Loading...
Pipeline 03 08 2013NEWS LETTER The Pipeline Public Works Engineering 4\-�& Code Enforcement 34�� March 8, 2013 Public Works The skating rinks closed on Sunday, March 3rd. The Parks Crew closed the warming houses and started cleaning them out. They plowed the cul-de- sacs and parking lots on Tuesday. The plow lights were repaired on truck 503. They continue to clean up the shop. The Utilities Crew plowed the cul-de-sacs and lift stations on Tuesday. A new eye wash station was installed at public works. A sanitary sewer blockage was called in on Delaware Avenue. After checking the lines the blockage was in the resident's line and the city's line was okay. A traffic safety seminar was attended. The Streets Crew had an early start on Tuesday morning. They plowed all streets twice because of the nine inches of snow received. The front plow cutting edge was changed on truck 308, and the bridge decks on Mendota Heights Road, Wagon Wheel Trail, and Acacia Blvd were cleaned of snow. Engineering Citv Proiects (construction vear Dodd Road/Highway 110 Intersection Pedestrian Improvements (2013) - The City's consultant is getting ready to advertise the project for bid. We are anticipating a bid opening in early May, with a contract award by June 1st. Construction will begin shortly after contract award. Hunter Lane/Orchard Place Neighborhood Improvements (20131 - The mixed curb type (barrier and surmountable) as directed by Council is being proposed to be accomplished by Hunter Lane being reconstructed with barrier style curb and Orchard Place being reconstructed with surmountable curb. Approval of the final plans and authorization to bid the project will be brought before Council at the March 19th meeting. Final plan completion is expected in March with bidding and contract award in April/May and construction starting in June. Crown Point & Overlook Neighborhood Rehabilitations (2013) - Council approved the final plans and authorized advertisement for bid at their March 5th meeting. Bid opening is scheduled for 10:OOam on April 3rd with construction start anticipated in early summer. In addition to the street rehabilitation work, the project bid will include trail rehabilitation on Lexington Avenue (see the next project) and preventative maintenance (sealcoating) in the Evergreen Knoll, Hidden Creek Trail, and the Bachelor/Stanwich neighborhoods. Lexington Avenue Pedestrian Trail, Hwy 110 to Douglas Road (2013 - Staff is including plans for rehabilitation (new pavement) of this trail with the Crown Point & Overlook Neighborhood Rehabilitation project bid. Dakota County has included this in their Capital Improvement Plan (CIP) and will assist with project construction cost. Project includes pavement replacement, minor realignment, and pedestrian ramp replacement and/or new installation. Highway 13 Trail Connection (20131 - Staff is planning construction of a trail connection along the south side of Highway 13 to connect the pedestrian trail from Riverside Lane to Lilydale Road. This will close one of the identified trail gaps in the City. The project may be delayed until 2014 if grant money can be obtained through MnDOT, DNR, or another source. If not funded through a grant in 2014, the City intends to construct the connection in 2013 with City funds. County Projects (construction year) North Urban Regional Trail (NURT) Realignment and Greenway Study (2014) Dakota County will be presenting NURT alignment alternatives to the Parks and Recreation Commission at their March 12th meeting. The realignment alternatives are between Warrior Drive and Mendota Road in Mendota Heights and Garlough Environmental Magnet School in West Saint Paul. One of the realignment alternatives being considered would route the NURT through School District 197 property at Henry Sibley High School, parallel to Warrior Drive from Mendota Road to the Delaware and Marie Avenue intersection. Other alternatives include utilizing the existing Delaware Avenue Trail and building a trail through the Dodge Nature Center's property east of Delaware Avenue. The County will then make the same presentation to City Council at their March 19th meeting. Dakota County expects to select their alignment alternative in April. Lexington Avenue Crosswalk (2013) - Staff received confirmation from Dakota County that the construction of the center median and crosswalk on Lexington Avenue at Victoria will take place this summer. The County will provide the City prior notice as to a construction schedule, but it is anticipated to be installed in July. State Projects (construction year) Highway 13 Reconstruction: Mendota to I -35E (2015) - At this time, the MnDOT does not have funding allocated for this for the project, but MnDOT staff is working to get the project programmed for the 2015 construction year. The City of Lilydale had written a letter to MnDOT to formally ask for the project funding to be reinstated as soon as possible. Mendota Heights has also written MnDOT a letter supporting Lilydale's efforts. Other Activities Lower Mississippi River Watershed Management Organization (LMRWMO) - Staff attended the monthly meeting of the LMRWMO Board on Thursday. An update on the Watershed Restoration And Protection (WRAP) study was given. The WRAP study is looking at area lakes and determining best management practices to resolve existing impairments and prevent future impairments to the water body. Rogers Lake and Lake Augusta are included in the WRAP study. Also discussed was the bacteriological impairment of Interstate Valley Creek and the next steps in addressing the impairment. Minnesota Public Works Association (MPWA) Conference Committee - Staff attended the final planning meeting for MPWA's spring conference. The spring conference is focused on building leadership and teamwork within the Public Works profession. The Conference is scheduled for May 8-10. Maintenance of County Trails - Staff met with Dakota County maintenance staff on Friday to begin negotiating revisions to our existing maintenance agreement. Under the existing agreement, the City is responsible for maintaining the portion of the North Urban Regional Trail (NURT) within the City limits until the NURT corridor is complete and up to County standards. The same agreement exists with West Saint Paul. The renegotiated agreement may place the responsibility for maintenance of these trails with Dakota County. More to come.....