Loading...
Pipeline 09 24 2010 Public Works The Parks Crew removed a fallen tree on the pedway in north Valley Park. They repaired a wall in the women’s restroom at Mendakota Park. Trees were trimmed at the fire hall and the branches were hauled away. Rich cleaned and vacuumed the Mendota Heights Road lift station and the sanitary sewer line was cleaned of grease. Pipe Services cleaned and vacuumed the St. Thomas lift station. A new hour meter was put in at the St. Thomas lift station for pump two. Rootx was applied in the sanitary sewer line on Lexington Avenue, Marie Avenue, and William Court. Rich picked up dumped tires on Glen Hill Road. He helped the Streets Crew clean the catch basins on Marie Avenue, Maple Park Drive, Sylvandale Road, First Avenue and Trail Road. The Streets Crew cleaned leaves along the curb line with the tractor on Marie Avenue from the 35E bridge to Dodd Road and along Valley Curve. Tim and Cliff worked on the starter on truck 303. They cleaned storm grates. Blacktopping was done to pot holes and man holes rings on Victoria Curve, Glen Hill Road, Culligan Lane, Hunter Lane, Chippewa Avenue and Eagle Ridge. Engineering