Loading...
Pipeline 10 08 2010NEWS The Pipeline LETTER Public Works Engineering October 8, 2010 Code Enforcement Public Works The Parks Crew prepared the grounds at the fire hall for the Fire Prevention Open House. Truck 503 was serviced for winter (new tires, etc). The driver's seat was taken out of truck 501 for repairs. Extra playground equipment was picked up at Mendakota Park and put in storage. The Street Crew dug up two broken storm basins, bricked them up and mudded them. One was on Evergreen Knoll and the other on Fieldstone Drive. No parking signs were reinstalled (that had been spray painted) on Warrior Drive. Eight barricades were dropped off and picked up for the Vice President's motorcade on Tuesday. They were used on Highway 13 at Highway 110 and Lexington Avenue and Highway 110. Tom along with the Street Crew went to the St. Could Fall Maintenance Expo. Engineering Highway 55/Mendota Heights Road Intersection - The construction project has begun. Existing pavement is being cut and removed, and improvement areas have been marked and staked. Residents should be aware of traffic revisions at this intersection through the end of December. 2010 Reconstruction/Rehabilitation Project - Work for the 2010 portion of the project is substantially complete with small, punch -list items remaining. Remaining portions of wear course asphalt on Butler and Ivy Falls Park, Spring Street, and Simard Street will be completed in the spring of 2011. Assessment hearing for the completed project will be held at Council at the October 19th meeting. Water Tower Rehabilitation - Although this project was planned to be complete by September 30th, there remains a small amount of work yet to be completed. Most of the letters have been painted, and the entire body of the tower is complete. Barring any further weather delays (wind can cause a delay in painting), Staff estimates the tower will be substantially complete by the end of next week. 2011 Street Reconstruction Project (Wagon Wheel Trail) - Council accepted the Feasibility Report for the 2011 Street Reconstruction Project at the October 5th meeting. The project will reconstruct Wagon Wheel Trail from Lexington to Dodd Road and will include the installation of storm sewer, curb & gutter, and an 8 -foot bituminous trail along the length of the project. Public hearing is scheduled at the November 16th Council Meeting. Mendota Heights Road/Visitation Drive Roundabout - Staff met with the leadership of the Visitation School at their monthly Roads and Grounds Committee meeting on Wednesday (Oct 6). Visitation School stated they were "very pleased and grateful to the City" for completing the project. The parents and faculty that drive the roundabout every day are pleased both with the reduced queue time at the intersection, but with the increased safety at the intersection as well.