Loading...
Pipeline 12 17 2010FNI E W S LETT E R Public Works Engineering Code Enforcement une Pipelione December 17, 2010 g "n 10 Z" M, The Streets Crew plowed and salted all city streets after a seventeen -inch snowfall on Saturday. The crews worked constantly throughout the storm to keep City streets open during the storm. By the time crews were finished on Sunday morning, they had plowed all 70 miles of City streets at least 3 times! Some streets with larger traffic volumes were actually plowed 4 times in one day! Once the streets were clear, and after a much deserved rest on Sunday, crews were back at work on Monday morning cleaning up snow piles from the weekend plowing, and addressing resident complaints/issues. The most common items called in from residents were regarding mailboxes, and crews were out this week looking at damage from plows and/or snow plumes from the plows. They also began digging out fire hydrants, and plowing the trail network. A wheel loader was rented to help the crews remove large snow piles around the City. Parks crew began clearing the ice rinks today. Once cleared, the rinks will be re -flooded to provide a fresh layer of ice. Parks crew will also be touching up snow clearance in parking lots at the City parks Lower Mississippi River Watershed Management Organization (LMRWMO) - Staff attended the monthly meeting of the LMRWMO on Thursday (11/16) at Lilydale City Hall. The LMRWMO is in the process of updating their 10 -year management plan for the watershed, so much of the discussion centered around the plan updates. Once completed, it will be presented to City Council, and the City's Surface Water Management Plan will need to be revised to reflect changes in LMRWMO policies and goals. The LMRWMO is anticipating the updated plan to be completed by May 2011. Future Cities Competition - Public Works Director Mazzitello and Assistant to the City Administrator Jake Sedlacek have been working with students at Friendly Hills Middle School on their projects for entry in the annual Future Cities Competition. The teams from Friendly Hills have completed their computer models using the popular SimCity software, and they are putting the finishing touches on their city narratives and product research essays. The next phase of the competition will require the teams to build scale models of the cities they described in their narratives. More information about the Future Cities competition can be found at the Success Beyond the Classroom webpage www.successbeyond.org. Highway 13/I -35E Interchange Drainage Improvements - Staff attended the Lilydale City Council meeting on Monday afternoon to hear a presentation from the Minnesota Department of Transportation (MnDOT) on their proposed project along Highway 13. MnDOT is proposing a three -phased project to reconstruct Highway 13 from Lilydale Road (County Road 45) to approximately the Post Office site in Mendota. Once complete, issues of stormwater drainage form the City of Mendota Heights into the City of Lilydale should be addressed. The proposed phases are: Phase I - Install traffic signals at the I -35E entrance and exit ramps along Highway 13; connect sidewalk/trail in front of Holiday store; provide Americans with Disabilities Act complaint crosswalks at entrance/exit ramp intersections. This work is scheduled for 2011. Phase 11 - Reconstruct Highway 13 from the City of Mendota to approximately the site of the new Italian architecture villas in Lilydale. Reconstruction would consist of new road base, new pavement, curb & gutter., and storm sewer pipes. This work is scheduled for 2012. Phase III - Reconstruct Highway 13 from the new Italian architecture villas in Lilydale to the 1-35E entrance/exit ramp intersection near the Holiday and BP stores. Reconstruction would consist of new road base,, new pavement, curb & gutter, and storm sewer pipes. This work is estimated to be under construction in 2015. Water Main Breaks - There were a number of water main breaks this week, and Engineering staff had to work quickly with Saint Paul Regional Water Service (SPRWS) to identify the precise locations and severity of each break. Through a quick response by staff, and excellent cooperation from SPRWS, the leaks were identified and repaired quickly. Wagon Wheel Reconstruction & Area Rehabilitation (2011 Streets Project) - Staff is beginning to design the 2011 Project. Staff anticipated having a set of 65% complete drawings by early spring. Once staff gets to that point in the design, we intend to hold another neighborhood meeting to go over design details with residents. Project construction is anticipated to begin in June 2011.