Loading...
Pipeline 11 05 2010NEWS LETTER Public Works Engineering Code Enforcement Public Works The CHANGE YOUR CLOCK x CHANGE YOUR BATTERY Pipeline November 5, 2010 The Parks Crew moved things back into the water tower from the back parking lot. A fence was repaired at the old fire hall site. The general skating rink at Ivy Falls Park was leveled out after enlarging it. The pedways were surveyed. 3-' Rich prepared the air conditioning and heating for the winter at the Mendota Heights Road lift station. He put on new belts, filters and greased the bearings. He met with Patterson Dental about the fat, oil, & grease that should not be dumped into the sanitary sewer line. He inspected sewers on Waters Drive. Mulched leaves at the Veronica lift station. The Streets Crew brought brush to the Halloween bonfire that was collected on Sutton Lane at Marie Avenue and Junction Lane. The fence, post and gate were taken down from the bonfire. Tim helped Cliff put new brakes on dump truck 303. A TV was picked up from Spring Street. Engineering Highway 55/Mendota Heights Road Intersection - Private utility relocations are complete, and the contractor has been working on the road base. Pavement is expected to begin next week (11/8). Once the first lanes of pavement are installed, traffic will be diverted onto the new asphalt and work will continue in the traffic free areas. Curb & Gutter installation is ongoing. As always weather will determine the amount of work that can be accomplished and will largely drive the construction schedule. Residents should be aware of traffic revisions at this intersection due to construction through the end of December. 2011 Street Reconstruction Project (Wagon Wheel Traill - Staff held an information neighborhood meeting on the upcoming project on Thursday (10/28) evening at the Holy Family Church on Lexington, across form City Hall. Roughly 40 residents attended. Concerns from attendees centered around speed and/or volume of traffic, storm water drainage, trail construction, stop signs, assessment valuation and payment. A summary will be presented as part of the formal Public Hearing before City Council scheduled for the November 16th Council meeting. Notices have been sent to the affected property owners informing them of the Public Hearing. Project is proposed to reconstruct Wagon Wheel Trail from Lexington Avenue to Dodd Road, install storm sewer with curb & gutter, and provide for a pedestrian trail along the length of the project. Also proposed are the rehabilitation (mill & overlay) of Alice Lane, Rogers Court, and Swan Court, along with improvements to Rogers Lake Park. 2011 Water Rate Increase (FINAL REMINDERS - Saint Paul Regional Water Service has notified the City that the Board of Water Commissioners has approved a proposed rate increase for 2011. The proposed increase is roughly 5.45% over the existing rate. The rate increase was heard by the Saint Paul City Council on Wednesday November 3rd. Staff has not yet received a report from Saint Paul Regional Water Service as to the outcome of the meeting. Trail Gap & Repair Prioritization Meeting - Engineering, Planning and Public Works Staff met on Thursday morning to go over an analysis of the City Trail System. Gaps in the system were identified, and PW Staff provided a condition assessment of the trails. Engineering Staff will compile the information into a list of projects prioritized into three groups: immediate need, short-term need, and long-term need. This list will then be presented to Council for commend and/or concurrence. Once the list is approved, Staff intends to develop a Trails plan similar in nature to the Street Improvement Plan.