Loading...
Pipeline 01 25 2013NEWS LETTER Public Works Engineering Code Enforcement Public Works The Pipeline January 25, 2013 The Parks Crew did the daily sweeping and flooding of the ice rinks. Repair work was done on the snow blower, and they attended a turf grass seminar. The Utilities Crew attended the Collection System Operators Conference. Topics included inflow, infiltration, storm water, pump maintenance, lift stations and sanitary sewer cleaning, lining, and televising. The Streets Crew came in early last Friday because of the light snow. All streets were salted. The plow trucks were washed and the sanders greased. All streets were again salted on Wednesday morning. Plow truck 303 was taken to the shop to troubleshoot an electrical problem. Engineering City Projects (construction year) Dodd Road/Highway 110 Intersection Pedestrian Improvements (2013) - The consultant provided the City Council with an update and review of the final design plans at the January 15th City Council meeting. The final plans were approved by City Council and staff was authorized to seek bids for construction. Staff is working with MnDOT officials on the issue of a marked crosswalk at the northeast corner of the intersection crossing the "free right turn" from Highway 110 to Dodd Road. Staff will work this issue with State officials between now and bidding the project. Construction is anticipated in spring of 2013. Hunter Lane/Orchard Place Neighborhood Improvements (20131 -A second neighborhood informational meeting is tentatively scheduled for February 27th from 6:30pm to 8:OOpm at City Hall to go over specific property design issues with residents. Design plans are proceeding in accordance with the parameters set by City Council when the project was ordered last October. Final plan completion is expected in March with bidding and contract award in April/May and construction starting in June. Crown Point & Overlook Neighborhood Rehabilitations (2013) - Design plans are proceeding. Final plans are anticipated by April for 2013 construction. Lexington Avenue Pedestrian Trail, Hwy 110 to Douglas Avenue (2013) - Staff is preparing plans for the rehabilitation for construction during 2013. Dakota County has included this in their Capital Improvement Plan (CIP) and will assist with project cost. Plans will be included with the Crown Point & Overlook Neighborhood Rehabilitation project for bidding, and construction is anticipated for the summer. Highway 13 Trail Connection (20131 - Staff is planning construction of a trail connection along the south side of Highway 13 to connect the pedestrian trail from Riverside Lane to Lilydale Road. The project may be delayed until 2014 if MnDOT can include it for funding as part of their trail gap program for 2014 (Highway 13 is a State Right -of -Way). If not chosen for MnDOT funding in 2014, the City intends to construct the connection in 2013. More information will be published about this project over the winter. County Projects North Urban Regional Trail (NURT) Realignment and Greenway Study - Staff is working with Dakota County and their consultant on a study analyzing potential realignment corridors for the NURT between Warrior Drive in Mendota Heights and Charlton Avenue in West Saint Paul. One alternative being looked at is connecting the NURT to Marie Avenue along Warrior Drive on School District property. An Open House is scheduled for February 6t" at West Saint Paul City Hall to present alternatives and gather public input. Other Activities Future Cities Competition - Staff attended the Future Cities Competition on Saturday with three teams of students from Friendly Hills Middle School (FHMS). The State competition, which is sponsored by the American Society of Civil Engineers (ASCE), was held at the University of Minnesota Science, Teaching, & Student Services Building. Students were asked to plan a city of the future given specific criteria and problems to solve. This year's theme is "Rethinking Runoff" and the teams are coming up with innovative ways to improve surface water quality. Final scoring will be released in the coming weeks, and although none of the three teams from FHMS won the competition, all three did extremely well and are expected to have finished near the top of 43 teams entered. Robert Street Transitway Steering Committee - Staff briefly attended the Steering Committee meeting on Thursday. No issues directly affecting Mendota Heights were discussed, but the West Saint Paul designated improvements remain on schedule for 2014 construction.