Loading...
Pipeline 09 17 2010NEWS LETTER Public Works Engineering Code Enforcement Public Works The Pipeline a& September 17, 2010 The Parks Crew repaired sprinkler heads at city hall and repaired two sprinkler valves at the fire hall. The area along the pedway, east of Kensington Park, was leveled out; seed put down and raked out. Rich sprayed broadleaf weeds at Mendakota Park, fire hall, the city's lot next to Fishersville, Friendly Hills Park, and the city sign on Dodd Road. He inspected the storm sewer pipe at the new Walgreens that Veit put in. The Streets Crew put up new stop signs on Morson Circle, Knollwood Lane, and Emerson Avenue. New signs heads were put up on Aztec Lane and Creek Avenue. Blacktop was put down by the storm grate on Walsh Lane. Black dirt and seed was put down on the curb line, pot holes were also filled as was the ring manhole on Diane Road and Celia Drive. John Ambrose did welding on the grapple bucket for the bobcat. Spray paint was cleaned off a stop sign and no parking signs in Warrior Drive area. Engineering Highway 55/Mendota Heights Road Intersection - The pre -construction meeting was held on Tuesday (Sep 14). Bituminous Roadways of Mendota Heights was the successful bidder. The project should begin shortly. Construction signage will be placed at least one day prior to construction activity beginning. Residents should be aware of traffic revisions at this intersection beginning on or about September 15th and lasting for approximately 3 months. The project is scheduled for completion by mid-December. 2010 Reconstruction/Rehabilitation Project - Weather slightly delayed completion of paving. Remaining portions are on Butler Avenue, Ivy Falls Park, Spring Street, and Simard. Mailboxes are scheduled for re -installation by mid -week. Assessment Hearing for the completed project will be held at Council in October. Dodd Road Utility and Storm Drainage Work (MnDOT Project) - Dodd Road re -opened this past weekend. The utility repairs are complete, although MnDOT still needs to complete the boulevard landscaping and pavement striping. This is anticipated by the end of September. Water Tower Rehabilitation - The contractor has stated they are on track for a substantial completion of the water tower rehabilitation by Sep 30. Weather and a few unforeseen site conditions have delayed completion by a little over a month from the project's original completion date. Five small change orders will be presented to Council on Tuesday (Sep 21). These change orders will constitute approximately 1% of the total contract price. Gun Club Lake Watershed Management Organization (GCLWMO� - Staff attended the quarterly meeting of the GCLWMO on Wednesday (Sep 15) in Eagan where the annual report on Mendota Heights' Stormwater/Surface Water Management Program was provided. Concern from the Watershed over the water quality at Augusta Lake was discussed. August Lake has not yet shown up on any impaired waters lists, but the potential is there for the lake to be listed soon. Staff and City representative Larry Craighead pledged to work with DNR and Dakota County on formulating potential remedial plans for the Lake. Lower Mississippi River Watershed Management Organization (LMRWMOJ - Staff attended the monthly meeting of the LMRWMO on Thursday (Sep 16) in Inver Grove Heights where the development of the LMRWMO 10 -year Watershed Management Plan was the topic of conversation. The last Plan was approved in 2001, and WMOs are required to update the plan a minimum of every 10 years. The plan outlines goals and strategies for surface water management (both quality and quantity) for the entire watershed area. Local Government Units (Cities and County) are responsible for executing the plan. Nightly Closures of I-494 - MnDOT has informed city staff that road work on Interstate 494 between I -35E and 60th Street will be ongoing overnight from Sep 20th, 21St, 23rd and 27th. These closures will be form 8:OOpm until 5:OOam. There will also be periodic mid-day lane closures for utility work during this period. Dodd Road ramps to I-494 are anticipated to be closed during this period as well. In addition, the northbound I -35E on-ramp from Highway 110 will be closed for utility work for short periods next week.