The Parks crew laid out and striped five new soccer fields. Soccer goals
were hauled from Moreland School to the soccer fields in the parks. Picnic
tables were brought to Town Center for a concert. Hockey board repair and
painting of the boards continues.
Rich sprayed weeds in right-of-ways with round up total kill. He also
sprayed for broadleaf weeds in Ivy Falls Park, Wentworth Park, Valley Park,
Par 3 golf course, and Mendakota Park. He changed out pump #2 hour
meter at the Veronica lift station. The old one was broken. He was called in
at 6:00 PM and was here until 10:00 PM because of a power outage at the
Mendota Heights Road lift station.
The Streets Crew finished blacktopping Marie Avenue from Dodd Road to
Delaware Avenue and also finished blacktopping Warrior Drive.
Blacktopping was also done on Wagon Wheel Trail from Dodd Road to
Lexington Avenue. A red light was out on Mendota Heights Road and was
fixed. John Ambrose fixed the hood on the big parks mower. New cross
walk signs were put up at Decorah Lane at Huber Drive. The crosswalk sign
at Ivy Fall Park was replaced that had been vandalized by spray paint.
Engineering
Visitation Drive/Mendota Heights Road Roundabout - The roundabout is
open and substantially complete. Minor landscape and clean-up work
remains, and the permanent street lights need to be installed. The street
lights are anticipated to be installed by Mid -September. The temporary
access to Visitation from Lake Drive is removed and access blocked off.
Staff met Thursday with the Federal Highways Administration for the
mandatory audit of the project and everything went well. Staff was able to
provide documentation for everything the auditor was looking for.
Highway 55/Mendota Heights Road Intersection - The project is out for bid.
Bid opening is scheduled for 10:00am on August 23rd, and the project
should begin construction by September 15th. Residents should be
aware of traffic revisions at this intersection beginning on
September 15th and lasting for approximately 3 months. The project
is scheduled for completion by mid-December.
2010 Reconstruction/Rehabilitation Project - The contractor has nearly
completed installing driveway aprons. Curb replacement in the
rehabilitation area is underway. Existing pavement on Butler Avenue has
deteriorated beyond having a mill and overlay to rehabilitate the street. A
new base course will be installed and the road will be like new. Staff
projects the project may actually finish under budget. This could result in a
small reduction in the assessed value to residents benefiting from the
project.
Street Improvement Plan - Staff presented the 2011-2015 Street
Improvement Plan (SIP) to City Council at the 2011 Budget work session on
Tuesday. The SIP is a projection of the next 5 years for street
reconstruction, street rehabilitation, and utilization of the City's Municipal
State Aid financial account. A final version will be brought before Council for
public comment and formal adoption in the coming weeks.
2011 Reconstruction/Rehabilitation Projects - Staff has begun the
preliminary work on the 2011 Street Projects. Wagon Wheel Trail is
scheduled for reconstruction next year, and the Knollwood Neighborhood
roads (Knollwood Court, Knollwood Lane, Medora Court, Medora Lane, Ivy
Lane, Lower Colonial Drive, Upper Colonial Drive, Cherry Hill Road east of
Wachtler, and Farmdale Road east of Wachtler) are scheduled for
rehabilitation, commonly referred to as a mill -and -overlay. Preliminary
Plans and Feasibility Reports will be brought before Council in the coming
months.