Loading...
Pipeline 12 03 2010NEWS LETTER The Pipeline Public Works Engineering Code Enforcement December 3, 2010 Public Works The Parks Crew is busy preparing the skating rinks for flooding. Pedways and parking lots were cleaned of snow. Low hanging limbs on the pedways were trimmed on Victoria Curve and Marie Avenue. Rich changed the pump guide rails at the Centre Pointe lift station. He did an inspection repair to service at 1005 Marie Avenue. He cleaned the sewer line on Dodd Road near the Par 3. He helped plow the city streets. The Streets Crew salted all city streets during the freezing rain storm. Lexington Avenue at Douglas Road was closed until the city salted the road for the county. Rich helped the fire department on the 35E ramp by salting the road and Andy helped the fire department on Highway 110 by salting the road because of a four car pileup. Salt was piled up in the bin. All plow trucks were washed, steam cleaned, sanders and wings greased, and leaking hydraulic hoses replaced. The no passing sign was replaced on Victoria Road. New street signs and posts were installed at Pondview Drive and Huber Drive. Engineering Highway 55/Mendota Heights Road Intersection - The project has essentially buttoned up for the winter. New curb has been installed and the base course of asphalt is placed. The lighting and signal modifications are completed, and temporary striping has been put on the pavement. The wear course of asphalt and final landscaping and seeding will be completed in the spring. 2011 Street Reconstruction Project (Wagon Wheel Traill - The formal Public Hearing before City Council was held on November 16th. The Public Hearing was continued to the December 7th Council meeting due to not having four Council Members present at the November 16th meeting. Staff held an information neighborhood meeting on the upcoming project on Thursday (10/28) evening at the Holy Family Church, across from City Hall. Roughly 40 residents attended. Concerns from attendees focused on speed and/or volume of traffic, storm water drainage, pedestrian safety, trail construction, stop sign placement, and assessment valuation and payment. Staff is proposing a few minor design options in an attempt to address some of the residents' concerns with the project, and these options will be presented at the December 7t" Council Meeting. Project is proposed to reconstruct Wagon Wheel Trail from Lexington Avenue to Dodd Road, install storm sewer with curb & gutter, and provide for a pedestrian trail along the length of the project. Also proposed are the rehabilitation (mill & overlay) of Alice Lane, Rogers Court, and Swan Court, along with improvements to Rogers Lake Park. Delaware Reconstruction - Staff met with representatives from Dakota County and Saint Paul Regional Water Services to go over the final design plans for the Delaware Reconstruction project. The project is currently in the Right -of -Way and easement acquisition phase, and construction is on schedule and anticipated for summer of 2011. Engineering Web Site - Staff is working with the Information Technology Department on creating the Engineering Department pages for the City web site. Once complete the Engineering page will have a place for project updates where residents can look up the status of their neighborhood projects. Stormwater management plans and the Street Improvement Plan are also posted on the web page for public review. American Public Works Association (APWA) Conference - Public Works Director Mazzitello attended the annual APWA Fall Conference. New techniques in snow removal, project engineering, and public involvement were main topics at the conference. Future Cities Competition - Public Works Director Mazzitello and Assistant to the City Administrator Jake Sedlacek have been working with students at Friendly Hills Middle School on their projects for entry in the annual Future Cities Competition. The competition is for Middle School students who work in groups to plan the layout and function of a City given a list of rules and parameters provided by the competition staff. Judging for the competition is held each January.