Pipeline 12 10 2010NEWS`
The Pipeline'-14-1.`�
LETTER
Public Works
Engineering
Code Enforcement December 10, 2010' j
Public Works
The Parks Crew plowed the cul-de-sacs, parking lots, rinks, and pedestrian
trails. They are flooding the hockey and general skating rinks. The hockey
goals are being prepared by hanging new netting on the goals. They also
helped the Street Crew plow sidewalks and decks on the bridges.
Rich plowed the middle south area. He identified a storm pipe for
Engineering on Marie Ave. Three new hydrant flags were installed. New
batteries for the generator were installed at the main lift station. Pump one
was pulled for repair with new seals and bearings at the main lift station.
The Streets Crew plowed and salted all city streets after the seven inch
snowfall. All plow trucks were washed and the sanders steam cleaned. The
bridge decks on Mendota Heights Road, Wagon Wheel Trail, and Acacia
Boulevard were cleaned. John Ambrose welded a frame that was cracked
on a pick up plow truck. He also welded the curb rubber for the wing. The
snow pile was pushed back in the Village at Maple Street and Linden Street.
Engineering
Highway 55/Mendota Heights Road Intersection - The project has
essentially buttoned up for the winter. New curb has been installed and the
base course of asphalt is placed. The lighting and signal modifications are
completed, and temporary striping has been put on the pavement. Traffic
controls have been removed, as has all the construction equipment. The
wear course of asphalt and final landscaping and seeding will be completed
in the spring.
2011 Street Reconstruction Project (Wagon Wheel Traill - The formal Public
Hearing before City Council was concluded on December 7th. Council
ordered plans and specifications to be prepared for the project as proposed
with five modifications from the original proposal: 1) the width of Wagon
Wheel Trail is to be narrowed to 26 feet (from 33 feet) at the intersections
with Swan Court, Rogers Court, and Alice Lane; 2) the pedestrian trail is to
end at the Curley's Addition trail head just west of I -35E bridge; 3) the
pedestrian trail is be located no further than four feet from the back of the
curb (except at intersections); 4) The 'bulb" of the Alice Lane cul-de-sac will
receive a mill & overlay treatment rather than a full pavement replacement,
and; 5) barrier style curb & gutter is to be used throughout the length of the
project. The project will also include improvements to Rogers Lake Park.
Gun Club Lake Watershed Management Organization (GCLWMO) - Staff
attended the quarterly meeting of the GCLWMO on Wednesday afternoon. A
presentation was given updating the WMO Board on the progress the City of
Eagan is making on the Schwanz Lake water quality restoration project.
Also consultant service contracts were approved. The next GCLWMO
meeting is scheduled for January 12, 2011.
Future Cities Competition - Public Works Director Mazzitello and Assistant to
the City Administrator Jake Sedlacek have been working with students at
Friendly Hills Middle School on their projects for entry in the annual Future
Cities Competition. The teams from Friendly Hills have completed their
computer models using the popular SimCity software, and they are currently
working on their project narratives and scale models. Information about the
Future Cities competition can be found at www.successbeyond.org.
Dodge Nature Center Utility Connection - Staff has been working with the
current owner of a large parcel adjacent to the Dodge Nature Center, as well
as with potential buyers on the planning applications that would be required
based on buyers' proposals. The lot currently supplies water to the Huber
Drive cabin located within the Dodge Nature Center. Upon property sale,
the cabin may be required to connect to City utilities. The initial assessment
for utility installation was deferred, and Council directed staff to work out a
payment schedule agreement with Dodge Nature Center for payment of the
deferred assessment.
Highway 13/I -35E Interchange Drainage Improvements - The Minnesota
Department of Transportation (MnDOT) is proposing a project to correct
significant drainage issues along Highway 13 at the I -35E intersection and
southwest through Lilydale. MnDOT will be at the December 13th (Monday)
Lilydale City Council meeting to present the project. If Mendota Heights
City Council desires a presentation on the project, MnDOT will schedule a
time at a future Council meeting. Engineering staff plans on attending the
Lilydale City Council Meeting on Monday.