Loading...
Pipeline 10 29 2010NEWS LETTER Public Works Engineering Code Enforcement Public Works The Pipeline October 29, 2010 . I I. a En m M pPtyJ !e1n The Parks Crew serviced equipment. They also washed and waxed trucks. Downed trees and limbs from the storm were cleaned up and cut up from the parks. There were downed trees in Valley Park, Wentworth Park and Rogers Lake. Leaves were mulched as needed. Rich provided and operated the jet for the water tower tank cleaning. The power went out at 8:OOpm, Tuesday and at 2:15am Wednesday at the Culligan, Veronica, Centre Pointe and Lilydale lift station. The generator was run at the lift stations. Batteries were changed on the trailer mounted generator. He also attended pesticide applicators recertification school. The Streets Crew installed news signs and posts. No outlet signs and crime watch signs were installed at the beginning of Victory Avenue, Kendon Lane, Furlong Avenue, Lakeview Drive and at the Augusta Shores development. Pearson Bros. brought in sweepers and swept up leaves along curbs and gutters. The bonfire brush pile was pushed up. Dakota County Communication Center called to report a large willow tree blocking Victoria Curve. There were also trees down that were blocking roads in the Bunker Hills area. Willow tree branches were cleared off Lexington Avenue. Engineering Highway 55/Mendota Heights Road Intersection - Private utilities have been relocated allowing the contractor to begin work on the street. Pavement has been removed and new storm sewer installed east of TH 55. Pavement has been removed, the road expansion is being graded and compacted, and the gravel base installation has begun. New storm sewer is being installed and new curb and gutter installation is scheduled to begin today (10/29). The first lift of asphalt is expected late next week along with remaining Right -of -Way grading and possible seeding. As always weather will determine the amount of work that can be accomplished and will largely drive the construction schedule. Residents should be aware of traffic revisions at this intersection due to construction through the end of December. Water Tower Rehabilitation - The new strobe lights on top of the water tower have been turned on signaling the completion of the project. The contractor is cleaning up the site and we anticipate final billing being processed in November. Saint Paul Regional Water Service is now responsible for maintenance of the water tower, but the City is retaining ownership of the facility. 2011 Street Reconstruction Project (Wagon Wheel Traill - Staff held an information neighborhood meeting on the upcoming project on Thursday (10/28) evening at the Holy Family Church on Lexington, across form City Hall. Roughly 40 residents attended. After a short presentation from Staff, residents asked questions and voiced their concerns. Most of the concerns centered around speed and/or volume of traffic, storm water drainage, trail construction, stop signs, and assessment valuation and payment. This information will be presented as part of the formal Public Hearing before City Council Public Hearing is scheduled for the November 16th Council meeting. Notices will be sent to the affected property owners informing them of the Public Hearing. Project is proposed to reconstruct Wagon Wheel Trail from Lexington Avenue to Dodd Road, install storm sewer with curb & gutter, and provide for a pedestrian trail along the length of the project. Also proposed are the rehabilitation (mill & overlay) of Alice Lane, Rodgers Court, and Swan Court, along with improvements to Rogers Lake Park. 2011 Water Rate Increase - Saint Paul Regional Water Service has notified the City that the Board of Water Commissioners has approved a proposed rate increase for 2011. The proposed increase is roughly 5.45% over the existing rate. The rate increase will need to be approved by the Saint Paul City Council. The Council will meet on Wednesday November 3rd at their Council Chambers (3rd floor, City Hall/Courthouse, 15 West Kellogg Boulevard) beginning at 5:30pm.