November 19, 2010
The Parks Crew checked out and hooked up plows to the pickup trucks. The
cul-de-sacs, parking lots and pedways were plowed. Downed tree limbs
were cleaned up from pedways after the winter storm. The snow was
packed down snow on the rinks to drive the frost into the ground to prepare
them for flooding.
Rich plowed the lift station parking lots. He did his snow plow route on
Saturday and Sunday. He repaired the toiles in the women's bathroom at
City Hall. He cleaned the floats at the Veronica lift station.
The Streets Crew put on the plows, sanders, and wings on the plow trucks.
They plowed all city streets last weekend after the eight inch snowfall.
Broken trees limbs were cleaned up after the storm. The bridge decks on
Mendota Heights Road, Wagon Wheel Trail and Acacia were cleaned.
Engineering
Highway 55/Mendota Heights Road Intersection -Pavement installation is
completed for the year. The final driving surface will be installed in 2011.
Temporary striping is scheduled for Friday (11/19) and the signal is
expected to be operational by Tuesday (11/23). As always weather will
determine the amount of work that can be accomplished and will largely
drive the construction schedule. Residents should be aware of traffic
revisions at this intersection due to construction through the end of
December.
2011 Street Reconstruction Project (Wagon Wheel Trails - The formal
Public Hearing before City Council was held on November 16th. A
number of residents affected by the project attended the meeting to oppose
and support the project. They full council panel was not in attendance to
make a final determination and the public hearing was carried over to the
next meeting on Tuesday, December 7, 2010. Project is proposed to
reconstruct Wagon Wheel Trail from Lexington Avenue to Dodd Road, install
storm sewer with curb & gutter, and provide for a pedestrian trail along the
length of the project. Also proposed are the rehabilitation (mill & overlay)
of Alice Lane, Rodgers Court, and Swan Court, along with improvements to
Rogers Lake Park.
Delaware Avenue Reconstruction -Staff continues to work with Dakota
county on plans for the reconstruction of Delaware Avenue between Hwy
110 and Marie Avenue. Plans are scheduled to be completed by the end of
November to submit to MNDOT for approval.