Loading...
Pipeline 01 04 2013NEWS LETTER Public Works Engineering Code Enforcement Public Works The Pipeline January 4, 2013 �-Isw t I(/ The Parks Crew continues to flood ice rinks in the parks. Flooding fittings were repaired and trails were salted at Wentworth Park near the fire hydrants. Cul-de-sacs, parking lots, trails and ice rinks were plowed. The Utilities Crew installed a new float relay at the Culligan Lane lift station and assisted with plowing and salting the streets. The Streets Crew cleaned off bridge decks on Wagon Wheel Trail and Mendota Heights Road, plowed/salted main streets, and salted neighborhood streets. They also picked up supplies to repair mailboxes. Engineering City Projects (construction year) Dodd Road/Highway 110 Intersection Pedestrian Improvements (2013) - The consultant will be providing the City Council with an update and review of the final design plans at the January 15th City Council meeting. Final plans are anticipated over the winter with bidding and construction in 2013. Hunter Lane/Orchard Place Neighborhood Improvements (20131 -A second neighborhood informational meeting is tentatively scheduled for February 27th to go over specific property design issues with residents. Design plans are proceeding in accordance with the parameters set by City Council when the project was ordered last October. Final plan completion is expected in late winter/early spring with construction starting in June 2013. Crown Point & Overlook Neighborhood Rehabilitations (2013) - Design plans are proceeding. Final plans are anticipated by spring for 2013 construction. Lexington Avenue Pedestrian Trail, Hwy 110 to Douglas Avenue (2013) - Staff is preparing plans for the rehabilitation for construction during 2013. Dakota County has included this in their Capital Improvement Plan (CIP) and will assist with project cost. Plans will be included with the Crown Point & Overlook Neighborhood Rehabilitation project for bidding. Highway 13 Trail Connection (20131 - Staff is planning construction of a trail connection along the south side of Highway 13 to connect the pedestrian trail from Riverside Lane to Lilydale Road. The project may be delayed until 2014 if MnDOT can include it for funding as part of their trail gap program for 2014 (Highway 13 is a State Right -of -Way). If not chosen for MnDOT funding in 2014, the City intends to construct the connection in 2013. More information will be published about this project over the winter. County Projects North Urban Regional Trail (NURT) Realignment and Greenway Study - Staff is working with Dakota County and their consultant on a study analyzing potential realignment corridors for the NURT between Warrior Drive in Mendota Heights and Charlton Avenue in West Saint Paul. The NURT is currently located along the north side of Highway 110, and there are a number of realignment alternatives being looked at to connect the NURT to the northeast corner of Charlton and Marie in West Satin Paul. One alternative being looked at is connecting the NURT to Marie Avenue along Warrior Drive. A public Open House is scheduled for February 6th at the West Saint Paul City Hall to present alternatives and gather public input. State Projects Highway 149 (Dodd Road) Rehabilitation & I-494 Ramp Improvements - Dodd Road is proposed for reconstruction by the City of Eagan south of I- 494 in 2014. This project will impact traffic for Mendota Heights during construction. Reconstruction of the north interchange ramp is scheduled for reconstruction by MnDOT, also in 2014 under a separate project. This project may include a revised signal and turn lane pattern for the interchange. Rehabilitation of Dodd Road from I-494 to 7th Street in Saint Paul is planned for 2015 reconstruction by MnDOT. All these projects are in the preliminary stages of design. More information will be shared as the designs progress. Other Activities Future Cities Competition - Staff has been working with Friendly Hills Middle School (FHMS) students on their entries in the annual Future Cities Competition. Students are asked to plan a city of the future given specific criteria and problems to solve. This year's theme is "Rethinking Runoff" and the teams are coming up with innovative ways to improve surface water quality. FHMS is entering three teams into the competition which will be judged on January 19th from 7:30 to 4:00 at the University of Minnesota Science, Teaching, & Student Services Building. FHMS has won awards in past competitions and it is expected that at least one team from the school will be selected as a finalist.