The Parks Crew serviced equipment. They also washed and waxed trucks.
Downed trees and limbs from the storm were cleaned up and cut up from
the parks. There were downed trees in Valley Park, Wentworth Park and
Rogers Lake. Leaves were mulched as needed.
Rich provided and operated the jet for the water tower tank cleaning. The
power went out at 8:OOpm, Tuesday and at 2:15am Wednesday at the
Culligan, Veronica, Centre Pointe and Lilydale lift station. The generator
was run at the lift stations. Batteries were changed on the trailer mounted
generator. He also attended pesticide applicators recertification school.
The Streets Crew installed news signs and posts. No outlet signs and crime
watch signs were installed at the beginning of Victory Avenue, Kendon Lane,
Furlong Avenue, Lakeview Drive and at the Augusta Shores development.
Pearson Bros. brought in sweepers and swept up leaves along curbs and
gutters. The bonfire brush pile was pushed up. Dakota County
Communication Center called to report a large willow tree blocking Victoria
Curve. There were also trees down that were blocking roads in the Bunker
Hills area. Willow tree branches were cleared off Lexington Avenue.
Engineering
Highway 55/Mendota Heights Road Intersection - Private utilities have been
relocated allowing the contractor to begin work on the street. Pavement
has been removed and new storm sewer installed east of TH 55. Pavement
has been removed, the road expansion is being graded and compacted, and
the gravel base installation has begun. New storm sewer is being installed
and new curb and gutter installation is scheduled to begin today (10/29).
The first lift of asphalt is expected late next week along with remaining
Right -of -Way grading and possible seeding. As always weather will
determine the amount of work that can be accomplished and will largely
drive the construction schedule. Residents should be aware of traffic
revisions at this intersection due to construction through the end of
December.
Water Tower Rehabilitation - The new strobe lights on top of the water
tower have been turned on signaling the completion of the project. The
contractor is cleaning up the site and we anticipate final billing being
processed in November. Saint Paul Regional Water Service is now
responsible for maintenance of the water tower, but the City is retaining
ownership of the facility.
2011 Street Reconstruction Project (Wagon Wheel Traill - Staff held an
information neighborhood meeting on the upcoming project on Thursday
(10/28) evening at the Holy Family Church on Lexington, across form City
Hall. Roughly 40 residents attended. After a short presentation from Staff,
residents asked questions and voiced their concerns. Most of the concerns
centered around speed and/or volume of traffic, storm water drainage, trail
construction, stop signs, and assessment valuation and payment. This
information will be presented as part of the formal Public Hearing before
City Council Public Hearing is scheduled for the November 16th
Council meeting. Notices will be sent to the affected property owners
informing them of the Public Hearing. Project is proposed to reconstruct
Wagon Wheel Trail from Lexington Avenue to Dodd Road, install storm
sewer with curb & gutter, and provide for a pedestrian trail along the length
of the project. Also proposed are the rehabilitation (mill & overlay) of Alice
Lane, Rodgers Court, and Swan Court, along with improvements to Rogers
Lake Park.
2011 Water Rate Increase - Saint Paul Regional Water Service has notified
the City that the Board of Water Commissioners has approved a proposed
rate increase for 2011. The proposed increase is roughly 5.45% over the
existing rate. The rate increase will need to be approved by the Saint Paul
City Council. The Council will meet on Wednesday November 3rd at their
Council Chambers (3rd floor, City Hall/Courthouse, 15 West Kellogg
Boulevard) beginning at 5:30pm.