The Streets Crew plowed and salted all city streets after a seventeen -inch
snowfall on Saturday. The crews worked constantly throughout the storm
to keep City streets open during the storm. By the time crews were finished
on Sunday morning, they had plowed all 70 miles of City streets at least 3
times! Some streets with larger traffic volumes were actually plowed 4
times in one day!
Once the streets were clear, and after a much deserved rest on Sunday,
crews were back at work on Monday morning cleaning up snow piles from
the weekend plowing, and addressing resident complaints/issues. The most
common items called in from residents were regarding mailboxes, and crews
were out this week looking at damage from plows and/or snow plumes from
the plows. They also began digging out fire hydrants, and plowing the trail
network. A wheel loader was rented to help the crews remove large snow
piles around the City.
Parks crew began clearing the ice rinks today. Once cleared, the rinks will
be re -flooded to provide a fresh layer of ice. Parks crew will also be
touching up snow clearance in parking lots at the City parks
Lower Mississippi River Watershed Management Organization (LMRWMO) -
Staff attended the monthly meeting of the LMRWMO on Thursday (11/16) at
Lilydale City Hall. The LMRWMO is in the process of updating their 10 -year
management plan for the watershed, so much of the discussion centered
around the plan updates. Once completed, it will be presented to City
Council, and the City's Surface Water Management Plan will need to be
revised to reflect changes in LMRWMO policies and goals. The LMRWMO is
anticipating the updated plan to be completed by May 2011.
Future Cities Competition - Public Works Director Mazzitello and Assistant to
the City Administrator Jake Sedlacek have been working with students at
Friendly Hills Middle School on their projects for entry in the annual Future
Cities Competition. The teams from Friendly Hills have completed their
computer models using the popular SimCity software, and they are putting
the finishing touches on their city narratives and product research essays.
The next phase of the competition will require the teams to build scale
models of the cities they described in their narratives. More information
about the Future Cities competition can be found at the Success Beyond the
Classroom webpage www.successbeyond.org.
Highway 13/I -35E Interchange Drainage Improvements - Staff attended the
Lilydale City Council meeting on Monday afternoon to hear a presentation
from the Minnesota Department of Transportation (MnDOT) on their
proposed project along Highway 13. MnDOT is proposing a three -phased
project to reconstruct Highway 13 from Lilydale Road (County Road 45) to
approximately the Post Office site in Mendota. Once complete, issues of
stormwater drainage form the City of Mendota Heights into the City of
Lilydale should be addressed. The proposed phases are:
Phase I - Install traffic signals at the I -35E entrance and exit ramps
along Highway 13; connect sidewalk/trail in front of Holiday store; provide
Americans with Disabilities Act complaint crosswalks at entrance/exit ramp
intersections. This work is scheduled for 2011.
Phase 11 - Reconstruct Highway 13 from the City of Mendota to
approximately the site of the new Italian architecture villas in Lilydale.
Reconstruction would consist of new road base, new pavement, curb &
gutter., and storm sewer pipes. This work is scheduled for 2012.
Phase III - Reconstruct Highway 13 from the new Italian architecture
villas in Lilydale to the 1-35E entrance/exit ramp intersection near the
Holiday and BP stores. Reconstruction would consist of new road base,, new
pavement, curb & gutter, and storm sewer pipes. This work is estimated to
be under construction in 2015.
Water Main Breaks - There were a number of water main breaks this week,
and Engineering staff had to work quickly with Saint Paul Regional Water
Service (SPRWS) to identify the precise locations and severity of each
break. Through a quick response by staff, and excellent cooperation from
SPRWS, the leaks were identified and repaired quickly.
Wagon Wheel Reconstruction & Area Rehabilitation (2011 Streets Project) -
Staff is beginning to design the 2011 Project. Staff anticipated having a set
of 65% complete drawings by early spring. Once staff gets to that point in
the design, we intend to hold another neighborhood meeting to go over
design details with residents. Project construction is anticipated to begin in
June 2011.