good amount of time. The next step will be for City staff to analyze costs and benefits of options for the future handling to the City's water distribution system. The group plans to meet again in about a month. Volunteer Opportunities Wetland Health Evaluation Program (WHEP) - Dakota County is seeking volunteers to assist with the program. The following is from the Dakota County press release about this year's program: Pull on a pair of waders, jump in and volunteer to help monitor wetlands in your community. Dakota County is seeking people to help monitor the health of community wetlands through the Wetland Health Evaluation Program (WHEP). Volunteers work with a community-based team to monitor and collect information that is used to help protect area wetlands. A science background or previous monitoring experience is not required. All training and equipment is provided. WHEP volunteers gather data on macroinvertebrates—like beetles and dragonflies—and plants in wetlands. Cities use the data to study wetland health trends to better manage wetlands and surrounding areas. Volunteers receive training in field methods, macroinvertebrate collection and identification, and plant survey techniques and identification. Teams work under the direction of a team leader and are grouped by city. Each city WHEP team takes samples from three to five wetlands between June and August. Volunteers commit between 10-30 hours, including training, field work and lab analysis. For more information about volunteering, visit www.mnwhep.org or call the Dakota County Environmental Resources Department at 952-891- 7000. Participating in the WHEP is an excellent way to learn about wetlands. Citizen Assisted Monitoring Program (CAMP) - The City of Mendota Heights participates in the CAMP each year in partnership with the Lower Mississippi River Watershed Management Organization (LMRWMO) and the Metropolitan Council. The CAMP evaluated water quality of metro area lakes. The City is in need of a volunteer or two to take samples on LeMay Lake. Once the samples are collected (approximately 8 times during the summer/fall), they are sent into the Met Council's lab for analysis. The LMRWMO reimburses the City for the cost of the lab analyses. If interested in volunteering for the CAMP, please contact Assistant City Engineer Ryan Ruzek at City Hall (651- 452-1850).