Pipeline 10 22 2010N E W S
L E T T E R
Public Works
Engineering
Code Enforcement
Public Works
The Pipeline
October 22. 2010
The Parks Crew mulched leaves in the parks where needed. They helped the
Street Crew haul soil and level out the soil in the undeveloped, City owned Right -
of -Way between Second and Third Avenues. The Kubota was taken to Niebur for a
plow hookup. Broken sprinkler heads were repaired at City Hall.
Rich checked for bad spots in the sanitary sewer lines on Victoria Road, Highway
13, Fremont Avenue, Chippewa Avenue, Dodd Road, Ocala Court, Ocala Lane,
Pontiac Place, Keokuk Lane, Valley Curve Road, Callahan Place, and Ridgewood.
He assisted engineering in completing the infiltration test for the rain gardens on
Wagon Wheel Trail. Storm sewers were cleaned on the Warrior pond easement.
The Streets Crew hauled rip rap from Larson pit in Gray Cloud Island for work in
the city. They worked with P.A.C. and put down rip rap in the storm outlet that
empties into Rogers Lake from Swan Road. They also fixed the storm outlet that
had pulled apart from the pipe that empties into the holding pond next to
Lexington Avenue off Commerce Drive. Stump grindings were cleaned up and
filled with black dirt and seed. A dead ash tree in Ivy Falls Park was cut down.
The undeveloped, City -owned Right -of -Way between Second and Third Avenues
was worked on by filling in the tree stumps with black dirt and grass seed. The
large dip in the Right -of -Way was also filled in. They also blacktopped and
patched around catch basins there were recently repaired on Evergreen Knoll,
Medallion Drive and Fieldstone Drive. Last week fencing and signs were put up for
the Halloween bonfire. Streets were patched and potholes filled on Hunter Lane,
Orchard Place and Lake Drive.
Highway 55/Mendota Heights Road Intersection - Private utilities have been
relocated allowing the contractor to begin work on the street. Pavement has been
removed and new storm sewer installed east of TH 55. The contractor will begin
removing the pavement and installing storm sewer west of TH 55 Monday
(10/25). The expanded area will then be compacted and graded. The gravel base
is scheduled to be placed on Thursday (10/28) and new curb to be installed on
Friday (10/29). As always weather will determine the amount of work that can be
accomplished. Residents should be aware of traffic revisions at this
intersection due to construction through the end of December.
2010 Reconstruction/Rehabilitation Project - Council held the Assessment Hearing
for the project at their October 19th meeting, and approved the proposed
assessment rates recommended by Staff. The remaining final lift of asphalt (wear
course) is scheduled for the spring as we typically leave the wear course off of
areas
reas where there is a total pavement replacement or reconstruction in order to
identify any anomalies in the sub -structure during the freezing of the winter.
Streets still in need of wear course are Spring Street, Simard, Street, and John
street
Water Tower Rehabilitation - The Water Tower Project is essentially complete.
The contractor is finishing up some site cleaning issues, and completing
sterilization of the storage tank. Final Billing is anticipated sometime next month,
then the project can be closed out. This is the last time the City has to perform
maintenance on the Water Tower as maintenance responsibility is now transferred
to Saint Paul Regional Water Service per the terms of our contractual agreement.
2011 Street Reconstruction Project (Wagon Wheel Trail) - Council accepted the
Feasibility Report at their October 5th meeting. Staff is preparing for the informal
neighborhood meeting to be held at Holy Family Maronite Church (1960
Lexington Avenue South - across form City Hall) on October 28th, starting
at 6:30pm, and the upcoming formal Public Hearing before City Council. Public
Hearing is scheduled for the November 16th Council meeting. Notices will
be sent to the affected property owners informing them of the Public Hearing.
project is proposed to reconstruct Wagon Wheel Trail from Lexington Avenue to
Dodd Road, install storm sewer with curb & gutter, and provide for a pedestrian
trail. along the length of the project. Also proposed are the rehabilitation (mill &
overlay) of Alice Lane, Rodgers Court, and Swan Court, along with improvements
to 'Rogers Lake Park.
2011 Water Rate Increase - Saint Paul Regional Water Service has notified the
City that the Board of Water Commissioners has approved a proposed rate
increase for 2011. The proposed increase is roughly 5.45% over the existing rate.
The rate increase will need to be approved by the Saint Paul City Council. The
Council will meet on Wednesday November 3rd at their Council Chambers (3rd
floor, City Hall/Courthouse, 15 West Kellogg Boulevard) beginning at 5:30pm.
Fall Street Sweeping - Beginning today (10/22) the City will be sweeping selected
areas of the City to remove leaves and debris from the curb and gutter lines. This
is being done to prevent the leaves and other vegetative waste and debris from
getting into the storm sewer system, and ultimately to our storm water treatment
ponds. Staff is hopeful that this can become an annual activity in future years.