Pipeline 08 13 2010NEWS The PipelineLETTER Public Works Engineering August 13, 2010 Code Enforcement Public Works The Parks Crew repaired ruts on Wachtler Avenue and Park Place. The side of the pedway was repaired in Kensington Park. Dirt was hauled in to level it out and grass seed was put down. The worn goal mouth was repaired at Kensington Park soccer field #2. A sprinkler valve and sprinkler heads were repaired at Kensington Park on the soccer field. A downed tree was removed from the pedway on Lexington Avenue and Marie Avenue. Rich cut trees and made a trail between the manholes on the trunk line on Marie Avenue downstream to the head house. There was also a lot of buckthorn to remove. This was done for the upcoming sanitary sewer cleaning project. He cleaned the sanitary sewer lines on Park Lane, Hampshire Court and Stone Road. The Streets Crew blacktopped potholes on Lilac Lane, Douglas Road, Mendota Heights Road from the bridge deck to Dodd Road and South Plaza Drive. A tree was pushed off Delaware Avenue that had fallen on the road. Blacktopping was started on Marie Avenue at Dodd Road to Delaware Avenue. Tim helped Cliff put a new radiator and transmission cooler in the John Deere backhoe. Engineering Visitation Drive/Mendota Heights Road Roundabout - The roundabout opened to traffic on Thursday (8/12), and Staff is already receiving compliments on the project. Minor improvements, such as complete lighting, are still needed and are estimated to be complete by Labor Day (9/6). The temporary access drive to Visitation School from Lake Drive should be removed by the end of next week (8/20). Highway 55/Mendota Heights Road Intersection - The project is out for bid. Bid opening is scheduled for August 23rd, and the project should begin construction by September 15th. Residents should be aware of traffic revisions at this intersection beginning on September 1St". The project is scheduled for completion by mid-December. 2010 Reconstruction/Rehabilitation Project - The contractor has been installing bituminous driveways. Curb was marked for replacement in the rehabilitation area. Existing pavement on Butler Avenue has deteriorated beyond having a mill and overlay to rehabilitate the street. A new base course will be installed and the road will be like new. Comprehensive Plan Update - Engineering Staff has been assisting Planning Staff on updating the City's 2030 Comprehensive Plan. Staff met with representatives from the Metropolitan Council, and has updated the Sanitary Sewer/Wastewater section of the plan to comply with Met Council comments.