Loading...
Pipeline 12 10 2010NEWS` The Pipeline'-14-1.`� LETTER Public Works Engineering Code Enforcement December 10, 2010' j Public Works The Parks Crew plowed the cul-de-sacs, parking lots, rinks, and pedestrian trails. They are flooding the hockey and general skating rinks. The hockey goals are being prepared by hanging new netting on the goals. They also helped the Street Crew plow sidewalks and decks on the bridges. Rich plowed the middle south area. He identified a storm pipe for Engineering on Marie Ave. Three new hydrant flags were installed. New batteries for the generator were installed at the main lift station. Pump one was pulled for repair with new seals and bearings at the main lift station. The Streets Crew plowed and salted all city streets after the seven inch snowfall. All plow trucks were washed and the sanders steam cleaned. The bridge decks on Mendota Heights Road, Wagon Wheel Trail, and Acacia Boulevard were cleaned. John Ambrose welded a frame that was cracked on a pick up plow truck. He also welded the curb rubber for the wing. The snow pile was pushed back in the Village at Maple Street and Linden Street. Engineering Highway 55/Mendota Heights Road Intersection - The project has essentially buttoned up for the winter. New curb has been installed and the base course of asphalt is placed. The lighting and signal modifications are completed, and temporary striping has been put on the pavement. Traffic controls have been removed, as has all the construction equipment. The wear course of asphalt and final landscaping and seeding will be completed in the spring. 2011 Street Reconstruction Project (Wagon Wheel Traill - The formal Public Hearing before City Council was concluded on December 7th. Council ordered plans and specifications to be prepared for the project as proposed with five modifications from the original proposal: 1) the width of Wagon Wheel Trail is to be narrowed to 26 feet (from 33 feet) at the intersections with Swan Court, Rogers Court, and Alice Lane; 2) the pedestrian trail is to end at the Curley's Addition trail head just west of I -35E bridge; 3) the pedestrian trail is be located no further than four feet from the back of the curb (except at intersections); 4) The 'bulb" of the Alice Lane cul-de-sac will receive a mill & overlay treatment rather than a full pavement replacement, and; 5) barrier style curb & gutter is to be used throughout the length of the project. The project will also include improvements to Rogers Lake Park. Gun Club Lake Watershed Management Organization (GCLWMO) - Staff attended the quarterly meeting of the GCLWMO on Wednesday afternoon. A presentation was given updating the WMO Board on the progress the City of Eagan is making on the Schwanz Lake water quality restoration project. Also consultant service contracts were approved. The next GCLWMO meeting is scheduled for January 12, 2011. Future Cities Competition - Public Works Director Mazzitello and Assistant to the City Administrator Jake Sedlacek have been working with students at Friendly Hills Middle School on their projects for entry in the annual Future Cities Competition. The teams from Friendly Hills have completed their computer models using the popular SimCity software, and they are currently working on their project narratives and scale models. Information about the Future Cities competition can be found at www.successbeyond.org. Dodge Nature Center Utility Connection - Staff has been working with the current owner of a large parcel adjacent to the Dodge Nature Center, as well as with potential buyers on the planning applications that would be required based on buyers' proposals. The lot currently supplies water to the Huber Drive cabin located within the Dodge Nature Center. Upon property sale, the cabin may be required to connect to City utilities. The initial assessment for utility installation was deferred, and Council directed staff to work out a payment schedule agreement with Dodge Nature Center for payment of the deferred assessment. Highway 13/I -35E Interchange Drainage Improvements - The Minnesota Department of Transportation (MnDOT) is proposing a project to correct significant drainage issues along Highway 13 at the I -35E intersection and southwest through Lilydale. MnDOT will be at the December 13th (Monday) Lilydale City Council meeting to present the project. If Mendota Heights City Council desires a presentation on the project, MnDOT will schedule a time at a future Council meeting. Engineering staff plans on attending the Lilydale City Council Meeting on Monday.