The Parks Crew did the daily sweeping and flooding of the ice rinks. Repair
work was done on the snow blower, and they attended a turf grass seminar.
The Utilities Crew attended the Collection System Operators Conference.
Topics included inflow, infiltration, storm water, pump maintenance, lift
stations and sanitary sewer cleaning, lining, and televising.
The Streets Crew came in early last Friday because of the light snow. All
streets were salted. The plow trucks were washed and the sanders greased.
All streets were again salted on Wednesday morning. Plow truck 303 was
taken to the shop to troubleshoot an electrical problem.
Engineering
City Projects (construction year)
Dodd Road/Highway 110 Intersection Pedestrian Improvements (2013) -
The consultant provided the City Council with an update and review of the
final design plans at the January 15th City Council meeting. The final plans
were approved by City Council and staff was authorized to seek bids for
construction. Staff is working with MnDOT officials on the issue of a marked
crosswalk at the northeast corner of the intersection crossing the "free right
turn" from Highway 110 to Dodd Road. Staff will work this issue with State
officials between now and bidding the project. Construction is anticipated in
spring of 2013.
Hunter Lane/Orchard Place Neighborhood Improvements (20131 -A second
neighborhood informational meeting is tentatively scheduled for February
27th from 6:30pm to 8:OOpm at City Hall to go over specific property design
issues with residents. Design plans are proceeding in accordance with the
parameters set by City Council when the project was ordered last October.
Final plan completion is expected in March with bidding and contract award
in April/May and construction starting in June.
Crown Point & Overlook Neighborhood Rehabilitations (2013) - Design plans
are proceeding. Final plans are anticipated by April for 2013 construction.
Lexington Avenue Pedestrian Trail, Hwy 110 to Douglas Avenue (2013) -
Staff is preparing plans for the rehabilitation for construction during 2013.
Dakota County has included this in their Capital Improvement Plan (CIP)
and will assist with project cost. Plans will be included with the Crown Point
& Overlook Neighborhood Rehabilitation project for bidding, and
construction is anticipated for the summer.
Highway 13 Trail Connection (20131 - Staff is planning construction of a
trail connection along the south side of Highway 13 to connect the
pedestrian trail from Riverside Lane to Lilydale Road. The project may be
delayed until 2014 if MnDOT can include it for funding as part of their trail
gap program for 2014 (Highway 13 is a State Right -of -Way). If not chosen
for MnDOT funding in 2014, the City intends to construct the connection in
2013. More information will be published about this project over the winter.
County Projects
North Urban Regional Trail (NURT) Realignment and Greenway Study - Staff
is working with Dakota County and their consultant on a study analyzing
potential realignment corridors for the NURT between Warrior Drive in
Mendota Heights and Charlton Avenue in West Saint Paul. One alternative
being looked at is connecting the NURT to Marie Avenue along Warrior Drive
on School District property. An Open House is scheduled for February 6t" at
West Saint Paul City Hall to present alternatives and gather public input.
Other Activities
Future Cities Competition - Staff attended the Future Cities Competition on
Saturday with three teams of students from Friendly Hills Middle School
(FHMS). The State competition, which is sponsored by the American
Society of Civil Engineers (ASCE), was held at the University of Minnesota
Science, Teaching, & Student Services Building. Students were asked to
plan a city of the future given specific criteria and problems to solve. This
year's theme is "Rethinking Runoff" and the teams are coming up with
innovative ways to improve surface water quality. Final scoring will be
released in the coming weeks, and although none of the three teams from
FHMS won the competition, all three did extremely well and are expected to
have finished near the top of 43 teams entered.
Robert Street Transitway Steering Committee - Staff briefly attended the
Steering Committee meeting on Thursday. No issues directly affecting
Mendota Heights were discussed, but the West Saint Paul designated
improvements remain on schedule for 2014 construction.