Loading...
Pipeline 02 15 2013NEWS LETTER Public Works Engineering Code Enforcement Public Works The Pipeline February 15, 2013 WEZS-IG RITV=_. The Parks Crew plowed cul-de-sacs, ice rinks, parking lots and trails throughout the city twice this past week. Plow truck 503 was repaired. Flooding, sweeping, and snow blowing of ice rinks also continued. The Utilities Crew plowed and shoveled the cul-de-sacs. Degreasing bacteria was added to the wet well at the St. Thomas lift station. The Streets Crew had an early start on Sunday morning with the freezing rain that changed over to snow. All city streets were plowed, sanded, and salted. Truck 308 broke down Sunday evening and had to be towed. They had another early start on Monday morning and all streets were again plowed, sanded, and salted. All wings and sanders were greased on the plow trucks. Thursday morning was the third early start of the week and all city streets were plowed, sanded, and salted again. A bent wing was fixed on one of the plow trucks and the cutting and wing edges were replaced. Engineering City Projects (construction year) Dodd Road/Highway 110 Intersection Pedestrian Improvements (2013) - The final plans have been approved by City Council. Staff has completed all the paperwork for MnDOT approval of the plans. The issue of pedestrian safety markings and signage on the free -right turn from westbound 110 to northbound Dodd will be re -addressed by MnDOT during construction. Bidding is anticipated in April/May with construction beginning in late spring. Hunter Lane/Orchard Place Neighborhood Improvements (20131 -A second neighborhood informational meeting is scheduled for February 27th from 6:30pm to 8:OOpm at City Hall to go over specific property design issues with residents. Staff is designing the project in accordance with the parameters set by Council when the project was ordered last October. Final plan completion is expected in March with bidding and contract award in April/May and construction starting in June. Crown Point & Overlook Neighborhood Rehabilitations (2013) - Design plans are proceeding. Final plans are anticipated by April for a construction start during the summer. Lexington Avenue Pedestrian Trail, Hwy 110 to Douglas Road (2013) - Staff is preparing plans for rehabilitation of the trail. Construction is expected during 2013. Dakota County has included this in their Capital Improvement Plan (CIP) and will assist with project construction cost. Staff intends on including trail plans with the Crown Point & Overlook Neighborhood Rehabilitation project for bidding. Highway 13 Trail Connection (2013) - Staff is planning construction of a trail connection along the south side of Highway 13 to connect the pedestrian trail from Riverside Lane to Lilydale Road. This will close one of the identified trail gaps in the City. The project may be delayed until 2014 if MnDOT can include it for funding as part of their trail gap program for 2014 (Highway 13 is a State Right -of -Way). If not chosen for MnDOT funding in 2014, the City intends to construct the connection in 2013. County Projects North Urban Regional Trail (NURT) Realignment and Greenway Study - Staff has been working with Dakota County to review the alignment alternatives for the segment of the NURT between Warrior Drive and Mendota Road in Mendota Heights to north of Marie Avenue and Charlton Road in West Saint Paul. One of the alignment alternatives being considered would route the NURT through School District 197 property at Henry Sibley High School, parallel to Warrior Drive from Mendota Road to the Delaware and Marie Avenue intersection. Other alternatives include utilizing the existing Delaware Avenue Trail and building a trail through the Dodge Nature Center's property east of Delaware Avenue. The County will be presenting the alignment alternatives to the City Council at their March 19th meeting, and they expect to select their alignment alternative in April. State Projects (construction year) Highway 13 Reconstruction: Mendota to I -35E (2015) - MnDOT is developing the project scope for reconstructing the remaining section of Highway 13 through Lilydale. The project would rebuild the portion of the highway left out of last summer's resurfacing project from 2nd Street in Mendota to I -35E in Lilydale. The Lower Mississippi River Watershed Management Organization (LMRWMO) and the City of Lilydale have asked that additional storm water drainage be included in the project to help prevent or slow erosion to the Mississippi River bluff. Since this is an inter- jurisdictional drainage pattern, the LMRWMO performed a cost share calculation that divided the cost of the additional drainage work as 89% Lilydale and 11% Mendota Heights. Mendota Heights has $40,000 budgeted for the 2015 scheduled work, and since part of that drainage comes from the County Right -of -Way on Lexington Avenue, Dakota County has budgeted a portion of the Mendota Heights share in their CIP.