Loading...
Pipeline 10 01 2010NEWS LETTER The Pipeline Public Works Engineering(:: Code Enforcement October 1, 2010 Public Works The Parks Crew attached the mulching kit to the #500 xmack mower for the fall mulching of leaves. They repaired the hydraulic line on the #5900 groundmaster mower. The Streets Crew cut back trees that were on the shoulder and hanging over the road on Coleshire Lane. They started trimming trees on Emerson Avenue and Dodd Road. Tree limbs were also trimmed at Copperfield and Delaware Avenue. Storm sewer grates were cleaned. They filled in a well holding tank with sand on a city lot on the west end of the city. The repair of storm sewer pipes was started on Annapolis Street at Chippewa Avenue and Medallion Drive at Lexington Avenue. Cones and barricades were dropped off at the Police Department. Engineering Picture of well discovered at 1181 Bourn Lane. Photo by Terry Blum Highway 55/Mendota Heights Road Intersection - The construction project has begun. Temporary traffic signals at the intersection have been installed, safety markings and signs are in place, and the project is being surveyed and marked for upcoming demolition. Residents should be aware of traffic revisions at this intersection through the end of December. 2010 Reconstruction/Rehabilitation Project - Work for the 2010 portion of the project is substantially complete with small, punch -list items remaining. Remaining portions of wear course asphalt on Butler and Ivy Falls Park, Spring Street, and Simard Street will be completed in the spring of 2011. Assessment hearing for the completed project will be held at the October 19th City Council meeting. The final mailboxes were re -installed by the contractor this past week. Water Tower Rehabilitation - The painting of the tower body is substantially complete. Weather (rain and wind) prevented the contractor from meeting their previously stated September 30th completion date, but with the cooperation of the weather, the tower project should be substantially complete by the end of this coming week. 2011 Street Reconstruction Project (Wagon Wheel Traill - Staff has completed the Feasibility Report for the 2011 Street Reconstruction Project and it is scheduled to be presented to Council at the October 5th meeting. The project will reconstruct Wagon Wheel Trail from Lexington to Dodd Road and will include the installation of storm sewer, curb & gutter, and an eight foot bituminous trail along the length of the project. Sewer Lining Contract - Each year the City contracts out services to clean, video inspect/record, and line portions of our sanitary sewer system. The cleaning and video recording contract was awarded earlier this year, and the sewer lining work is scheduled to be before Council at their October 5th meeting. These projects allow the City to reduce the amount of groundwater and storm water that finds its way into our sanitary sewer system increasing the total volume the City contributes to the Metropolitan Council sewage treatment facilities. This in turn increases the amount we have to pay to Met Council as a City. Summit Development - Staff met with representatives form Opus Corporation on Thursday (Sep 29) to discuss the development of the final two twin -homes (4 units) a The Summit development at Wachtler and Highway 13. It is the intention of the parties involved to start construction in the spring. Lilydale Racquet Club Site - Staff was contacted last week by developers currently working on a proposed development plan through the City of Lilydale. The plan includes utility connections from the City of Mendota Heights. Once past accounts on the site have been settled, staff can continue work on connecting this area to City utilities.