Pipeline 10 08 2010NEWS The Pipeline
LETTER
Public Works
Engineering October 8, 2010
Code Enforcement
Public Works
The Parks Crew prepared the grounds at the fire hall for the Fire Prevention
Open House. Truck 503 was serviced for winter (new tires, etc). The
driver's seat was taken out of truck 501 for repairs. Extra playground
equipment was picked up at Mendakota Park and put in storage.
The Street Crew dug up two broken storm basins, bricked them up and
mudded them. One was on Evergreen Knoll and the other on Fieldstone
Drive. No parking signs were reinstalled (that had been spray painted) on
Warrior Drive. Eight barricades were dropped off and picked up for the Vice
President's motorcade on Tuesday. They were used on Highway 13 at
Highway 110 and Lexington Avenue and Highway 110. Tom along with the
Street Crew went to the St. Could Fall Maintenance Expo.
Engineering
Highway 55/Mendota Heights Road Intersection - The construction project
has begun. Existing pavement is being cut and removed, and improvement
areas have been marked and staked. Residents should be aware of
traffic revisions at this intersection through the end of December.
2010 Reconstruction/Rehabilitation Project - Work for the 2010 portion of
the project is substantially complete with small, punch -list items remaining.
Remaining portions of wear course asphalt on Butler and Ivy Falls Park,
Spring Street, and Simard Street will be completed in the spring of 2011.
Assessment hearing for the completed project will be held at Council at the
October 19th meeting.
Water Tower Rehabilitation - Although this project was planned to be
complete by September 30th, there remains a small amount of work yet to
be completed. Most of the letters have been painted, and the entire body of
the tower is complete. Barring any further weather delays (wind can cause
a delay in painting), Staff estimates the tower will be substantially complete
by the end of next week.
2011 Street Reconstruction Project (Wagon Wheel Trail) - Council accepted
the Feasibility Report for the 2011 Street Reconstruction Project at the
October 5th meeting. The project will reconstruct Wagon Wheel Trail from
Lexington to Dodd Road and will include the installation of storm sewer,
curb & gutter, and an 8 -foot bituminous trail along the length of the project.
Public hearing is scheduled at the November 16th Council Meeting.
Mendota Heights Road/Visitation Drive Roundabout - Staff met with the
leadership of the Visitation School at their monthly Roads and Grounds
Committee meeting on Wednesday (Oct 6). Visitation School stated they
were "very pleased and grateful to the City" for completing the project. The
parents and faculty that drive the roundabout every day are pleased both
with the reduced queue time at the intersection, but with the increased
safety at the intersection as well.