Loading...
Pipeline 06 04 2010L E T T E R Public Works Engineering Code Enforcement Public Works June 41 2010 The Parks Crew picked repaired sprinkler heads at Kensington and Mendakota Parks. Dead trees were cut and removed at the public works garage. Preparation for the Park celebration is ongoing. Trash was collected from parks, cut grass, striped fields and dragged and chalked baseball diamonds. Rich checked all lift stations, cleaned sewers on Claremont Dr, Bedford Ct., Whitfield Dr. and Stockbridge Rd. A tree was replaced on Callahan PI per direction from engineering. New manholes were inspected on John Street and at Mendota Plaza. The Streets Crew cut up and hauled away tree tops that were broken off in Wentworth Park. Mike from streets assisted the Parks crew in collecting trash and cutting grass for the park celebration. Black topping, pot hole filling and cross walk striping were completed on Huber Drive and Mendota Heights Road, and Knollwood Lane was patched. A driveway at 682 Woodridge was also patched as part of a past reconstruction project. Engineering Mendota Heights Road Roundabout - A preconstruction meeting was held on Tuesday. Road closed signs will be placed on Monday June 7th and the project is scheduled to start on June 14th 2010 Reconstruction - Storm sewer and Sanitary sewer installations occurred during the week. Xcel energy is replacing the gas causing the city contractor to be delayed in starting their work. Rain on Friday morning made a mess on John Street causing a city fire truck to become stuck. Public works assisted in safely pulling the stuck vehicle through the mud. Water Tower Rehabilitation - The contractor has made great progress in the rehabilitation of the city water tower. St. Paul water is requesting additional safety devices on the tower which will be causing the contractor some delay and reworking of some areas. SPRWS will bear the costs of the changes. Highway 55/Mendota Heights Road - MnDOT comments have been received and the project is nearly ready to be let for bids. The city still needs to acquire right of way -from one commercial propqrty....