Loading...
Pipeline 02 01 2013NEWS LETTER Public Works Engineering Code Enforcement Public Works The Pipeline February 1, 2013 The Parks Crew broomed and flooded the hockey rinks as needed. They plowed cul-de-sacs, parking lots, trails and ice rinks on Sunday/Monday. All trucks were washed. Truck 503 was taken to the shop for frame repair. The Utilities Crew cleaned grease of the floats at the Veronica lift station. He plowed cul-de-sacs and lift station parking lots on Sunday/Monday. A new hydrant flag was put on the hydrant at Dodd and Chippewa Avenue. 0 Engineering The Streets Crew came in Sunday to salt the city streets during the freezing rain and then plowed all city streets after it snowed. They plowed and salted all city streets again Monday morning. Plow truck 312 started to have a serious oil leak and it was taken out of service. They are working on the truck. There was freezing rain again Tuesday morning and police called to report the streets were almost impassable. Three trucks went out and salted again. Truck 312 was back in service by the end of the day Tuesday. Plow truck 304 broke through a blacktop patch where there had been a water main break on Cherry Hill Road. The spinner bracket was bent along with other parts. They are working on fixing the spinner on 304 along with other repairs. City Projects (construction yearl Dodd Road/Highway 110 Intersection Pedestrian Improvements (2013) - The final plans were approved by City Council and staff was authorized to seek bids for construction at the January 15th City Council meeting. Staff has completed all the paperwork for MnDOT approval of the plans. The issue of pedestrian safety markings and signage will be re -addressed by MnDOT during and after construction of the project. Bidding is anticipated in April/May with construction beginning in late spring. Hunter Lane/Orchard Place Neighborhood Improvements (20131 -A second neighborhood informational meeting is scheduled for February 27th from 6:30pm to 8:00pm at City Hall to go over specific property design issues with residents. Design plans are proceeding in accordance with the parameters set by City Council when the project was ordered last October. Final plan completion is expected in March with bidding and contract award in April/May and construction starting in June. Crown Point & Overlook Neighborhood Rehabilitations (2013) - Design plans are proceeding. Final plans are anticipated by April for a construction start during the summer. Lexington Avenue Pedestrian Trail, Hwy 110 to Douglas Avenue (2013) - Staff is preparing plans for the rehabilitation for construction during 2013. Dakota County has included this in their Capital Improvement Plan (CIP) and will assist with project construction cost. Plans will be included with the Crown Point & Overlook Neighborhood Rehabilitation project for bidding, and construction is anticipated for the summer. Highway 13 Trail Connection (20131 - Staff is planning construction of a trail connection along the south side of Highway 13 to connect the pedestrian trail from Riverside Lane to Lilydale Road. The project may be delayed until 2014 if MnDOT can include it for funding as part of their trail gap program for 2014 (Highway 13 is a State Right -of -Way). If not chosen for MnDOT funding in 2014, the City intends to construct the connection in 2013. More information will be published about this project over the winter. County Projects North Urban Regional Trail (NURT) Realignment and Greenway Study - Staff is working with Dakota County and their consultant on a study analyzing potential realignment corridors for the NURT between Warrior Drive in Mendota Heights and Charlton Avenue in West Saint Paul. One alternative being looked at is connecting the NURT to Marie Avenue along Warrior Drive on School District property. An Open House will be held on February 6th at West Saint Paul City Hall from 5:00pm to 7:00pm to present alternatives and gather public input. Other Activities Future Cities Competition - Staff attended the Future Cities Competition on January 25th with three teams of students from Friendly Hills Middle School (FHMS). The State competition, which is sponsored by the American Society of Civil Engineers (ASCE), was held at the University of Minnesota Science, Teaching, & Student Services Building. Students were asked to plan a city of the future given specific criteria and problems to solve. This year's theme is "Rethinking Runoff" and the teams are coming up with innovative ways to improve surface water quality. All three teams from FHMS finished in the top 10 of the 43 teams entered claiming 6th, 8th, and 10th place respectively. An excellent showing from District 197! City Engineers Association of Minnesota (CEAM) Winter Conference - Staff attended the annual CEAM Winter Conference on Wednesday and Thursday. Many sessions in this year's conference were dedicated to preventative maintenance, economic and financial forecasts, and developing young talent within the engineering industry. Of particular interest was information on routine and preventative maintenance of recreational trails. This is timely as staff and the Parks & Recreation Commission are currently working on completing the Trail Improvement and Management Plan (TIMP), which should be presented to City Council later in the year.