Pipeline 02 01 2013NEWS
LETTER
Public Works
Engineering
Code Enforcement
Public Works
The Pipeline
February 1, 2013
The Parks Crew broomed and flooded the hockey rinks as needed. They
plowed cul-de-sacs, parking lots, trails and ice rinks on Sunday/Monday. All
trucks were washed. Truck 503 was taken to the shop for frame repair.
The Utilities Crew cleaned grease of the floats at the Veronica lift station.
He plowed cul-de-sacs and lift station parking lots on Sunday/Monday. A
new hydrant flag was put on the hydrant at Dodd and Chippewa Avenue.
0
Engineering
The Streets Crew came in Sunday to salt the
city streets during the freezing rain and then
plowed all city streets after it snowed. They
plowed and salted all city streets again
Monday morning. Plow truck 312 started to
have a serious oil leak and it was taken out
of service. They are working on the truck.
There was freezing rain again Tuesday
morning and police called to report the
streets were almost impassable. Three
trucks went out and salted again. Truck 312
was back in service by the end of the day
Tuesday. Plow truck 304 broke through a
blacktop patch where there had been a water
main break on Cherry Hill Road. The spinner
bracket was bent along with other parts.
They are working on fixing the spinner on
304 along with other repairs.
City Projects (construction yearl
Dodd Road/Highway 110 Intersection Pedestrian Improvements (2013) -
The final plans were approved by City Council and staff was authorized to
seek bids for construction at the January 15th City Council meeting. Staff
has completed all the paperwork for MnDOT approval of the plans. The
issue of pedestrian safety markings and signage will be re -addressed by
MnDOT during and after construction of the project. Bidding is anticipated
in April/May with construction beginning in late spring.
Hunter Lane/Orchard Place Neighborhood Improvements (20131 -A second
neighborhood informational meeting is scheduled for February 27th from
6:30pm to 8:00pm at City Hall to go over specific property design issues
with residents. Design plans are proceeding in accordance with the
parameters set by City Council when the project was ordered last October.
Final plan completion is expected in March with bidding and contract award
in April/May and construction starting in June.
Crown Point & Overlook Neighborhood Rehabilitations (2013) - Design plans
are proceeding. Final plans are anticipated by April for a construction start
during the summer.
Lexington Avenue Pedestrian Trail, Hwy 110 to Douglas Avenue (2013) -
Staff is preparing plans for the rehabilitation for construction during 2013.
Dakota County has included this in their Capital Improvement Plan (CIP)
and will assist with project construction cost. Plans will be included with the
Crown Point & Overlook Neighborhood Rehabilitation project for bidding, and
construction is anticipated for the summer.
Highway 13 Trail Connection (20131 - Staff is planning construction of a
trail connection along the south side of Highway 13 to connect the
pedestrian trail from Riverside Lane to Lilydale Road. The project may be
delayed until 2014 if MnDOT can include it for funding as part of their trail
gap program for 2014 (Highway 13 is a State Right -of -Way). If not chosen
for MnDOT funding in 2014, the City intends to construct the connection in
2013. More information will be published about this project over the winter.
County Projects
North Urban Regional Trail (NURT) Realignment and Greenway Study - Staff
is working with Dakota County and their consultant on a study analyzing
potential realignment corridors for the NURT between Warrior Drive in
Mendota Heights and Charlton Avenue in West Saint Paul. One alternative
being looked at is connecting the NURT to Marie Avenue along Warrior Drive
on School District property. An Open House will be held on February 6th
at West Saint Paul City Hall from 5:00pm to 7:00pm to present alternatives
and gather public input.
Other Activities
Future Cities Competition - Staff attended the Future Cities Competition on
January 25th with three teams of students from Friendly Hills Middle School
(FHMS). The State competition, which is sponsored by the American
Society of Civil Engineers (ASCE), was held at the University of Minnesota
Science, Teaching, & Student Services Building. Students were asked to
plan a city of the future given specific criteria and problems to solve. This
year's theme is "Rethinking Runoff" and the teams are coming up with
innovative ways to improve surface water quality. All three teams from
FHMS finished in the top 10 of the 43 teams entered claiming 6th, 8th, and
10th place respectively. An excellent showing from District 197!
City Engineers Association of Minnesota (CEAM) Winter Conference - Staff
attended the annual CEAM Winter Conference on Wednesday and Thursday.
Many sessions in this year's conference were dedicated to preventative
maintenance, economic and financial forecasts, and developing young talent
within the engineering industry. Of particular interest was information on
routine and preventative maintenance of recreational trails. This is timely
as staff and the Parks & Recreation Commission are currently working on
completing the Trail Improvement and Management Plan (TIMP), which
should be presented to City Council later in the year.