Pipeline 03 08 2013NEWS
LETTER
The Pipeline
Public Works
Engineering 4\-�&
Code Enforcement 34�� March 8, 2013
Public Works
The skating rinks closed on Sunday, March 3rd. The Parks Crew closed the
warming houses and started cleaning them out. They plowed the cul-de-
sacs and parking lots on Tuesday. The plow lights were repaired on truck
503. They continue to clean up the shop.
The Utilities Crew plowed the cul-de-sacs and lift stations on Tuesday. A
new eye wash station was installed at public works. A sanitary sewer
blockage was called in on Delaware Avenue. After checking the lines the
blockage was in the resident's line and the city's line was okay. A traffic
safety seminar was attended.
The Streets Crew had an early start on Tuesday morning. They plowed all
streets twice because of the nine inches of snow received. The front plow
cutting edge was changed on truck 308, and the bridge decks on Mendota
Heights Road, Wagon Wheel Trail, and Acacia Blvd were cleaned of snow.
Engineering
Citv Proiects (construction vear
Dodd Road/Highway 110 Intersection Pedestrian Improvements (2013) -
The City's consultant is getting ready to advertise the project for bid. We
are anticipating a bid opening in early May, with a contract award by June
1st. Construction will begin shortly after contract award.
Hunter Lane/Orchard Place Neighborhood Improvements (20131 - The
mixed curb type (barrier and surmountable) as directed by Council is being
proposed to be accomplished by Hunter Lane being reconstructed with
barrier style curb and Orchard Place being reconstructed with surmountable
curb. Approval of the final plans and authorization to bid the project will be
brought before Council at the March 19th meeting. Final plan completion
is expected in March with bidding and contract award in April/May and
construction starting in June.
Crown Point & Overlook Neighborhood Rehabilitations (2013) - Council
approved the final plans and authorized advertisement for bid at their March
5th meeting. Bid opening is scheduled for 10:OOam on April 3rd with
construction start anticipated in early summer. In addition to the street
rehabilitation work, the project bid will include trail rehabilitation on
Lexington Avenue (see the next project) and preventative maintenance
(sealcoating) in the Evergreen Knoll, Hidden Creek Trail, and the
Bachelor/Stanwich neighborhoods.
Lexington Avenue Pedestrian Trail, Hwy 110 to Douglas Road (2013 - Staff
is including plans for rehabilitation (new pavement) of this trail with the
Crown Point & Overlook Neighborhood Rehabilitation project bid. Dakota
County has included this in their Capital Improvement Plan (CIP) and will
assist with project construction cost. Project includes pavement
replacement, minor realignment, and pedestrian ramp replacement and/or
new installation.
Highway 13 Trail Connection (20131 - Staff is planning construction of a
trail connection along the south side of Highway 13 to connect the
pedestrian trail from Riverside Lane to Lilydale Road. This will close one of
the identified trail gaps in the City. The project may be delayed until 2014 if
grant money can be obtained through MnDOT, DNR, or another source. If
not funded through a grant in 2014, the City intends to construct the
connection in 2013 with City funds.
County Projects (construction year)
North Urban Regional Trail (NURT) Realignment and Greenway Study (2014)
Dakota County will be presenting NURT alignment alternatives to the Parks
and Recreation Commission at their March 12th meeting. The
realignment alternatives are between Warrior Drive and Mendota Road in
Mendota Heights and Garlough Environmental Magnet School in West Saint
Paul. One of the realignment alternatives being considered would route the
NURT through School District 197 property at Henry Sibley High School,
parallel to Warrior Drive from Mendota Road to the Delaware and Marie
Avenue intersection. Other alternatives include utilizing the existing
Delaware Avenue Trail and building a trail through the Dodge Nature
Center's property east of Delaware Avenue. The County will then make the
same presentation to City Council at their March 19th meeting. Dakota
County expects to select their alignment alternative in April.
Lexington Avenue Crosswalk (2013) - Staff received confirmation from
Dakota County that the construction of the center median and crosswalk on
Lexington Avenue at Victoria will take place this summer. The County will
provide the City prior notice as to a construction schedule, but it is
anticipated to be installed in July.
State Projects (construction year)
Highway 13 Reconstruction: Mendota to I -35E (2015) - At this time, the
MnDOT does not have funding allocated for this for the project, but MnDOT
staff is working to get the project programmed for the 2015 construction
year. The City of Lilydale had written a letter to MnDOT to formally ask for
the project funding to be reinstated as soon as possible. Mendota Heights
has also written MnDOT a letter supporting Lilydale's efforts.
Other Activities
Lower Mississippi River Watershed Management Organization (LMRWMO) -
Staff attended the monthly meeting of the LMRWMO Board on Thursday. An
update on the Watershed Restoration And Protection (WRAP) study was
given. The WRAP study is looking at area lakes and determining best
management practices to resolve existing impairments and prevent future
impairments to the water body. Rogers Lake and Lake Augusta are included
in the WRAP study. Also discussed was the bacteriological impairment of
Interstate Valley Creek and the next steps in addressing the impairment.
Minnesota Public Works Association (MPWA) Conference Committee - Staff
attended the final planning meeting for MPWA's spring conference. The
spring conference is focused on building leadership and teamwork within the
Public Works profession. The Conference is scheduled for May 8-10.
Maintenance of County Trails - Staff met with Dakota County maintenance
staff on Friday to begin negotiating revisions to our existing maintenance
agreement. Under the existing agreement, the City is responsible for
maintaining the portion of the North Urban Regional Trail (NURT) within the
City limits until the NURT corridor is complete and up to County standards.
The same agreement exists with West Saint Paul. The renegotiated
agreement may place the responsibility for maintenance of these trails with
Dakota County. More to come.....